EXECUTIVE SUMMARY
This Initial Navy Training System Plan (NTSP) for the Virtual Imaging System for Approach and Landing (VISUAL) was developed by the Naval Air Systems Command (AIR 3.4.1.1) using the Training Planning Process Methodology. This document provides an early estimate of the manpower, personnel, and training requirements to introduce and sustain the VISUAL acquisition program. These requirements will be further defined in updates to this document as the program matures.
VISUAL is a major system upgrade to the aircraft recovery monitoring and display systems aboard aircraft carriers and amphibious assault ships. The existing systems supporting the Landing Signal Officer (LSO) in assessing the pilot's performance on final approach are obsolete and inadequate in meeting current and future operational requirements. The VISUAL program will develop and integrate emerging technologies and data networks synergistically in order to provide critical information to the LSO and other decision makers on the ship.
VISUAL is currently in the Program Definition and Risk Reduction phase of the acquisition cycle. The acquisition strategy requires a heavy reliance on Non-Developmental Item, Commercial Off-The-Shelf, and Government Off-The-Shelf hardware, software, and firmware, repackaged for the shipboard operating environment.
Based on initial analysis, VISUAL will be maintained by the Interior Communications Electrician (IC) rating personnel with Navy Enlisted Classification (NEC) codes 4743 and 4745 aboard aircraft carriers. Aboard amphibious assault ships the maintainer will be ICs with NEC 4779. Aboard aircraft carriers, the operator function will be performed by LSOs with Navy Officer Billet Classification code 8662 and Integrated Launch And Recovery Television System (ILARTS) Operators (ICs) with NEC 4743. When Marines are embarked, Marines with the Military Occupational Specialty (MOS) 7593/7594 will perform the LSO function aboard aircraft carriers, and by MOS 7589 aboard amphibious assault ships.
The VISUAL training requirement includes both initial and follow-on training. Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, will provide initial training to maintainers and operators on a prototype system. Additional initial and follow-on training will be required as VISUAL training requirements mature. It is estimated that VISUAL training will be incorporated into existing courses and will not increase or decrease the lengths of these courses.
Page
Executive Summary i
List of Acronyms iii
Preface v
PART I - TECHNICAL PROGRAM DATA
A. Nomenclature-Title-Program I-1
B. Security Classification I-1
C. Manpower, Personnel, and Training Principals I-1
D. System Description I-1
E. Developmental Test and Operational Test I-2
F. Aircraft and/or Equipment/System/Subsystem Replaced I-2
G. Description of New Development I-2
H. Concepts I-3
I. Onboard (In-Service) Training I-11
J. Logistics Support I-12
K. Schedules I-12
L. Government-Furnished Equipment and Contractor-Furnished Equipment Training Requirements I-13
M. Related NTSPs and Other Applicable Documents I-13
APPENDIX A - POINTS OF CONTACT A-1
ABE |
Aviation Boatswain's Mate (Equipment) |
ADMACS |
Aviation Data Management And Control System |
ALREMP |
Aircraft Launch and Recovery Equipment Maintenance Program |
BIT |
Built-In Test |
CNO |
Chief of Naval Operations |
COTS |
Commercial Off-The-Shelf |
CV |
Aircraft Carrier |
CVN |
Multi-Purpose Aircraft Carrier, Nuclear |
EDM |
Engineering Development Model |
FMS |
Foreign Military Sales |
GOTS |
Government Off-The-Shelf |
HUD |
Head-Up Display |
IC |
Interior Communications Electrician |
ILARTS |
Integrated Launch And Recovery Television System |
IOC |
Initial Operational Capability |
LHA |
Landing Ship, Helicopter Assault |
LHD |
Multi-Purpose Amphibious Assault Ship |
LOC |
Limited Operational Capability |
LSO |
Landing Signal Officer |
MOS |
Military Occupational Specialty |
NAS |
Naval Air Station |
NATOPS |
Naval Air Training and Operating Procedures Standardization |
NATTC |
Naval Air Technical Training Center |
NAVAIRSYSCOM |
Naval Air Systems Command |
NAWCADLKE |
Naval Air Warfare Center Aircraft Division, Lakehurst |
NDI |
Non-Developmental Item |
NEC |
Navy Enlisted Classification |
NOBC |
Navy Officer Billet Classification |
NTSP |
Navy Training System Plan |
OPEVAL |
Operational Evaluation |
OPO |
OPNAV Principal Official |
ORD |
Operational Requirements Document |
PQS |
Personnel Qualification Standards |
SITU |
Stabilized Imaging and Tracking Unit |
TBD |
To Be Determined |
TECHEVAL |
Technical Evaluation |
TRPPM |
Training Planning Process Methodology |
VISUAL |
Virtual Imaging System for Approach and Landing |
VLA |
Visual Landing Aid |
PREFACE
This Initial Navy Training System Plan (NTSP) is a product of the Training Planning Process Methodology (TRPPM), as outlined in OPNAV Publication P-751-3-9-97, and is an early look at the concepts and requirements for the Virtual Imaging System for Approach and Landing (VISUAL) program. This is the second iteration of the Initial NTSP for the VISUAL program, updating the June 1999 version. This document explores the various employment and support alternatives currently under consideration. Since it is the Initial NTSP and still relatively early in the acquisition process, some definitive data was unavailable for inclusion in this version.
The VISUAL program is Increment III of the Aviation Data Management And Control System (ADMACS) Operational Requirements Document (ORD). Each increment is managed, funded, developed, and tested separately and will contribute to the overall ADMACS development objectives and address the specific requirements of that particular user community.
February 2000
PART I - TECHNICAL PROGRAM DATA
A. NOMENCLATURE-TITLE-PROGRAM
1. Nomenclature-Title-Acronym. Virtual Imaging System for Approach and Landing (VISUAL)
2. Program Element. 0604512N
B. SECURITY CLASSIFICATION
1. System Characteristics Unclassified
2. Capabilities Unclassified
3. Functions Unclassified
C. MANPOWER, PERSONNEL, AND TRAINING PRINCIPALS
OPNAV Principal Official (OPO) Program Sponsor CNO (N885D)
OPO Resource Sponsor CNO (N885D)
Developing Agency NAVAIRSYSCOM (PMA251E)
Training Agency CINCLANTFLT (N721)
CINCPACFLT (N70)
CNET (T234)
Training Support Agency NAVAIRSYSCOM (PMA205)
Manpower and Personnel Mission Sponsor CNO (N12)
NAVPERSCOM (PERS-4, PERS-404)
Director of Naval Training CNO (N7)
D. SYSTEM DESCRIPTION
1. Operational Uses. The VISUAL is an electro-optical sensor and display system that will provide the ship's company with enhanced images of aircraft in low visibility and night conditions. The VISUAL will develop and integrate emerging technologies and data networks synergistically in order to provide critical recovery information to the Landing Signal Officer (LSO) and other decision makers. The VISUAL is applicable to aircraft carriers (CV and CVN) and amphibious assault ships (LHA and LHD).
2. Foreign Military Sales. No Foreign Military Sales (FMS) or other service procurements are planned at this time.
E. DEVELOPMENTAL TEST AND OPERATIONAL TEST. The Engineering Development Model (EDM) of the VISUAL will be installed on CV, CVN, LHA, and/or LHD ships for Technical Evaluations (TECHEVAL) and Operational Evaluation (OPEVAL) to support a full-rate production decision. Limited Operational Capability (LOC) will be achieved following completion of the OPEVAL and a Milestone III decision to proceed to production, with the EDM used for OPEVAL deploying on the USS Harry S. Truman (CVN 75) and USS Bataan (LHD 5) with interim support provided.
F. AIRCRAFT AND/OR EQUIPMENT/SYSTEM/SUBSYSTEM REPLACED. The VISUAL may replace some of the components currently found in the Integrated Launch And Recovery Television Surveillance (ILARTS) system and the LSO Base Console and Head-Up Display (HUD) Unit on CV and CVN ships. This is a new system for LHA and LHD ships.
G. DESCRIPTION OF NEW DEVELOPMENT
1. Functional Description. The goal of VISUAL is to improve the safety and efficiency of operations by enhancing the LSO's capability to effectively control the aircraft during the recovery process. The VISUAL effort will affect both CV/CVN and LHA/LHD ships. The elements are described in the following paragraphs:
a. Stabilized Imaging and Tracking Unit. The Stabilized Imaging and Tracking Unit (SITU) will be a day-night, infrared TV, and laser ranging-tracking system that will image and track aircraft during approach and landing. The SITU will provide the LSO early aircraft identification and accurate position and trend information relative to glidepath, as well as imagery, to assess aircraft attitude and response to controls, aircraft damage and condition, and gear and hook status throughout the landing process. The SITU will enhance operations in reduced visibility both day and night. All ships will have SITU installed.
b. LSO Workstation. The LSO workstation will provide the LSO with dynamic aircraft and ship information necessary to aid in expediting the safe and efficient recovery of aircraft. The LHA and LHD ships currently do not have the benefit of a workstation specifically designed for this purpose. The CV and CVN LSO workstation will replace the existing unmaintainable LSO HUD console with an integrated display and control station. It will provide the LSO with a consolidated display of important aircraft recovery data and flight deck status during recovery operations.
c. Fixed Glidepath Sensor. LHA and LHD ships will utilize a fixed camera located on the aft end of the island that will provide an easily interpretable view of the aircraft during recoveries and provide the LSO with a reference for aircraft glideslope and line-up position.
2. Physical Description. VISUAL is currently in the Program Definition and Risk Reduction phase of the acquisition cycle. The acquisition strategy requires heavy reliance on Non-Developmental Items (NDI), Commercial Off-The-Shelf (COTS), and Government Off-The-Shelf (GOTS) hardware, software, and firmware, all repackaged for the shipboard operating environment. Therefore, a physical description is not currently available, but will be incorporated in later iterations of this document.
3. New Development Introduction. The VISUAL is a three-phase acquisition program.
Phase I Program Definition and Risk Reduction
Phase II Engineering and Manufacturing Development
Phase III Full Rate Production
Quantities are shown in the following table: * designates the training unit
PHASE |
TITLE |
CV OR CVN |
LHA OR LHD |
LAND BASED |
Phase I |
Advanced Development Models |
1 |
1 |
0 |
Phase II |
Engineering Development Models |
2 |
2 |
0 |
Phase III |
Full Rate Production |
13 |
13 |
*1 |
The Navy will procure the total system at Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey (NAWCADLKE), which will act as the system development agent.
4. Significant Interfaces. The CV and CVN VISUAL will interface with ADMACS, Integrated Shipboard Information System. The LHA and LHD VISUAL will interface with various shipboard systems.
5. New Features, Configurations, or Material. The VISUAL will develop and integrate emerging technologies and data networks synergistically in order to provide critical recovery information to the LSO.
H. CONCEPTS
1. Operational Concept. The VISUAL will provide a means of tracking and identifying approaching aircraft independent of the current shipboard radar. The VISUAL is designated as a non-continuously operating system that will be capable of distributing and processing information in support of air operations. The LSO is the primary operator.
2. Maintenance Concept. The maintenance concept for the VISUAL system components contained in this Initial NTSP follows the general direction and guidance outlined in the Aircraft Launch and Recovery Equipment Maintenance Program (ALREMP). Maintenance of the VISUAL components will be accomplished through the use of an organizational to depot level concept. Its intent is to minimize the requirements for organizational corrective maintenance. The organizational level will be responsible for preventive maintenance and corrective maintenance down to the failed unit, assembly, subassembly, or module. The depot level will be responsible for scheduled overhauls, repairs, and refurbishment of selected major system units, assemblies, subassemblies, and modules.
The VISUAL system will be designed with Built-In Test (BIT) functions to facilitate rapid fault isolation and verification. All equipment will provide easy access to internal parts to facilitate testing, and module and component replacement. A remove, replace, and repair concept will be applied to the VISUAL components. When an equipment failure or performance degradation is detected on CV and CVN ships, an Interior Communications Electrician (IC) with Navy Enlisted Classification (NEC) code 4745 will troubleshoot and fault isolate the system to the unit, assembly, subassembly, or module level. On LHA and LHD ships, it will be the IC with NEC 4779. The VISUAL components will be of modular design, thus permitting a broad level of repair classification. Designated consumable units and modules will be discarded after failure. Faulty units, assemblies, subassemblies, and modules designated as depot level repairable will be forwarded to the cognizant designated overhaul point.
a. Organizational. The maintenance concept for all the VISUAL systems contained in this Initial NTSP will follow the general direction and guidance outlined in the OPNAVINST 4790.4C, Naval Ships' Maintenance Material Management (3M) manual.
(1) Preventive Maintenance. Preventive maintenance will be conducted at specified intervals in accordance with procedures established by Maintenance Requirements Cards and system certification.
(2) Corrective Maintenance. Corrective maintenance will consist of BIT fault isolation and removal and replacement of failed modules and components, and system function testing.
(a) Stabilized Imaging and Tracking System. The maintenance concept for the SITU has not been determined at this time. It is anticipated that for CV and CVN VISUAL, ICs with NEC 4743 ILARTS maintenance technicians will maintain the SITU. For the LHA and LHD VISUAL, ICs with NEC 4779 will maintain the SITU.
(b) LSO Workstation. The maintenance concept for the LSO workstation has not been determined. Currently, the ICs with NEC 4745 maintain the existing LSO workstations for CV and CVN ships and NEC 4779 on LHA and LHD ships. This is not expected to change.
(c) Fixed Glidepath Sensor. The Fixed Glidepath Sensor is a fixed camera used on LHA and LHD VISUAL and it is anticipated the ICs with an NEC 4779 will maintain this sensor. The maintenance concept has not been defined at this time but will be incorporated in later iterations of this document.
b. Intermediate. Current planning indicates that there will be no intermediate level maintenance required for the VISUAL system.
c. Depot. The original equipment manufacturer or an authorized repair station will perform depot level maintenance. Depot level maintenance will consist of repair, rework, and overhaul of the replaceable assemblies that are beyond the repair capability of the organizational level.
d. Interim Maintenance. If necessary, interim depot maintenance will be provided by NAWCADLKE.
e. Life-Cycle Maintenance Plan. VISUAL will be installed during overhaul periods with configuration request and upgrades documented through the current ship's Maintenance Plan.
3. Manning Concept. Organizational level manpower requirements will not change due to the installation of VISUAL components. Manpower requirements were determined through workload comparability analysis per TRPPM procedures and information from Subject Matter Experts.
a. Estimated Maintenance Man-Hours per Operating Hour. The VISUAL and its related components are designated non-continuously operating systems and will be capable of distributing and processing information in support of air operations 24 hours per day throughout a six-month deployment. The technical parameter threshold values derived from the ORD for system reliability, availability, and repair time are as follows:
PARAMETER |
DEFINITION |
THRESHOLD |
OBJECTIVE |
System Reliability |
Mean Time Between Operational Mission Failures |
703 hours |
1813 hours |
System Availability |
Uptime / (Uptime + Downtime) (percent of uptime usage) |
95% |
98% |
Operational Mission System Maintainability |
Maximum Corrective Mean Time for Operational Mission Failures |
1.5 hours |
1.0 hours |
Assuming the VISUAL threshold and objective goals (above) are attained, the system will not generate enough maintenance actions to require any additional maintenance personnel. Further, since VISUAL does not generate any additional watch stations or operator positions, no additional operators will be necessary.
b. Proposed Utilization. The proposed utilization is 5040 hours annually (210 days times 24 hours).
c. Recommended Qualitative and Quantitative Manpower Requirements
(1) Operator. On CV and CVN ships the LSO workstation is manned by an LSO with a Navy Officer Billet Classification (NOBC) of 8662 and an IC with NEC 4745. On CV and CVN ships the ILARTS console is manned by an IC with NEC 4743. On LHA and LHD ships the VISUAL will be manned by an IC with NEC 4779. When Marines are embarked, the LSO duties are performed by Military Occupational Specialty (MOS) 7593/7594 on aircraft carriers and MOS 7589 for amphibious assault ships.
(2) Maintainer. Personnel in the IC rating will perform maintenance functions on CV and CVN VISUAL systems. NEC 4745 personnel are responsible for the Fresnel Lens Optical Landing Systems, the manually operated Visual Landing Aid (VLA) System, and the LSO HUD system, and will be trained to maintain the replaced components. ICs with NEC 4743 currently maintain the ILARTS and will be trained to perform maintenance tasks for replaced components. Vertical/Short Take-Off and Landing Optical Lens System Technicians with NEC 4779 will maintain the VISUAL system on LHA and LHD ships.
4. Training Concept. A systems approach will be applied in the development and preparation of a training program that will provide designated operation and maintenance personnel with the necessary knowledge and skills to support the VISUAL. Course C-670-2010 (NEC 4745) currently includes curriculum designed to train students to operate, maintain, fault isolate, and repair Optical Landing Systems (on CV and CVN ships) including the LSO HUD. Course A-670-0064 trains students to perform designated scheduled maintenance, organizational level corrective maintenance, troubleshoot system malfunctions, and replace faulty units on LHA and LHD ships. It is estimated that the portion of curriculum in these courses that is based on the LSO HUD will be replaced with curriculum based on the VISUAL. Course A-191-0011 provides ICs with the knowledge and skills to perform organizational level preventive and corrective maintenance, and operate the ILARTS. This course may need revision to include new VISUAL components. The LSO courses will also require incorporation of the VISUAL information. These courses are D-2G-0001, D-2G-0002, and D-2G-0003. The Naval Air Training and Operating Procedures Standardization (NATOPS) manual (NAVAIR 00-80T-104 and NAVAIR 00-80T-111) delineates the training, designation, and requirements for the LSO. The Officer In Charge of the Navy LSO School acts as the training and NATOPS model manager. The model manager is responsible for updating educational materials for all LSO training. These courses are normally conducted at the using unit level but must be updated to reflect the VISUAL changes.
a. Initial Training. Initial training will be required for TECHEVAL and OPEVAL personnel so they can successfully perform testing functions. Navy IC instructors will also require initial training so that they can establish organic follow-on training.
b. Follow-on Training. Follow-on training for shipboard operators will be integrated into the existing training courses listed below for the LSO billet. It is estimated that the addition of VISUAL training data into these courses will not increase course length.
(1) Operator
Title |
Initial Formal Ground Training |
CIN |
D-2G-0001 |
Model Manager |
Navy LSO School |
Description |
This course provides an introduction to fleet LSO administrative and operational responsibilities including shore-based and shipboard equipment, glideslope geometry, aircraft recovery bulletins, aircraft characteristics, waving concepts and techniques, conduct of field carrier landing practice, and Fleet Automated Performance Assessment and Readiness Training Systems. |
Location |
Navy LSO School, NAS Oceana, Virginia |
Length |
10 days |
RFT date |
Currently available. Will require revision. |
Skill identifier |
None |
TTE/TD |
To Be Determined (TBD) |
Prerequisites |
|
Title |
Advanced Formal Ground Training |
CIN |
D-2G-0002 |
Model Manager |
Navy LSO School |
Description |
This course provides instruction in administrative and operational responsibilities of an airwing staff LSO including platform strategy, barricade, pitching deck recoveries, LSO training and evaluation, and Fleet Automated Performance Assessment and Readiness Training System. |
Location |
Navy LSO School, NAS Oceana |
Length |
3 days |
RFT date |
Currently available. Will require revision. |
Skill identifier |
None |
TTE/TD |
TBD |
Prerequisites |
|
Title |
Fleet Replacement Squadron Training Command |
CIN |
D-2G-0003 |
Model Manager |
Navy LSO School |
Description |
This course provides instruction in administrative and operational responsibilities of a training LSO including waving techniques and considerations, conduct of ground training and field carrier landing practice, initial carrier qualification requirements, and Fleet Replacement Squadron Automated Performance Assessment and Readiness Training System. |
Location |
Navy LSO School, NAS Oceana |
Length |
3 days |
RFT date |
Currently available. Will require revision. |
Skill identifier |
None |
TTE/TD |
TBD |
Prerequisites |
|
(2) Maintenance
Title |
Integrated Launch and Recovery Television Surveillance System Maintenance |
|
CIN |
A-191-0011 |
|
Model Manager |
Service School Command |
|
Description |
This course provides ICs with the knowledge and skills necessary to perform preventive and organizational level corrective maintenance, and operate the ILARTS System. The course also provides the ability to perform all authorized system operating and maintenance procedures under limited supervision onboard aircraft carriers. |
|
Location |
Service School Command, Great Lakes, Illinois |
|
Length |
124 days |
|
RFT date |
Currently available. Will require revision. |
|
Skill identifier |
IC 4743 |
|
TTE/TD |
TBD |
|
Prerequisites |
A-623-0105, IC Class "A" School |
Title |
Optical Landing Systems Maintenance |
|
CIN |
C-670-2010 |
|
Model Manager |
Naval Air Technical Training Center (NATTC) Detachment Lakehurst |
|
Description |
This course provides training to ICs to operate, maintain, fault isolate, and repair the Fresnel Lens Optical Landing System, the manually operated VLA System, and the HUD aboard aircraft carriers. |
|
Location |
NATTC Detachment Lakehurst, New Jersey |
|
Length |
72 days |
|
RFT date |
Currently available. Will require revision. |
|
Skill identifier |
IC 4745 |
|
TTE/TD |
TBD |
|
Prerequisites |
A-623-0105, IC Class "A" School |
Title |
Vertical/Short Take-Off and Landing Optical Landing System Maintenance |
CIN |
A-670-0064 |
Model Manager |
Service School Command |
Description |
This course provides ICs with the knowledge and skills required to operate and perform preventive and corrective maintenance for the system in all modes. |
Location |
Service School Command, Great Lakes |
Length |
12 days |
RFT date |
Currently available. Will require revision. |
Skill identifier |
IC 4779 |
TTE/TD |
TBD |
Prerequisites |
IC, E-5 through E-7 |
Title |
Aircraft Launch and Recovery Equipment Maintenance |
|
CIN |
C-2G-2011 |
|
Model Manager |
NATTC Detachment Lakehurst |
|
Description |
The course prepares selected CWO and LDOs ordered to ALREMP organizational level billets and selected Aviation Boatswain's Mate (Equipment) (ABE) with the training to manage and supervise the administration and quality assurance of aircraft launch and recovery equipment maintenance ashore and afloat. |
|
Location |
NATTC Detachment Lakehurst |
|
Length |
38 days |
|
RFT date |
Currently available. Will require revision. |
|
Skill identifier |
None |
|
TTE/TD |
TBD |
|
Prerequisites |
Officers selected by the CNO, or ABEs E-7 through E-9 |
c. Student Profiles
SKILL IDENTIFIER |
PREREQUISITE SKILL AND KNOWLEDGE REQUIREMENTS |
|
NOBC 8662 |
Qualified fixed-wing pilot |
|
ABE |
Paygrade E-7 through E-9 |
|
IC 4743, 4745, and 4779 |
A-623-0105, IC Class "A" School |
d. Training Pipelines. No new training pipelines or tracks have been identified at this early stage in the acquisition process, but the following courses have been identified to require revisions:
CIN |
COURSE TITLE |
D-2G-0001 |
Initial Formal Ground Training |
D-2G-0002 |
Advanced Formal Ground Training |
D-2G-0003 |
Fleet Replacement Squadron Training Command |
A-191-0011 |
Integrated Launch and Recovery Television Surveillance System Maintenance |
C-670-2010 |
Optical Landing Systems Maintenance |
A-670-0064 |
Vertical/Short Take-Off and Landing Optical Landing System Maintenance |
C-2G-2011 |
Aircraft Launch and Recovery Equipment Maintenance |
I. ONBOARD (IN-SERVICE) TRAINING
1. Proficiency or Other Training Organic to the New Development. TBD
a. Maintenance Training Improvement Program. TBD
b. Aviation Maintenance In-Service Training. TBD
c. Aviation Maintenance Training Continuum System. TBD
2. Personnel Qualification Standards. Personnel Qualification Standards (PQS) will be developed by the PQS development center as required.
3. Other Onboard or In-Service Training Packages. The curriculum package for both operator and maintenance personnel must be delivered to the user activity and schoolhouses 90 days prior to Initial Operational Capability (IOC).
J. LOGISTICS SUPPORT
1. Manufacturer and Contract Numbers. TBD
2. Program Documentation
- Acquisition Strategy for VISUAL, approved 24 June 1997
- ORD number 459-88-97 for ADMACS
- Executive Summary for VISUAL, Increment III of ADMACS, dated April 1998
3. Technical Data Plan. Preliminary operator and maintainer manuals will be required, as well as final operation and maintenance manuals with illustrated parts breakdown that will be prepared by NAWCADLKE. Manuals will be developed in accordance with a Technical Manual Contract Requirement generated by the Naval Air Technical Data and Engineering Service Command. The formal technical manuals will be ready for printing and distribution approximately 90 days after receipt of verification of comments. Commercial manuals will be used where applicable.
4. Test Sets, Tools, and Test Equipment. TBD
5. Repair Parts. TBD
6. Human Systems Integration. The Human Systems Integration (HSI) program will be organized to achieve the effective integration of personnel into the design of the system. The human engineering effort will include, but not necessarily be limited to, active participation in the following three major interrelated areas of system development: analysis, design and development, and test and evaluation. The use of NDI, COTS, and GOTS hardware, software and firmware, common to other systems on the ship, should not require new personnel specialties but rather an extension of these skill levels. Further, the use of highly reliable, integrated, common support systems should result in the more efficient use of operating and support personnel.
K. SCHEDULES
1. Limited Operational Capability. LOC will be achieved following completion of the OPEVAL and a Milestone III decision to proceed to production, with the EDM used for OPEVAL deploying on CVN 75 and LHD 5, with interim support provided.
2. Initial Operational Capability. IOC will be achieved approximately two years after Milestone III.
3. Full Operational Capability. Full Operational Capability will be achieved approximately five years after Milestone III when all production units are installed.
4. Installation and Delivery Schedules. The total system will be procured by the Navy at NAWCADLKE. NAWCADLKE will act as the system development agent.
PROCUREMENT/DELIVERY SCHEDULE (CV/CVN: LHA/LHD: LAND BASED)
PHASE |
FY97 |
FY98 |
FY99 |
FY00 |
FY01 |
FY02 |
FY03 |
OUT YEARS |
||||
Phase I Procurement Installation |
0: 0: 0 |
1: 1: 0 |
||||||||||
Phase II Procurement Installation |
0: 0: 0 |
2: 0: 0 |
0: 2: 0 1: 0: 0 |
0: 1: 0 |
||||||||
Phase III Procurement Installation |
3: 0: 0 |
10: 13: 1 13: 13: 1 |
5. Ready For Operational Use Schedule. VISUAL should be ready for operational use approximately one year after the Milestone III decision.
6. Foreign Military Sales and Other Source Delivery Schedule. There is no FMS program scheduled at this time.
7. Training Device and Technical Training Equipment Delivery Schedule. TBD
L. GOVERNMENT-FURNISHED EQUIPMENT AND CONTRACTOR-FURNISHED EQUIPMENT TRAINING REQUIREMENTS. NA
M. RELATED NTSPs AND OTHER APPLICABLE DOCUMENTS. The following are documents that affect, are related to, or were used to develop this Initial NTSP:
DOCUMENT OR NTSP TITLE |
DOCUMENT OR NTSP NUMBER |
PDA CODE |
STATUS |
Aircraft Carrier VLA Systems NTSP |
A-50-9202P9202A/A |
PMA251 |
Proposed Sep 98Approved Nov 99 |
Amphibious Assault Ship VLA Systems NTSP |
A-50-9203/A/D |
PMA251 |
Approved Dec 93Draft Sep 99 |
Air Capable Ships VLA Systems NTSP |
A-50-9205/A/D |
PMA251 |
Approved Dec 93Draft Sep 99 |
ADMACS Initial NTSP |
Z-50-0034 |
PMA251 |
Initial June 1999 |
Acquisition Strategy for VISUAL |
NA |
PMA251 |
Approved Jun 97 |
CAPT Frank Coleman
COMM: (703) 697-9359Aircraft Carrier Program Sponsor DSN: 227-9359
CNO, N885D FAX: (703) 695-7103
coleman.frank@hq.navy.mil
AZC Scott Dean COMM: (703) 604-7714
NTSP Manager DSN: 664-7714
CNO, N889H7 FAX: (703) 604-6939
dean.scott@hq.navy.mil
CAPT Robert Gibson COMM: (901) 874-3529
Deputy Assistant, Chief of Naval Personnel for Distribution DSN: 882-3529
NAVPERSCOM, PERS-4B FAX: (901) 874-2606
4b@persnet.navy.mil
CDR Timothy Ferree COMM: (901) 874-3691
Branch Head, Aviation Enlisted Assignments DSN: 882-3691
NAVPERSCOM, PERS-404 FAX: (901) 874-2642
p404@persnet.navy.mil
Mr. Robert Zweibel COMM: (703) 614-1344
Training Technology Policies DSN: 224-1344
CNO, N75K FAX: (703) 695-5698
zweibel.robert@hq.navy.mil
GSCM Thomas Lunney COMM: (850) 452-8948
Surface Technical Training DSN: 922-8948
CNET, T2341 FAX: (850) 452 4452
gscm-thomas.lunney@smtp.cnet.navy.mil
CDR E. Hawkins COMM: (757) 836-0101
Aviation NTSP Manager DSN: 836-0101
CINCLANTFLT, N-721 FAX: (757) 836-0141
hawkinsel@clf.navy.mil
Mr. Bob Long COMM: (808) 471-8513
Deputy Director for Training DSN: 315-471-8513
CINCPACFLT, N-70 FAX: (808) 471-8596
u70@cpf.navy.mil
CDR B. Mack COMM: (703) 604-3247
Aviation Manpower DSN: 664-3247
CNO, N122C1 FAX: (703) 614-5308
n122c1@bupers.navy.mil
CAPT L. Knolhoff COMM: (301) 757-6825
Developing Agency DSN: 757-6825
NAVAIRSYSCOM, PMA251 FAX: (301) 757-6800
knolhoffle@navair.navy.mil
Ms. Franceen George COMM: (301) 757-6822
Program Team Leader DSN: 757-6822
NAVAIRSYSCOM, PMA251E FAX: (301) 757-6800
georgefp@navair.navy.mil
Mr. Victor Brown COMM: (301) 757-6814
Logistics Manager DSN: 757-6814
NAVAIRSYSCOM, AIR 3.1.4C FAX: (301) 757-6800
brownvl.ntrprs@navair.navy.mil
ACCM Howard McGrath COMM: (301) 757-8126
Training System Manager DSN: 757-8126
NAVAIRSYSCOM, PMA205-3B1 FAX: (301) 757-6945
mcgrathhj@navair.navy.mil
Mr. John Zirkel COMM: (732) 323-4044
NAWC Team Leader DSN: 624-4044
NAWCADLKE, 1.1.X.6.1.2.B FAX: (732) 323-4029
zirkeljn@navair.navy.mil
Mr. Michael Jones COMM: (732) 323-2497
Systems Engineer DSN: 624-2497
NAWCADLKE, 4.8.1.3 FAX: (732) 323-1282
jonesmr@navair.navy.mil
Ms. Nancy McQuillan COMM: (732) 323-7804
Logistics Manager DSN: 624-7804
NAWCADLKE, 3.1.4.1 FAX: (732) 323-2983
mcquilna@navair.navy.mil
Ms. Teri Kostbar COMM: (732) 323-1841
Training Requirements DSN: 624-1841
NAWCADLKE, 3.4.1 FAX: (732) 323-4064
kostbart@navair.navy.mil
Mr. Art Hyde COMM: (732) 323-2992
Technical Data, MRC DSN: 624-2992
NAWCADLKE, 3.3.1 FAX: (732) 323-2983
hydeaa@navair.navy.mil
Mr. Phil Szczyglowski COMM: (301) 757-9182
Competency Manager DSN: 757-9182
NAVAIRSYSCOM, AIR 3.4.1.1 FAX: (301) 342-4723
szczyglowspr@navair.navy.mil
AFCM Marlon Breboneria COMM: (301) 757-9184
Front End Analysis Manager DSN: 757-9184
NAVAIRSYSCOM, AIR 3.4.1.1 FAX: (301) 342-4723
breboneriamn@navair.navy.mil
Mr. Gary Barnes COMM: (301) 757-9199
Training Specialist (NTSP Author) DSN: 757-9199