UNITED24 - Make a charitable donation in support of Ukraine!

Military


Future Surface Combatant (FSC)

Principal Particulars F5 Future Fast Flexible FrigateMultirole Monohull Warship (MMW)
Proposed 2007 2000
Length overall 181.5m156.9 meters
Maximum beam 32.1m19.6 meters
Draft 6.3m 5.49 meters
Depth of Hull 12.3 meters
Displacement 6339 tonnes
Displacement (Deep) 7290 Tonnes
Displacement (Standard) 6340 Tonnes
Propulsion and Capacity 1 x MT30 GT direct drive
2 x MT30 GTA (36MW)
2 x 32MW HTS motors
2 x 3MW auxiliary DGs
3 x 30MW water jets
Fuel1000 tonnes
Service Speed 35kt
Maximum Speed 45kt30 knots @ 47.5MW
Range 5500nm @ 35kt with one stop7000 Nm @ 18knots
Mission Duration 60 days
Maximum Activity Load 3.9MW
Normal Cruising Load 2.8MW
Payload . 64 VLS Silo in 2 modules
. Fixed face multifunction phased array radar
. EM main Gun and sided MC Guns
. 2 x ILDS
. 2 x SCG
. Active Towed Array Sonar or SF delivery vehicle
. Retractable hull-mounted sonar
. CESM
. CEC
. 2 x Organic helicopter
. Chinook-capable flightdeck
Crew: 105 170 + margin
Up to 230
Cost 241.93M






NEWSLETTER
Join the GlobalSecurity.org mailing list



 
Page last modified: 11-07-2011 02:58:49 ZULU