Flag | Brazil
|
Ship type | Military submarine rescue ship
|
Shipyard | Smedvik Mekaniske Verksted
|
building-costs | 62,900,000 Norwegian crowns
|
Commissioning |
1977 Ordered in September.
1979 Built as WILDRAKE at Smedvik Mekaniske Verksted, Tjørvåg for K / S Wilhelmsen Marine Services A / S (Wilhelmsen Marine Services A / S), Oslo. Completed 04/07. Building costs NOK 62,900,000.
1986 Sold for NOK 67,000,000 to K / S Holger Dane (Henning H. Faddersbøll), Copenhagen, Denmark. Renamed HOLGER DANE.
1988 Sold by forced sale to A / S Sentinel Offshore, Oslo when danish owner could not pay.
1989 Sold to Marinha do Brasil, Rio de Janeiro, Brazil. Renamed FELINTO PERRY. Converted to submarine rescue ship.
|
Length | 77.8 meters
|
Beam | 17.5 meters
|
Draft | 5.2 meters
|
Displacement | 4,107 tons
|
Gross tonnage | 1769 tons
|
Deadweight | 1350 tons
|
machine | Diesel-electric
|
propeller | 2
|
Maximum speed | 14 knots
|
Propulsion |
2 electric motors, 7,000SHK / 5,152kW, reduced from 1,190 to 263 rpm on separate propellers.
2 x side propellers forward.
2 x side propellers aft.
|
Speed ??/ Cons. | 14.6 knots at a consumption of 20.0 t / day. Bunker capacity 915 h.
|
Auxiliary machinery (aux) |
2 x Bergen Diesel diesel generator, each 4-stroke / single-speed, 16-cylinder, cylinder. dim .: 250 x 300mm. 2,399BHK / 2,280kW.
2 x Bergen Diesel diesel generator, each 4-stroke / single-speed, 12-cylinder, cylinder. dim .: 250 x 300mm. 1,796BHK / 1,712kW.
2 x diesel gene. each 335BHK / 300kW.
|
Total (el.power) | 8.588kW / 440-220VAC / 60Hz.
|
Autonomy | 77 days
|
Crew | 127.
|