658 HOTEL I/II/III
Specifications | ||
---|---|---|
Soviet Designation | 658 | 658M |
US-Designation | Hotel I | Hotel II |
Development began | August 1956 | March 1958 |
Design Bureau | OKB 18 | |
Chief designer | C.H. Kovalev | |
Builders | Nr. 402 Severodvinsk | |
Construction and Outfit | October 1958 - December 1962 | 1963-1967 |
Service time | January 1961-1967 | 1964-1991 |
Number of constructed ships | 8 | 7 (converted 658 submarines) |
Armament | D-2 launch system with 3 R-13 missiles |
D-4 launch system with 3 R-21 missiles |
4-533mm torpedo tubes, 4- 400mm torpedo tubes |
||
Power Plant | 2 pressurized water reactors, 190 MW each 2 steam turbines, 17.500 hp each |
|
Length | 114 meters / 370 feet | |
Beam | 9.2 meters | |
Deposit | 7.31 meters | |
Displacement | 4080 m3 Surfaced 5000 m3 Submerged |
|
Operating depth | 240 meters (design) 300 meters (maximum) |
|
Speed | 18 knots - Surface 26 knots - Submerged |
|
Crew | 104 men | |
Endurance | 50 days |
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|