Table S-3. Treatment, storage, and disposal requirements for and cost of each alternative and waste forecast.


Additional treatment, storage, and disposal facilities for each alternativea
Alternative
Waste forecast
Minimum
Expected
Maximum








No action






















STORAGE: Buildings

24 long-lived low-level waste

291 mixed waste

Pads

19 transuranic and alpha waste

Tanks

4 organic waste in S-Area

26 organic waste in E-Area

43 aqueous waste in E-Area

TREATMENT: Continue ongoing and planned waste treatment activities

DISPOSAL:

29 shallow land disposal trenches

10 low-activity waste vaults

5 intermediate-level waste vaults

1 RCRAb disposal facility

COST c: $6.9¥109d










A





























STORAGE: Buildings

7 long-lived low-level waste

45 mixed waste

Pads

3 transuranic and alpha waste

TREATMENT: Same as expected waste forecast

DISPOSAL:

25 shallow land disposal trenches

9 low-activity waste vaults

2 intermediate-level waste vaults

21 RCRA disposal facilities

COST: $4.2¥109

STORAGE: Buildings

24 long-lived low-level waste

79 mixed waste

Pads

12 transuranic and alpha waste

TREATMENT: Continue ongoing and planned waste treatment activities; treat limited quantities of mixed and PCB waste offsite; operate the Consolidated Incineration Facility for hazardous and mixed waste, modify the facility to accept mixed waste soils and sludges; construct and operate a mixed waste containment building; construct and operate a mixed waste soil sort facility; construct and operate a transuranic waste characterization/certification facility

DISPOSAL:

73 shallow land disposal trenches

12 low-activity waste vaults

5 intermediate-level waste vaults

61 RCRA disposal facilities

COST: $6.9¥109

STORAGE: Buildings

34 long-lived low-level waste

757 mixed waste

Pads

1,168 transuranic and alpha waste

TREATMENT: Same as expected waste forecast, except containment building modified to include wastewater treatment capability to treat spent decontamination solutions; treat its secondary waste at the Consolidated Incineration Facility

DISPOSAL:

644 shallow land disposal trenches

31 low-activity waste vaults

31 intermediate-level waste vaults

347 RCRA disposal facilities

COST: $24¥109

TC

Table S-3. (continued).


Additional treatment, storage, and disposal facilities for each alternative (continued)
Alternative
Waste forecast
Minimum
Expected
Maximum










B




































STORAGE: Buildings

7 long-lived low-level waste

39 mixed waste

Pads

2 transuranic and alpha waste

TREATMENT: Same as expected waste forecast, except no non­alpha vitrification facility; modify Consolidated Incineration Facility to accept mixed waste soils and sludges

DISPOSAL:

37 shallow land disposal trenches

1 low-activity waste vault

2 intermediate-level waste vaults

20 RCRA disposal facilities

COST: $4.2¥109

STORAGE: Buildings

24 long-lived low-level waste

79 mixed waste

Pads

10 transuranic and alpha waste

TREATMENT: Continue ongoing and planned waste treatment activities; treat limited quantities of mixed and PCB wastes offsite; begin volume reduction of low-activity job-control and equipment waste offsite; begin smelting low-activity equipment waste offsite; operate the Consolidated Incineration Facility for low-level, hazardous, and mixed wastes; construct and operate a low-level waste soil sort facility; construct and operate a mixed waste containment building; construct and operate a non-alpha vitrification facility for mixed waste soils and sludges; construct and operate a transuranic waste characterization/certification facility; construct and operate an alpha vitrification facility

DISPOSAL:

58 shallow land disposal trenches

1 low-activity waste vault

5 intermediate-level waste vaults

21 RCRA disposal facilities

COST: $6.9¥109

STORAGE: Buildings

34 long-lived low-level waste

652 mixed waste

Pads

1,168 transuranic and alpha waste

TREATMENT: Same as expected waste forecast, except containment building modified to include wastewater treatment capability to treat spent decontamination solutions; treat its secondary waste at the Consolidated Incineration Facility

DISPOSAL:

371 shallow land disposal trenches

8 low-activity waste vaults

9 intermediate-level waste vaults

96 RCRA disposal facilities

COST: $20¥109

Table S-3. (continued).


Additional treatment, storage, and disposal facilities for each alternative (continued)
Alternative
Waste forecast
Minimum
Expected
Maximum










C


































STORAGE: Buildings

7 long-lived low-level waste

39 mixed waste

Pads

2 transuranic and alpha waste

TREATMENT: Same as expected waste forecast

DISPOSAL:

45 shallow land disposal trenches

2 low-activity waste vaults

1 intermediate-level waste vault

10 RCRA disposal facilities

COST: $3.8¥109

STORAGE: Buildings

24 long-lived low-level waste

79 mixed waste

Pads

11 transuranic and alpha waste

TREATMENT: Continue ongoing and planned waste treatment activities; treat limited quantities of mixed and PCB wastes offsite; begin smelting low-activity equipment waste offsite; operate the Consolidated Incineration Facility for low-level, hazardous, and mixed waste until vitrification facility is available; construct and operate a hazardous and mixed waste containment building; construct and operate a non­alpha vitrification facility for low-level, hazardous, and mixed waste; construct and operate a transuranic waste characterization/certification facility; construct and operate an alpha vitrification facility

DISPOSAL:

123 shallow land disposal trenches

2 low-activity waste vaults

2 intermediate-level waste vaults

40 RCRA disposal facilities

COST: $5.6¥109

STORAGE: Buildings

34 long-lived low-level waste

652 mixed waste

Pads

1,166 transuranic and alpha waste

TREATMENT: Same as expected waste forecast

DISPOSAL:

576 shallow land disposal trenches

5 low-activity waste vaults

3 intermediate-level waste vaults

111 RCRA disposal facilities

COST: $18¥109

a. Facilities identified are in addition to those currently constructed; activities are in addition to ongoing or planned activities.

b. Resource Conservation and Recovery Act.

c. Life-cycle costs are expressed as present worth in 1994 dollars with 3 percent escalation and 6 percent discount rate (refer to Appendix C for details).