Find a Security Clearance Job!

Military


Project 627 Kit
November class

Specifications
Project 627, 627 A
Kit
November
Project 645-ZhMT
November
Designer: V.N. Peregrudov, SKB-143 V.N. Peregrudov, SKB-143
Builder: Severodvinsk Severodvinsk
Displacement 3,065-3,101 tons surfaced
3,986-4,750 tons submerged
3,420 tons surfaced
3,986-4,380 tons submerged
Speed (kts): 15.2 knots (surfaced)
28-30.5 knots submerged
30 knots submerged
Operating Depth: 790 feet, maximum Safe Depth
980 feet never-exceed depth
1,250 feet ,crush depth
300 meters
Propulsion: 2 70 MWt VM-A pressurised water reactors
2 turbines @ 17.500 shp
2 146 Mwt VT-1 type liquid metal (lead-bismuth) reactors
2 turbines @ 35 000 shp.
Dimensions 107.4 meters long
7.9-8.0 meters beam
5.65-6.4 meters draft
109.8 meters long
8.3 meters beam
5.85 meters draft
Crew 104 (30 officers) or 110 (24 Officers, 86 Enlisted) 105
Endurance 1,172 full power hours
60 days,stores Endurance
torpedoes 8 x 21" (533mm)
w/20 53-65K or SET-65
Systems
  • RLK-101 Nakat Surface Search Radars
  • Pluton 627 Navigation
  • Prizma Fire Control (627)
  • Leningrad Fire Control (627A)
  • Khrom-KM IFF
  • Bizan ESM
  • MG-23 Svet Underwater Communications (627)
  • MG-29 Khost Underwater Communications (627A)
  • MG-200 Arktika-M, active search Sonar
  • MG-10 Feniks-M passive search Sonar
  • MG-13M intercept receiver Sonar
  • Luch mine detection Sonar


  • NEWSLETTER
    Join the GlobalSecurity.org mailing list