1. What laying procedure is used to minimize the risks to the Flipper operator?

A. Roll and dispense
B. Stop and roll
C. Stop and dispense
Use stop-and-dispense. . .
D. Fire and roll
2. How many M75 AT mines does a disrupt Flipper minefield require?

A. 35
B. 70
Disrupt and fix minefields. . .
C. 170
D. 280
3. When emplacing a turn effect Volcano minefield, how many minutes must the vehicle operator wait before starting the second strip?

A. 4
The vehicle moves out. . .
B. 8
C. 10
D. 30
4. Volcano minefield marking must include the safety zone, which is __ meters from the start and end points and __ meters to the left or right of the centerline.

A. 50, 100
B. 40, 80
Minefield marking must include. . .
C. 30, 70
D. 20, 60
5. The MOPMS RCU can recycle the 4-hour SD time of the mines __ times, for a total duration of approximately __ hours.

A. 4, 16
B. 3, 12
C. 4, 15
D. 3, 13
The RCU can recycle. . .
6. The safety zone is __ meters to the front and sides of the MOPMS container and __ meters behind the container.

A. 55, 20
The safety zone around. . .
B. 65, 30
C. 45, 15
D. 60, 20