Table 5-1. Permit and approval status of existing and planned SRS waste management facilities.
|
|
| |||||||||||||||||
| E-Area Vaults | No actionj
Other NEPAk |
| ||||||||||||||||
| Low-Level Radioactive Waste Disposal Facility | No action Other NEPA |
| ||||||||||||||||
| Compactors | No action | |||||||||||||||||
| Consolidated Incineration Facility - Construction | No action
Other NEPA |
| ||||||||||||||||
| Consolidated Incineration Facility - Operation | Proposed action | |||||||||||||||||
| HW/MW Disposal Vaults | No action
Other NEPA |
| ||||||||||||||||
| Mixed Waste Storage Buildings and Pads 2022 | No action Other NEPA |
| ||||||||||||||||
| Hazardous Waste Storage Facility | No action | |||||||||||||||||
| M-Area Vendor Treatment Facility | No action
Other NEPA | OPS | ||||||||||||||||
| M-Area Liquid Effluent Treatment Facility | No action | |||||||||||||||||
| Process Waste Interim Treatment/Storage Facility | No action | |||||||||||||||||
| Burial Ground Solvent Tanks | No action | |||||||||||||||||
| SRTC Mixed Waste Storage Tanks | No action | |||||||||||||||||
| Transuranic Waste
Storage Pads | No action Other NEPA |
| ||||||||||||||||
| Experimental Transuranic Waste Assay Facility | No action | |||||||||||||||||
| F- and H-Area Tank Farms | No action
Other NEPA |
| ||||||||||||||||
| Replacement HLW Evaporator | No action Other NEPA |
| ||||||||||||||||
Table 5-1. (continued).
|
|
| |||||||||||||
| F/H-Area Effluent Treatment Facility | No action
Other NEPA |
| ||||||||||||
| Defense Waste Processing Facility | No action
Other NEPA |
| ||||||||||||
| Organic Waste Storage Tank | No action
Other NEPA |
| ||||||||||||
| a. | NEPA = National Environmental Policy Act. | S = subject to requirements. | ||
| b. | AEA = Atomic Energy Act. | NA = requirements not applicable. | ||
| c. | CERCLA = Comprehensive Environmental Response,
Compensation, and Liability Act. | ON = ongoing consultation/reporting requirements. P = permitted or approved. | ||
| d. | EPCRA = Emergency Planning and Community Right-to-Know Act. | Unk = requirements unknown. CP = construction permit. | ||
| e. | RCRA = Resource Conservation and Recovery Act. | PS = permit application submitted. | ||
| f. | CWA = Clean Water Act. | I = operating under an interim permit. | ||
| g. | SDWA = Safe Drinking Water Act. | OPS = operating permit has been submitted. | ||
| h. | CAA = Clean Air Act. | PR = permit will be required. | ||
| i. | The Executive Order on environmental justice was issued in 1994. NEPA documents prepared for facilities built before 1994 do not address environmental justice. | OP = operating permit.
HW/MW = hazardous waste/mixed waste. TRU = transuranic waste. | ||
| j. | Included in the no-action alternative of this EIS. | HLW = high-level waste. | ||
| k. | Subject of a previous NEPA review (i.e., EIS, environmental assessment, or categorical exclusion). | SRTC = Savannah River Technology Center. | ||
| « = considered in previous NEPA review. | ||||
| Ö = considered in this EIS. | ||||
| - = previous NEPA documentation did not require an analysis of environmental justice. |
|
NEWSLETTER
|
| Join the GlobalSecurity.org mailing list |
|
|
|