Table 4-64. Number of vehicles per hour during peak hours under alternative B.


Design capacity,
vehicles per
No-action alternative
(percentage of


Waste forecast
Road
hour
capacity)a
Minimum
Expected
Maximum
Offsite
Percentage of design capacity
SC 193,000b 2,821 (94) 2,852 (95)2,875 (96) 2,948 (98)
SC 1253,200b 2,720 (85) 2,750 (86)2,772 (87) 2,842 (89)
SC 572,100b 706 (34) 713 (34)719 (34) 737 (35)
Onsite
Road E at
E-Area

2,300c

788d (34)

856e (37)

907e (39)

1,068e (46)

a. Number in parentheses represents percentage of design capacity.

b. Adapted from Smith (1989).

c. Adapted from TRB (1985).

d. Includes baseline plus the maximum number (47) of construction workers (Hess 1995a).

e. Includes baseline plus the maximum number (115 for the minimum, 166 for the expected, and 327 for the maximum waste forecast) of construction workers (Hess 1995a).