Retvizan
Pre-Dreadnought Battleship
Specifications | |
---|---|
Designer: | .. |
Builder: | .. |
Displacement (standard): | .. tons |
Displacement (full load): | .. tons |
Speed (kts): | .. knots |
Length (m): | .. meters / feet |
Beam (m): | .. meters |
draft (m): | .. meters |
Propulsion: | .. |
Speed: | .. |
Endurance: | .. |
Missiles: | .. |
Guns: | .. |
Aircraft: | .. |
Electronics: | .. |
Crew: | .. |
Name | Keel Laid |
Launch | Comm | Builder | Notes |
---|---|---|---|---|---|
Retvizan (later Japanese Hizen) | May 1898 | 23 Oct 1900 | Cramp |
Dec 1904 Sunk at Port Arthur 2 Jan 1905 Captured by Japan 20 Sep 1923 strikecn July 1924 Sunk as target |
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|