Project 627 Kit
November class
Specifications | ||
---|---|---|
Project 627, 627 A Kit November |
Project 645-ZhMT November |
|
Designer: | V.N. Peregrudov, SKB-143 | V.N. Peregrudov, SKB-143 |
Builder: | Severodvinsk | Severodvinsk |
Displacement | 3,065-3,101 tons surfaced 3,986-4,750 tons submerged |
3,420 tons surfaced 3,986-4,380 tons submerged |
Speed (kts): | 15.2 knots (surfaced) 28-30.5 knots submerged |
30 knots submerged |
Operating Depth: | 790 feet, maximum Safe Depth 980 feet never-exceed depth 1,250 feet ,crush depth |
300 meters |
Propulsion: | 2 70 MWt VM-A pressurised water reactors 2 turbines @ 17.500 shp |
2 146 Mwt VT-1 type liquid metal (lead-bismuth) reactors 2 turbines @ 35 000 shp. |
Dimensions | 107.4 meters long 7.9-8.0 meters beam 5.65-6.4 meters draft |
109.8 meters long 8.3 meters beam 5.85 meters draft |
Crew | 104 (30 officers) or 110 (24 Officers, 86 Enlisted) | 105 |
Endurance | 1,172 full power hours 60 days,stores Endurance |
|
torpedoes | 8 x 21" (533mm) w/20 53-65K or SET-65 |
|
Systems |
|
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|