| The Project BPKT The Northern Yard
|
| Project number | 767
|
| Explicit codename project | Brown
|
| Shipbuilding construction number | 19 (B19)
|
| Construction Shipyard | Northern Shipyard in Gdansk
|
| NATO code | BAL-COM-11, Lublin
|
| L max (maximum length) | 95.8 m
|
| L c (length overall) | 91,2 m
|
| L w (length at waterline) | 84,9 m
|
| L pp (length between perpendiculars) | 81,0 m
|
| (B) (width) | 10.8 m
|
| H (to the main deck) (height of the lateral) | 4.9 m
|
| H (the deck) (height of the lateral) | 5.2 m
|
| (D) (displacement of the empty ship) | 1210 t
|
| N m (maximum load) | 536 t
|
| P m (maximum load capacity) | 369 t
|
| (D) p (long N = 465 t and P = 369 t) (displacement full) | 1675 t
|
| T- (draft for D p) | 2,3 m
|
| D m (for N = 536 t and P = 369 t) (maximum displacement) | 1745 t
|
| T m (draft, maximum) | 2.38 m
|
| V m (maximum speed) | 16.5 in
|
| With (range) | 1500 km
|
| Manning | 37
|
| manning special | 135 people
|
| Main propulsion |
3 internal combustion engines
Cegielski-Sulzer 6ATL25D 1320 kW (1800 HP) at 1000 rpm.,
four-stroke supercharged with Turbo compressors,
driving straight through the gear shaft lines
3 fixed propellers working in solid jets.
|
| Generators |
3 teams with a power of 250 kVA 1500 rpm,
voltage 3x400V 50 Hz 1/each, consisting of
compression ignition engine and generator.
|
| Cargo |
Parking for 9 places with a maximum load per unit up to 45 t can arrange:
9 vehicles with a width of more than 2.5 m (e.g., tanks T-72, T-55/54, PT-76, armoured EVENT TOPAS, MT-LB, technical security cars ARV-1) or
17 vehicles with a width of up to 2,5 m (armoured BRDM-2, lorries) or
instead of a cargo of landing you can install 2 tracks of sea mines from the load from 50 to 134 minutes in depending on the type.
|
| Armament |
4 x marine sets rocket-artillery ZU-23-2MR "Sparrow II", each consisting of 23 mm cannons and a double double launch missiles Strzala-2 m "pieces"
set of passive interference "Corncrake" consisting of 12 x XII fixed launch purposes apparent 70 mm
9 x 1 launch loads of extended-DST LWD-100/5000 "Pine" (installed according to needs)
6 dymnych candles.
|
| The technical equipment of passive and observation |
system of gathering information and depict the situation of combat
radar navigation "Nogat" SNA-7453
radar navigation SNA-443XTA
system of reconnaissance "its-foreign" "Composition-RR"
|
| Radionavigation and radiocommunication equipment, electronics |
integrated system for determining positions PROCYON-3.1
direction finder digital ARC-1404
receiver radionawigacyjny "Pier-2" (Decca)
receiver radionawigacyjny "Gals"
receiver radionavigation systems AD-2
gyro compass GKU-1
Compass KM-145-4
echo sounding 4501
electromagnetic 4601 dwuskladniowy log
wiatromierz KUB
Device filtrowentylacji and demagnetyzacyjne
|