EA-683; Environmental Assessment and (FONSI) for Mound Plant Decontamination and Decommissioning Projects

Table of Contents

LIST OF ACRONYMS AND ABBREVIATIONS
1.0 INTRODUCTION 2.0 PURPOSE AND NEED FOR AGENCY ACTION 3.0 PROPOSED ACTION AND ALTERNATIVES 4.0 AFFECTED ENVIRONMENT 5.0 ENVIRONMENTAL IMPACTS 6.0 REFERENCES CITED
7.0 LIST OF AGENCIES CONSULTED
APPENDIX A RADIOLOGICAL IMPACT OF TRANSPORTATION ACCIDENT INVOLVING SPILL OF PU-238 CONTAMINATED SOIL ONTO THE ROAD APPENDIX B LETTERS OF CORRESPONDENCE WITH FEDERAL, STATE AND LOCAL AGENCIES
FINDING OF NO SIGNIFICANT IMPACT DECONTAMINATION AND DECOMMISSIONING PROJECTS MOUND PLANT MIAMISBURG, OHIO

List of Figures

Figure 1.1. Southwestern Ohio and location of Mound Plant (DOE, 1979).
Figure 3.1. Site map showing locations of D&D projects.

List of Tables

Table 3.1. Schedule and cost for the proposed action
Table 3.2. Expected Levels of Radioactive Contamination
Table 3.3. Estimates of waste to be generated during D&D operations
Table 3.4. Pu-238 emissions from past D&D activities given in percent of the DOE Derived Concentration Guide
Table 4.1. Emission figures of certain radioactive and non-radioactive materials discharged in different environmental media


ENVIRONMENTAL ASSESSMENT AND (FONSI) FOR MOUND PLANT DECONTAMINATION AND DECOMMISSIONING PROJECTS

                                                                             
                                  DOE/EA - 0683
                    ENVIRONMENTAL ASSESSMENT FOR MOUND PLANT 
                       DECONTAMINATION AND DECOMMISSIONING
                                    PROJECTS
                                    May 1995
                         UNITED STATES DEPARTMENT OF ENERGY

LIST OF ACRONYMS AND ABBREVIATIONS

AEA                    Atomic Energy Act
ALARAAs                Low As Reasonably Achievable
ANSPD                  Advanced Nuclear Systems and Products Division 
APE                    Annual probability of exceedance
BVA                    Buried Valley Aquifer
CAA                    Clean Air Act
CERCLA                 Comprehensive Environmental Response, Compensation, and Liability Act
CFR                    Code of Federal Regulations
CH                     Contact Handled
Ci                     Curie
CWA                    Clean Water Act
D&D                    Decontamination and Decommissioning
DCG                    Derived Concentration Guide
DOE                    U.S. Department of Energy
DOT                    U.S. Department of Transportation
dpm                    Disintegrations per minute
EA                     Environmental Assessment
EDE                    Effective Dose Equivalent
EIS                    Environmental Impact Statement
EPA                    U.S. Environmental Protection Agency
ER                     Environmental Restoration
FFA                    Federal Facilities Agreement
FIFRA                  Federal Insecticide, Fungicide, and Rodenticide Act
FONSI                  Finding of No Significant Impact
FSAR                   Final Safety Analysis Report
FY                     Fiscal Year
H                      Hot Laundry (Building)
HEPA                   High Efficiency Particulate Air
HH                     Stable Isotope (Building)
HSWA                   Hazardous and Solid Waste Amendments
kg                     kilogram
l                      liter
Ci                    microcurie
MCL                    Maximum Contaminant Level
m                      meter
mrem                   millirem
MSL                    Mean Sea Level
N.A.                   Not Applicable
nCi                    nanocurie
NE                     DOE's Nuclear Energy Program
NEPA                   National Environmental Policy Act
NIOSH                  National Institute for Occupational Safety and Health
NPDES                  National Pollutant Discharge Elimination System
NTS                    Nevada Test Site
OMA                    Office of Military Applications
OSHA                   Occupational Safety and Health Act
pCi                    picocurie
ppm                    parts per million
R                      Research (Building)
RAPCA                  Regional Air Pollution Control Agency
RCRA                   Resource Conservation and Recovery Act
SARA                   Superfund Amendments and Reauthorization Act
SD                     Sanitary Disposal 
SM/PP                  Special Metallurgical and Plutonium Processing Buildings
SW                     Semi-Works (Building)
T                      Technical (Building)
TRU                    Transuranic
TSCA                   Toxic Substances Control Act
UGL                    Underground Liquid Waste Transfer Lines
USC                    United States Code
USDA                   U.S. Department of Agriculture
VOC                    Volatile Organic Compound
WD                     Waste Disposal (Building)
WIPP                   Waste Isolation Pilot Plant 
WTS                    Waste Transfer System

1.0 INTRODUCTION

1.1 OVERVIEW

This Environmental Assessment (EA) was prepared to meet the requirements of the National Environmental
Policy Act (NEPA) of 1969 (42 USC 4321 et seq.) and covers seven decontamination and decommissioning
(D&D) projects at Mound Plant in Miamisburg, Ohio, that have not been addressed in the Final Environmental
Impact Statement for Mound Facility [U.S. Department of Energy (DOE), 1979].  The proposed action involves
the D&D of radioactively contaminated surplus rooms in three buildings, the decontamination and demolition of
two surplus buildings and associated radioactively contaminated soil, and the decontamination of other
radioactively contaminated soil areas.  Room decontamination will allow restricted use of the rooms.  Soil
decontamination will reduce contamination to levels suitable for unconditional release. 
Mound has an ongoing D&D Program in support of its mission and DOE requirements.  This program requires
that all D&D proposed actions have the appropriate NEPA review and determination.  This EA covers the
currently planned projects not covered by the FEIS, 1979.  As future projects are proposed under the D&D
program, they will receive the appropriate NEPA review and determinations.

1.2 MOUND PLANT

The Mound Plant is a federal facility operated by EG&G Mound Applied Technologies, Inc., for the DOE in
Miamisburg, Ohio, which is approximately 16 km (10 miles) southwest of Dayton (Figure 1.1).  Mound
originated as a technical organization in 1943 as part of the Manhattan Engineering District.  Construction of a
permanent physical facility in Miamisburg began in 1947 and operations began in 1949.  Mound's current
mission includes conduct of DOE programs in environmental restoration, safe shutdown, waste management,
heat-source testing, and fusion fuel systems.
The radionuclides of primary environmental concern at Mound from either current or past operations are
plutonium-238 and tritium.  The local environment is monitored primarily for these compounds (Farmer, et al.,
1991).  In addition, thorium-232 was stockpiled at Mound and other heavy radionuclides were involved in
several operations.  The only known nonradiological hazardous materials are asbestos,mercury, and volatile
organic compounds (VOC).  The contamination addressed by the D&D projects includes all these materials
except the volatile organic compounds (VOC).
Figure (Page 2)
Figure 1.1.  Southwestern Ohio and location of Mound Plant (DOE, 1979).

2.0 PURPOSE AND NEED FOR AGENCY ACTION

2.1 PURPOSE AND NEED FOR AGENCY ACTION

Agency action is needed to eliminate sources of radioactive emissions and reduce the costs of continuing
radiological surveillance at Mound.  DOE is involved in a continuing effort to keep Mound in compliance with
DOE Orders 5400.5, Radiation Protection of the Public and the Environment; 5480.11, Radiation Protection for
Occupational Workers; and 5820.2A, Radioactive Waste Management; and to meet requirements within the
Federal Facilities Agreement (FFA) between the U.S. Environmental Protection Agency (EPA) and DOE signed
in 1990.  This agreement was superseded in 1993 by the three-party Federal Facilities Agreement (FFA) that
added the Ohio Environmental Protection Agency (EPA) to the agreement.  The Sanitary Disposal (SD) Plant,
Building 21, Office of Military Applications (OMA) Underground Lines (UGL), and Office of Military
Applications (OMA) Soils Areas projects are in the agreed clean-up schedule contained in the FFA.  Failure to
comply with this schedule could result in fines and/or legal action against the DOE.  The DOE Orders guide
Mound's stated policy and the goals of the agency with regard to the decontamination of inactive buildings for
eventual release with radiological restrictions and the removal of contaminated soils to levels suitable for release
without radiological restrictions.  High levels of tritium within deteriorating gloveboxes present a growing
radiological threat that should be addressed through decontamination.  In addition to addressing legal, policy,
and safety issues, agency action is needed to eliminate many small sources of potential radioactive emissions
from the Mound site. 

3.0 PROPOSED ACTION AND ALTERNATIVES

3.1 INTRODUCTION

Several D&D projects have been proposed at Mound to address radioactively contaminated soil and facilities for the
protection of workers, the public, and the environment.  The action at Mound described in this EA includes seven D&D
projects covered in Section 3.2.  The locations of these projects are shown in Figure 3.1.  The D&D involves
remediation of contaminated buildings or other structures or specific rooms within buildings (Section 3.3) and excavation
and disposal of contaminated soil and other materials (Section 3.4).  The remediation involves demolition of reinforced
concrete structures, cleaning and removal of equipment and piping, structural decontamination, soil excavation, waste
packaging, and disposal of waste.  A sampling program would be used to verify the success of the remediation activities. 
The contamination present at most D&D projects (except as noted in Section 3.2) is thought to be entirely radioactive,
because no traceable paths for nonradioactive hazardous materials are known, except for asbestos which is present at
many of the projects.  Removal and disposal of asbestos are included in the D&D actions.  
The overall D&D program at Mound includes other projects already underway that have previously received NEPA
review.  These include the Waste Transfer System, the SM Building Leach Field and the soils surrounding the WD
Building.  The first two were covered under the site-wide FEIS and the third project under a categorical exclusion. 
Characteriztion activities for all of these projects as well as the HH-WD line remedial activities have also been covered
under a categorical exclusion.   The proposed action described in this EA would not prejudice the selection of any future
proposed D&D projects or alternatives.
The decontamination and release criteria necessary to meet the cleanup standards and disposal requirements established
for the D&D activities are described in Section 3.6.  Section 3.7 summarizes the amounts and types of waste expected to
be generated.  Section 3.8 covers packaging and transportation requirements.  Emissions expected from the proposed
action are covered in Section 3.9.  Alternatives to the proposed action are covered in Section 3.10. 

3.2 PROPOSED ACTION SUMMARY

3.2.1 General

The proposed action consists of seven D&D projects at Mound.  The action would remove potential sources of minor
chronic radioactive emissions to the environment.  Although only minor renovation activities would take place for reuse
of the facilities, the D&D actions would reduce radioactive contamination to a level that would permit reuse with
radiological restrictions of buildings and release without radiological restrictions of soil areas (see Section 3.6 for
explanation of release criteria).  Both low-level and transuranic (TRU) waste would result from the D&D actions.  Low-
level waste is defined in DOE Order 5820.2A as waste that contains radioactivity and is not high-level or TRU waste. 
TRU waste is defined in DOE Order 5820.2A as a waste contaminated with alpha-emitting transuranium radionuclides
with half-lives greater than 20 years and concentrations greater than 100 nCi/g at the time of assay.  Following are brief
descriptions of the D&D actions proposed for each project.
The current estimated timetable and costs for these projects are listed in Table 3.1.  Emissions from the proposed action
are expected to be minimal, as has been the experience during past similar operations (see Section 3.9 for emissions
information).  The expected levels of radioactive contamination for each project are listed in Table 3.2.
Figure (Page 5)
Figure 3.1.  Site map showing locations of D&D projects.

                                Table 3.1.  Schedule and cost for the proposed action
Project                      Start Date   Completion Date   Cost in thousands 
R-140 Laboratory             a            03/13/03          $4,139    
SW Building Areas, SW Cave   a            03/25/10          $26,505    
OMA Underground Linesb       08/11/97     12/19/02          $37,043   
WD Building Annex            a            01/12/99          $3,441    
SD Plant                     a            12/30/99          $10,355    
Building 21                  09/01/97     05/11/05          $41,945    
OMA Soils Areas              a            01/17/05          $64,890   
Total                        a            03/25/10          $185,318   
a Upon completion of NEPA review.
b Excludes HH-WD project completed in FY94 (Cat-x, B6.1 in FR 57 15156, NEPA I.D. No.   MDP-93-008)

                              Table 3.2.  Expected levels of radioactive contamination
                                                    Building Projects
                                              (estimated maximum values)
                                                           Plutonium-238                                         Tritium 
                                                           Direct          Alpha Wipe        Total               Beta Wipe      Total 
Project                                                    (dpm/100cm2)    (dpm/100cm2)      (curies)            (dpm/100cm2)   (curies) 
WD Building Annex                                               400,000     1,000            0.04                700            0.010 
SW Building                                                      40,000a      300            0.01                10,000b        30.400 
R-140                                                         2,600,000c   135,000           0.90                700            0.001 
SD Plant                                                        100,000       300            0.004               N/A            N/A 
Totals                                                                                       0.954                              30.411 
        Notes: a Floor slab and gloveboxes contain higher levels. 
            b 10,000,000 dpm/100 cm2 expected inside gloveboxes. 
            c TRU levels are expected inside gloveboxes.   
                                                      Soils Projects
                                              (estimated maximum values)a
                            Plutonium-238                     Thorium 
                            Concentration   Total             Concentration        
Project                     (pCi/gram)      (curies)          (pCi/gram)Total 
                                                              (curies) 
Building 21                 34,000          296.0             60                  0.4 
Soil Areas                  1,000           16.7              300                 4.2
Underground Lines           1,000           3.1               300                 0.9 
Totals                                      315.8                                 5.5 
       Note: a Total Tritium in the Soils Projects is negligible.

3.2.2 R-140 Laboratory D&D

The R-140 Laboratory in the Research (R) Building at Mound Plant is a 400-ft2, plutonium-contaminated, inactive,
surplus laboratory containing contaminated gloveboxes and associated piping and equipment.  A 10,000-ft2 return-air
plenum/crawl space and plutonium filter system serving the laboratory and other rooms contain large amounts of
asbestos and some plutonium.  Additional asbestos insulation is present on piping and equipment.  The project
includes cleaning and removal of radioactively contaminated equipment, structural decontamination, asbestos
removal, and disposal of the wastes generated by the D&D operations.

3.2.3 Semi-Works Building Areas D&D

The Semi-Works (SW) Building D&D Project is designed to clean five radioactively contaminated, inactive, surplus
rooms and support areas and provide extensive D&D of inactive Basic Energy Sciences Program areas in the SW
Cave, a concrete-walled room (process cell) previously used for unconfined operations.  The SW Cave was used to
recover protactinium-231, thorium-230, and thorium-229 from Cotter concentrates and uranium-233.  The other five
rooms contain gloveboxes contaminated with tritium and other radioisotopes, fumehoods, process piping, and
internal non-load-bearing structures.  A total of 4,500 ft2 of SW Building would undergo D&D.  Approximately
2 liters of containerized tritiated mercury, a radioactive mixed waste, is present.  Asbestos is also present on piping
and equipment.
The project includes cleaning and removal of radioactively contaminated gloveboxes, fumehoods, a large
manipulator box, and the associated piping and equipment; structural decontamination; and disposal of the wastes
generated by the D&D operations.  

3.2.4 D&D of Office of Military Applications (OMA) Underground Liquid Waste Transfer Lines to the Waste Disposal (WD) Building

The OMA Underground Liquid Waste Transfer Lines (UGL) D&D Project consists of the characterization and
removal of approximately 3,400 linear feet of radioactively contaminated liquid waste transfer lines (mostly vitrified
clay pipe) and associated contaminated (primarily > 100 pCi/g plutonium) soils.  The lines, constructed to carry
radioactively contaminated liquid waste from buildings R (Research), SW, H (Hot Laundry), HH (Stable Isotope),
and T (Technical) to the WD Building, leaked or were suspected of leaking and were removed from service.  Some
lines have been capped.  Contamination remains in and around the lines.  The D&D project would include
excavation of reasonably accessible lines, removal of surrounding contaminated soil, and plugging inaccessible lines
that run beneath buildings.  Sampling has shown no evidence of nonradioactive hazardous material.  Should
nonradioactive hazardous materials be found, they would be turned over to Mound's Waste Management Group for
disposal with Mound's hazardous operating wastes.  Additional sampling would verify the absence of hazardous
constituents following D&D.  For the purpose of estimating waste volumes, the depth range of contamination was
assumed to be from 2 feet below the surface to 6 feet below the surface.  The depth range was chosen in order to
adequately quantify the potential contamination from the typical underground waste line which is at 4 feet below the
surface.

3.2.5 Waste Disposal Building Annex D&D

The WD Building Annex D&D project is designed to decontaminate seven radioactively contaminated, inactive,
surplus rooms, occupying approximately 4,290 ft2 of the WD Building Annex.  These rooms contain tritium- and
plutonium-contaminated gloveboxes, clariflocculators, holding tanks, piping, and internal non-load-bearing
structures.  Other radioactive materials, including americium, cobalt, thorium, and cesium, may be present.
Asbestos is also present on piping and equipment.  The D&D project would include cleaning and removal of
radioactively contaminated equipment, structural decontamination, and disposal of the wastes generated by the D&D
operations. 

3.2.6 Sanitary Disposal Plant D&D

The SD Plant is a 500-ft2, two-floor, reinforced concrete and concrete-block structure built in 1948 to process
sanitary waste.  It was replaced in 1972.  Associated equipment includes reinforced-concrete tanks, open concrete
drying basins, and approximately one acre of contaminated soil drying beds.  The facility became contaminated with
plutonium-238, polonium-210 daughter products, cobalt-60, and isotopes of bismuth due to leaks into sanitary lines
from defense radioactive material processing areas.  The D&D project includes decontamination and demolition of
the pumping building, enclosed equipment, underground tanks, and contaminated sanitary lines, as required;
excavation of drying beds and associated soil; disposal of the wastes generated by the D&D operations; and
sampling for hazardous and radioactive constituents to confirm the effectiveness of the D&D operations.  For the
purposes of estimating wastes, the depth range of soil contamination was assumed to be 0 to 20 feet.  These depths
were chosen for estimating wastes in order to cover the range of assumed contamination from the drying beds
(surface), underground waste lines (4 to 6 feet below grade), and the digester (approximately 15 feet below grade).

3.2.7 Building 21 D&D

The Building 21 D&D project consists of the decontamination and demolition of a reinforced concrete building and
the removal of adjacent radioactively contaminated soil.  Building 21 has approximately 5,000 ft2 of floor space. 
The surrounding area of contaminated soil covers approximately four acres.  The building was constructed in 1966
to contain approximately 5,000 tons of bulk thorium-232 sludge, which was sold in 1975.  After cleanup, the
building was used to store Cotter concentrate in drums until 1987.  The soil contamination resulted from leakage of
the thorium-232 and staging of plutonium-238 waste containers near the building during the 1970s.  Sampling has
shown no evidence of nonradioactive hazardous material.  For the purposes of estimating waste volume, the
contaminated soil was assumed to range from 1 foot (due to airborne deposition of bulk thorium sludge during its
placement within the building) to 3 feet (due to the leakage of Plutonium-238 waste containers).

3.2.8 OMA Contaminated Soils Areas D&D

The OMA Soils D&D Project consists of the characterization and removal of radioactively contaminated soil at ten
individual sites ranging in size from 0.1 to 1.6 acres and totaling approximately 7 acres.  The principal contaminants
are plutonium and thorium, with some minor amounts of cesium, cobalt, actinium, and radium.  Some asbestos-
contaminated soil may be present.  The soils were contaminated by site operations, pipeline leakage, and waste
management operations.  Sampling is planned to verify the assumption that no nonradioactive hazardous material is
present.  For the purposes of estimating the amount of waste generated, the depth range of soil contamination was
assumed to be from 0 to 20 feet.  This depth range was chosen to include surface contamination caused by former
site operations and contamination at approximately 20 feet below grade caused by the burial of drums contaminated
with thorium.

3.3 BUILDING DECONTAMINATION AND DECOMMISSIONING

D&D of the contaminated areas in buildings would be performed in three general phases:  (1) glovebox, equipment,
and piping removal; (2) structural decontamination; and (3) structural demolition.
Equipment, benches, and piping would be removed from the room, cut up to reduce volume, and disposed of as
radioactive waste (Sections 3.6 and 3.7).  It is assumed that all equipment, benches and piping are contaminated to
the degree that decontamination for reuse is not feasible.  These items are marked as contaminated waste.  Suspect
material would be sampled prior to disposal to determine if it is radioactive waste or uncontaminated material. 
Gloveboxes that were used for handling radioactive materials would undergo a more extensive D&D process.  The
interior of the box would be cleaned to remove loose contamination, then painted to fix any residual contamination
in place.  Then the box would be disassembled or cut up and the pieces placed in standard radioactive waste disposal
containers.
Structural decontamination addresses contamination with alpha emitters and involves the removal of any
contaminated room surfaces.  Removal of the floor covering and sandblasting paint off the walls and ceiling will
often remove most contamination.  If contamination above release criteria remains, then a powered vacuum scabbler
would be used to chip away quarter-inch layers of concrete from the walls, ceilings, or floors as required.  In
extreme cases, or where contaminants have penetrated beneath floor slabs along cracks, the floor may be carefully
disassembled by hand to avoid spreading contamination.  Alternatively, concrete may be sawed and removed as
slabs to allow removal of contaminated materials.
Most alpha-emitting contamination is spread by dust.  To control dust, a water mist would be sprayed on the
surfaces as they are being chipped away.  Paint would be used as necessary to hold the contamination temporarily,
and a large, High Efficiency Particulate Air (HEPA) filtered vacuum cleaner would be used as necessary to remove
surface dust.  Long-handled tools and a remote-controlled jackhammer/shovel may be used to keep workers away
from contaminated dust.  Respiratory protection and protective clothing for dermal protection which includes gloves,
boots, and other clothing as required per the work permit would be used.
Contamination from tritium, a radioactive gas and beta emitter, is usually contained in fumehoods and gloveboxes. 
The stacks are constantly monitored and set to alarm at a fraction of the allowable limit.  Decontamination of tritium
oxide-contaminated equipment and room surfaces is accomplished by applying cleaning liquids and wiping the
liquids up with rags or a mop.  If contamination occurs under tile cracks, the tile would be removed, the area
cleaned, and new tile installed.
The final element of structural decontamination is verification that the remaining contamination in the rooms is at or
below the release criteria (Section 3.6), after which surfaces would be sealed and monitors installed.  After further
testing by Mound and an independent verification contractor, the areas would be returned to use with the
radiological restriction that any future penetration or modification would require monitoring and approval by Mound
Health Physics Operations.
Because most buildings already have appropriate ventilation systems, much of the D&D work can be safely
performed in the rooms without airborne spread of contaminated material.  In other instances, temporary
enclosures or airlocks around the entrances to rooms would be erected.  These temporary enclosures would be
connected to the building's main ventilation system via HEPA filters or portable HEPA-filtration units.
All materials and wastes would be surveyed and certified by Mound health physics personnel.  All air emissions
would be filtered by HEPA filter systems to maintain levels below the allowable limits specified in Section 3.5. 
Contaminated waste water would be either routed through the plant's water treatment facility, WD Building,
(which has the capacity to properly treat the water) or solidified and packaged as radioactive waste.  The
contaminated solid wastes (metal, filters, rags, mops, and residues from the cleaning operations) would be
appropriately packaged and shipped to the Nevada Test Site (NTS) as part of Mound's plant operations waste
stream.  Decontaminated and uncontaminated materials may be reused or disposed of as ordinary nonhazardous
wastes as part of Mound's nonhazardous plant operations waste stream.  The impacts of waste disposal are
discussed in Section 5.6.5. 
Structural demolition, where required, would proceed using a combination of the environmental protection
features described above and in Section 3.4.  Personnel safety methodology follows the Mound Safety and
Hygiene Manual (MD-10286), which sets forth policies, establishes programs, and addresses all industrial and
explosive safety and industrial hygiene issues and concerns.  The manual is based upon many sources, including
29 CFR 1910 and DOE Order 5480.11. 

3.4 SOIL DECONTAMINATION AND DECOMMISSIONING

The soil D&D process includes verification of soil contamination, removal of contaminated soil, and disposal of
the wastes generated.  Certification after removal of the contaminated soil would ensure that cleanup standards
described in Section 3.6 are met.  Appropriate disposal methods would be selected as described in Sections 3.6
and 3.7.
The depth to ground water on the main hill area varies over a range of 18 to 33 feet.  Ground water is not
expected to be encountered during any of the D&D projects.
Underbrush and trees would be cleared prior to soil characterization and excavation and would be monitored for
radioactive contamination.  Very few trees would be removed.  Usually, the vegetation is shredded and used for
plant mulch.  If any vegetation is radioactively contaminated, it would be shipped to a licensed, authorized
facility for disposal.  In the excavation process, approximately the top six inches of soil and all underlying soil
that is contaminated above release criteria would be removed, and disposed of at Nevada Test Site.  UGL would
be exposed and surveyed as excavation proceeds.  Surplus lines would be checked for water and, if necessary,
the water would be removed and the lines capped.  The contaminated lines and soil around them would be
excavated and the pipes and lines cut up and boxed.  All excavation would be sloped, shored, or shielded per
Occupational Safety and Health Act (OSHA) standards (29 CFR 1926).  Off-site soil would be used to backfill
the excavation, if necessary.  Disturbed areas would be re-vegetated or otherwise stabilized following
excavation.
Release of radioactivity to the air in the form of fugitive dust particles would be minimized through monitoring
and mitigation controls such as water misting.  The wind velocity would be measured and recorded each
working hour and disturbance of the soil would be suspended whenever the average wind velocity exceeds 25
mph.  A dust control agent would be sprayed on all freshly exposed soil at the end of the work day and during
the excavation as needed.  
The spread of radioactively contaminated soil from water runoff would be controlled at the excavation sites by
use of existing retention ponds, settling basins, filtering systems, new silt fences and retention ponds.  Work
would stop if rainfall exceeds 0.1 inches per hour or wind speeds greater than an average of 25 mph are
experienced, and the work area would possibly be covered with a tarp.  At night and on weekends the work
area would be stabilized by covering and ensuring that erosion controls are in place.  In addition, before water
and sediment are released, they would be monitored and then released to one of two plant retention basins or
processed and packaged as radioactive waste if required.
All personnel within the work area would wear respirators and protective clothing approved by the National
Institute for Occupational Safety and Health (NIOSH) when required.  Attending health physics personnel would
monitor the workers, ensure that proper procedures and equipment are used, and ensure that contamination is
not released to the environment or other work areas.  In addition, asbestos removal would be supervised by a
State of Ohio Certified Asbestos Hazard Evaluation/Abatement Specialist.

3.5 RADIATION PROTECTION

In 1973, Mound developed and implemented a Radiation Protection program with measurable goals for all
operations utilizing radiation producing machines or radioactive materials to ensure that occupational exposures
were maintained at the lowest possible level.  Since 1973, Mound has consistently reduced and lowered its
annual occupational and radiation worker exposure each year.  Tracking doses to workers is possible since all
plant personnel working in radiation areas are provided with and are required to wear a dosimeter.  For
example, the Mound as low as reasonably achievable (ALARA) goal for 1990 was 25.0 person-rem collective
effective dose equivalent and at the end of 1990, the total exposure for the Mound Plant was less than
5.0 person-rem.  The D&D Program occupational and radiation worker person-rem was the lowest of the major
operating groups within the plant, with a total of 0.07 person-rem.  The standards and requirements adopted by
Mound to meet DOE on-site requirements (primarily DOE Order 5480.11) are documented in MD-10019,
Nuclear Radiation Safety, which addresses administration, dose limits, radiation survey requirements,
monitoring, the ALARA program, contamination control, instrumentation, and handling.
DOE Order 5480.11 supersedes that part of DOE Order 5480.1A, Chapter XI, "Requirements for Radiation
Protection," and became effective January 1, 1989, establishing radiation protection standards and requirements
for the DOE and DOE contractor operations with respect to the protection of workers from ionizing radiation. 
The Order defines the "Occupational Worker" as an individual who is either a DOE or DOE contractor
employee; an employee of a subcontractor to a DOE contractor; or an individual who visits to perform work for
or in conjunction with DOE or utilizes DOE facilities.
Personnel dose equivalent expected to result from the proposed D&D projects would remain well within the
limits established by DOE Order 5480.11.  Engineering controls would be used to reduce dose potential
(especially airborne) and would be augmented by the use of respirators and other personnel protection
equipment.  Neither internal dose equivalent (primarily from alpha/beta contamination) nor external dose
equivalent (primarily from gamma radiation) for the maximally exposed worker would be expected to exceed
0.5 rem/year.  Total exposure would be minimized, and no single individual would be expected to receive a
dose equivalent in excess of the ALARA goal of 0.5 rem/year.
Visitors to Mound are provided the same quality radiation protection as any occupational worker who works at
the plant.  When entering a radiation control area, the visitor receives the same radiation protection as would a
Mound radiation worker, to ensure compliance with the DOE Orders.

3.6 DECONTAMINATION AND RELEASE CRITERIA

Release criteria and cleanup standards have been established for D&D activities at Mound as follows:  (1)
Contaminated soil is normally removed down to levels suitable for release without radiological restrictions
consistent with DOE Order 5400.5 and (2) Buildings and structures at Mound are cleaned to levels consistent
with reuse with radiological restrictions.  These criteria were set forth by the Coordinated Advanced Nuclear
Systems and Products Division (ANSPD), Nuclear Energy (NE) and Office of Military Applications (OMA)
Decontamination and Decommissioning (D&D) Program Plan dated March 31, 1978 (DOE,1978), and were
subsequently approved formally by DOE in the Memorandum of Understanding between the Office of Military
Applications (OMA) and the Office of Terminal Waste Disposal and Remedial Action (NE-20) for the
Coordinated Decommissioning of Inactive Advanced Nuclear Systems and Products Division (ANSPD) and OMA
Areas at the Mound Facility, (DOE, 1982).
Contaminated soil will be removed until contamination levels consistent with unrestricted use are encountered. 
Excavation areas will be gridded off and surface samples will be taken from each square.
In inactive facilities, contamination will be reduced to an ALARA level and remaining contamination will be
permanently sealed using concrete and epoxy paint, as required, so that use is possible with minimal
radiological restrictions, as specified in DOE Order 5400.5.
The disposition of radioactive waste from D&D activities depends on its classification as either TRU or low-
level waste.  TRU waste contains alpha-emitting TRU radionuclides with half-lives greater than 20 years and an
activity concentration greater than 100 nCi/g.  Low-level waste is defined in DOE Order 5820.2A as waste that
contains radioactivity and is not high-level or TRU waste.  
Release criteria for airborne emissions are based on DOE Order 5400.5.  Continuous air monitoring at D&D
sites and site boundary monitoring verify that emissions are properly controlled.  Continuous air monitoring
assures that no threat to workers is present and that cumulative emissions of radionuclides from excavation areas
or from building D&D activities will not result in members of the public receiving in excess of the DOE
primary standard, which is an effective dose equivalent (EDE) of 100 mrem/year.

3.7 WASTE GENERATED

Various types of waste would result from the proposed D&D operations.  Waste estimates in Table 3.3 are
based upon radiological characterization, process knowledge, screening data, and extensive experience in D&D
at Mound.  Processes are all mechanical in nature:  high-pressure water jet, scabbling, sandblasting, and use of
jackhammers.

Table 3.3.  Estimates of waste to be generated during D&D operations.
                      Asbestos        Hazardous         TRU                 Low-level waste   Mixed 
 R-140                200 ft3         None              550 ft3             3,000 ft3         None 
 SW Building          500 ft3         None              None                39,000 ft3        2 liter 
                                                                                              (Contain-
                                                                                              erized) 
 OMA UGL              None            None              None                191,000 ft3       None 
 WD Annex             50 ft3          None              110 ft3              3,000 ft3        None 
 SD                   5 ft3           None              None                 78,000 ft3       None
 Building 21          None            None              None                241,000 ft3       None 
 OMA Soils            None            None              None                388,000 ft3       None 
 TOTALS               755 ft3         None              660 ft3              943,000 ft3      2 liter
Past experience with decommissioning of Pu-238- and Th-232-contaminated soils has led to a working
knowledge of the expected profile of contamination in soil.  Typically, higher concentrations of radioactivity are
found in the immediate vicinity of underground process lines or at the location of known spills.  When
excavating contaminated soil from underneath radioactive process buildings sites, knowledge of the nature and
location of operation within the building provides information on the expected distribution of contamination.
Natural drainage patterns and soil characteristics are relied upon to determine the probable spread of
contamination both downward into the ground and horizontally through the ground.  If available, radiological
surface and core screening data is used to verify or nullify the initial expected contamination profile. 
Experience,  process knowledge, soil data, and screening data are then used together to approximate the depth
and horizontal spread of radiological contamination.  These figures provide an estimate for the volume of soil
that requires decommissioning.
Radioactive liquid waste from D&D operations would be handled according to MD-70180, Mound Radioactive
Liquid Waste Disposal.  All low-level alpha-contaminated waste water is routed to WD Building by lines or
tanker truck.  After various treatments to decontaminate the water to meet specific discharge requirements under
the Clean Water Act (CWA), the processed waste is released into the Great Miami River.  Low-level tritiated
water is solidified in drums and disposed of at Nevada Test Site.  Sludge is pumped into sludge storage pits,
solidified and emptied into drums.  The drums are stored on-site until an approved application is accepted for
disposal at NTS.

3.8 PACKAGING, TRANSPORTATION, AND WASTE ACCEPTANCE CRITERIA

D&D operations will generate and require handling, packaging, and shipping of various types of waste.  D&D
operations follow standard procedures that have been applied effectively in numerous similar operations.  Both
the EPA and U.S. Department of Transportation (DOT) shipping regulations will be routinely followed to
ensure safe packaging, temporary storage, and shipment.

3.8.1 TRU Waste

TRU waste would be considered newly generated and would be packaged, documented, and certified by the
generator as being in compliance with Waste Acceptance Criteria for the Waste Isolation Pilot Plant (DOE,
1991).  At Mound, TRU waste handling and packaging is performed following internal manuals MD-70205,
TRU Waste Management, and MD-10203, Mound WIPP Certification Program for Newly Generated Contact
Handled (CH) Transuranic Waste.  In accordance with this guidance, TRU waste is packaged in Type A
packages designed to comply with 49 CFR 173.411, General Design Requirements, and 49 CFR 173.412,
Additional Design Requirements for Type A Packages.  Type A packages must weigh more than 50 kg (110 lbs),
be secured during shipping, have removable lifting attachments, have an easily decontaminated outer surface
free from contamination-holding or water-trapping features, maintain adequate containment and shielding over a
wide range of temperatures, and meet specified testing requirements.  TRU waste would be stored at Building
31, an existing TRU-waste holding area, until national decisions about the ultimate disposal site for the waste
have been finalized. 

3.8.2 Low-Level Waste

Mound packages, handles, and ships low-level waste to the NTS for disposal in accordance with NVO-325
criteria (DOE et al., 1988); MD-81240, Low-Level Waste Management; and the packaging requirements of 49
CFR 173.412.  NVO-325 criteria must be met before NTS will accept low-level waste.  The waste application
submitted to NTS provides documentation of procedures demonstrating compliance to NVO-325 characterization
requirements and DOE Orders.  These procedures are subject to audit and verification by the Nevada
Operations Office.  MD-81240 outlines the Mound Nuclear Low-Level Waste Management Program and
provides specific information on container specifications, waste-generator responsibilities, health physics survey
requirements, packaging and transportation procedures, storage, and other germane activities necessary to
implement regulations addressing low-level waste.  Specific requirements for packaging are consistent with the
requirements put forth in 49 CFR 173.412.  Packaging requirements for low-level waste are slightly less
stringent than for TRU waste, but still ensure safe waste handling.  Packages for non-liquid waste are
constructed so that they will maintain structural integrity during normal transportation and handling conditions
and so that neither equipment nor personnel become contaminated during off-loading.  Radioactively
contaminated asbestos waste is planned to be disposed of at the NTS.  Should NTS be unable to accept
radioactively contaminated asbestos waste, an alternative site would be investigated.  If an alternative site has
not been secured by the time the asbestos is ready for shipment, it will be temporarily stored at Mound. 
The NTS was chosen as the disposal site for Mound waste primarily as a result of the decision not to administer
two separate waste programs at Mound, one for tritium and one for plutonium.  In November of 1979, Mound
received guidance for waste shipments from the Office of Nuclear Waste Management which provided Mound
with a choice of two sites for disposal, Nevada Test Site or Savannah River.  In the guidance, it was requested
that no tritium be sent to Savannah River.  Because a portion of Mound's waste is contaminated with tritium,
the decision was then made to send all of the waste to Nevada Test Site.  It was concluded that this would be
the most reasonable as well as cost effective disposal option.  Mound has and continues to investigate
commercial facilities as potential alternatives for waste disposal. 

3.8.3 Radioactive Mixed Waste

Tritiated mercury, present in SW Building, is designated as radioactive mixed waste because it is a low level
waste containing both radioactive (tritium) and hazardous components (mercury, waste # U151, 40 CFR 261.33;
effective August 8, 1990, prohibited for land disposal, 40 CFR 263.35) as defined by DOE Order 5820.2A and
the Resource Conservation and Recovery Act (RCRA), respectively.  Mound's mixed waste handling system is
described in MD-70523, Nonradioactive Hazardous, Radioactive Mixed, Toxic, and Solid Waste Management.
The tritiated mercury in the SW Building (Section 3.2.3) would be processed by amalgamation with zinc to
stabilize the mercury.  The amalgamated mercury would be packaged in accordance with the above criteria and
held in Building 23, an existing mixed-waste holding area, pending national decisions on mixed waste disposal.  

3.8.4 Solid Waste

Uncontaminated solid waste, after proper monitoring, would be disposed of according to Mound Plant guidelines
(MD-70523) in a local landfill along with other solid waste from plant operations. Nonradioactive asbestos
waste would be disposed of in accordance with applicable requirements at an approved local waste disposal site.

3.9 EMISSIONS

Routine emission and ambient environmental monitoring is being conducted at Mound and would continue
through the D&D operations.  Annual monitoring reports describe this activity (e.g., Farmer, et al., 1991).
Overall emissions from Mound are summarized in Section 4.7.  The proposed D&D actions are representative
of the operational tasks that were performed for past D&D activities which were monitored.  The values for Pu-
238 are listed below in Table 3.4 and are representative of the level of emissions to be expected during the
proposed action.  

Table 3.4.  Pu-238 emissions from past D&D activities given in percent of the 
DOE Derived Concentration Guide (DCG) (N/D equals non-detectable) 
                    1985            1986              1987                1988              1989        1990   DCGs 
   Air              0.6%            0.6%              0.6%                0.3%              0.2%        0.1%   3.E-14 
   Water            0.3%            0.2%              0.1%                0.1%              0.5%        0.2%   4.E-08 
   Ground           N/D             N/D               N/D                 N/D               N/D         N/D    4.E-08
water
DCG values are for inhaled air and ingested water in uCi/ml.

3.10 ALTERNATIVES TO PROPOSED ACTION

3.10.1 No Action

If no action is taken, the radioactively contaminated soil, equipment, and structures would remain in place,
leading to increased radiological risks to personnel at Mound Plant.  Current emissions into the environment,
summarized in Table 4.1, would continue.  Although the emissions listed in Table 4.1 would not be expected to
decrease significantly due to the proposed action, the threat of an unplanned release of contamination would
decrease.  In the long term, contaminants would continue to disperse into soil and ground water.  Additional
deterioration of the buildings or damage due to an accident could release additional amounts of radioactivity to
the environment.  Risk of release would increase because the only containment for most of the contaminants are
the buildings themselves.

3.10.2 Deferred Action

Deferred action has the same effects as no action until D&D is undertaken.  In the long term, D&D will be
accomplished during the eventual D&D of the entire Mound site.  During the interim, radioactive emissions and
radiation exposure of on-site workers would continue and probably increase. Environmental risk will also
continue, with the overall probability of a release of radiation through natural events growing steadily.

3.10.3 Complete Demolition

Complete demolition of SW Building, H Building, HH Building, WD Building Annex, and R Building would
require relocation of all existing Mound operations based in those buildings.  The existing operations could be
relocated to new, or possibly existing facilities.  As the operations to be maintained would cause the new
facilities to become radioactively contaminated, this would generate new contaminated facilities for future D&D. 
Complete demolition would remove the existing functional facilities before their useful life and safe shutdown
operations could be completed.  The safe shutdown of SW Building is not scheduled to be complete until
03/20/02 and 08/01/97 for R Building.  H, HH and WD Buildings are designated as landlord buildings and are
required to remain intact as long as there are tenants at the Mound site (post FY2000).  The  complete
demolition option was selected for the SD Building (Section 3.2.6) and associated structures since the building
has been replaced and for Building 21 (Section 3.2.7) which is inactive.  Plant operations will not be disrupted
by the planned partial demolitions.

3.10.4 In-situ Treatment

In-situ treatment for areas and buildings contaminated with plutonium is not considered a feasible alternative
primarily because no proven, effective in-situ treatment for this contaminant currently exists.

3.10.5 On-site Long Term Storage

Consideration of Mound as a long term storage (100 years) facility was not proposed due to space limitations at
the Mound plant.  Mound's relatively small total site area (306 acres) would not allow for the storage of waste
in addition to regular plant operations.  Furthermore, Mound's mission will be shifting toward one of economic
development, and Mound may potentially be used by non-DOE organizations in the future.  These economic
development plans could be adversely affected by the storage of waste at the site.

4.0 AFFECTED ENVIRONMENT

This section contains a brief summary of the natural and human environment surrounding the Mound Plant. 
Most of the information in this chapter originated in the Final Environmental Impact Statement for Mound
Facility (DOE, 1979); Comprehensive Environmental Assessment and Response Program, Phase I: Installation
Assessment, Mound (DOE, 1986); and Environmental Monitoring at Mound: 1990 Report (Farmer et al., 1991).

4.1 REGIONAL AND LOCAL SETTING

Mound Plant lies on high bedrock bluffs overlooking Miamisburg, Ohio, and the Great Miami River and the
river plain one-half mile to the west (Figure 1.1).  The site incorporates two high hills divided by a minor
northeast-to-southwest-trending valley that feeds into the river along the main drainage channel.  Most of the
buildings comprising the plant occupy the northwest hill crest (Main Hill).  A smaller group of buildings lies in
the valley and on the valley slopes.  Other buildings occupy the southeastern Special Metallurgical/Plutonium
Processing (SM/PP) Hill.
Miamisburg is largely residential, with limited commercial and industrial development, and is surrounded by
predominantly agricultural land.  Mound abuts residential areas on the north, east, and southeast. 
The Mound Plant is located within the Dayton metropolitan area.  The (1990) population of Miamisburg is
17,770.  The Miami Valley Regional Planning Commission estimates the total population within a five-mile
radius of Mound to be 76,061 (based on 1988 figures).

4.2 AIR AND CLIMATE

With a continental climate, the Miamisburg area experiences moderate seasonal temperature variations.  Severe
weather, generally associated with thunderstorms, can occur in any season, and can result in damaging winds
and flash flooding.  Precipitation is common in all seasons, with an average rainfall equivalent of 40 inches. 
Surface wind is predominantly from the southwest, with annual average wind speeds ranging from 7 to 10 mph
and "fastest mile" wind speed in the Dayton area of 78 mph (DOE, 1979).  Tornados may touch down along
short and narrow paths, but are infrequent in the region.  The tornado windspeed with an annual probability of
exceedance (APE) of 10-3 is 90 mph, while for an APE of 10-6, the limit of credible cases, it is 227 mph
(Kennedy et al., 1990).  Ohio is subject to damaging hailstorms, with two or three occurring each year.  Once
every four or five years a moderate or heavy ice storm occurs, damaging utility lines and trees and interfering
with traffic.

4.3 GEOLOGY AND SOIL

The region around Miamisburg is geologically stable.  The surface of the Ordovician-age bedrock, which
consists of limestones, calcareous shales, dolomite, and thin sandstones, is covered by a thin (less than 20 feet
thick) veneer of Pleistocene-age glacial till.  The Pleistocene gravel, sand, clay, and silt till deposits thicken
towards the Great Miami River and form the Buried Valley Aquifer (BVA) discussed below.  No evidence of
solution-cavity development, recent faulting or large earthquakes, volcanic activity, or any other geologically
unstable situation has been observed in the Miamisburg area.  No mineral resources are present at Mound.
Most structures at Mound are either built directly on bedrock or lie on thin (1.5 feet thick), dense, highly
compacted glacial till.  Radioactive soil contamination has been found, mostly at the surface, in 19 of the 22
areas studied on the original Mound site (Figure 3.1) (Stought, et al., 1988).

4.4 HYDROLOGY AND WATER RESOURCES

4.4.1 Surface Water

Mound lies within the Great Miami River drainage basin, with a drainage area above Miamisburg of 2,711 mi2. 
The level of the river adjacent to Mound is controlled by the Hutchings Station Dam [680 feet above mean sea
level (MSL)], about 1.5 miles downstream from the facility.  The 100-year recurrence interval flood event
elevation adjacent to Mound is 698.67 feet.  The water from the Great Miami River is not used as a public
water supply by any municipality below Mound.
On-site surface water consists of two manmade ponds and a stream with a small, steep watershed lying
predominantly within Mound's borders.  The alluvium beneath the channel is relatively permeable and allows
flow in the channel to infiltrate the underlying aquifer.

4.4.2 Ground water

The major aquifer in the area is the BVA (DOE, 1979), which underlies the western edge of the plant and
forms the drinking water source for Miamisburg, Dayton, and the greater Dayton area.  Normal groundwater
flow is from the BVA to the Great Miami River, but pumping from Mound's water wells causes a cone of
depression in the water table, drawing water from the river into the BVA.  This cone also captures any
contaminated ground water from the Mound Site, aiding in the prevention of additional off-site ground water
contamination.

4.4.3 Water Use

Surface water is not used for drinking from either the area immediately surrounding or downstream of Mound. 
Ground water in the vicinity of Mound is used for municipal, domestic, and industrial purposes.  Of the six
municipal water supplies that lie within a 5-mile radius of the plant, the nearest are those of Miamisburg, which
are a minimum of 0.8 km (0.5 mi) away.  Private wells on the east bank of the river draw water from the BVA
immediately adjacent to Mound, with the nearest active well located at 625 Jefferson Street, approximately
2,000 feet from the site boundary.
The only industrial ground water users in the immediate vicinity of Mound are Mound Plant and the Hutchings
Power Station, which is 1.5 miles south of the plant on the west bank of the Great Miami River.  Mound
obtains its water supply from three wells within the boundaries of the plant.  Protection of these wells is a major
concern at Mound.

4.4.4 Water Quality

Surface water quality in the vicinity of Mound is generally satisfactory.  Tritium and plutonium concentrations,
which are probably attributable to Mound operations, are extremely low in the surface water at a maximum of
.022% of the DOE DCG values (Farmer et al., 1991).  The DOE DCG for tritium is 2,000 x 10-6 Ci/ml,
while the DCG for Pu-238 is 40,000 x 10-12 uCi/ml.
Ground water quality is also very good.  Mound has generated minor contamination of the ground water in the
immediate vicinity as indicated by the presence of small concentrations of plutonium-238, tritium, and volatile
organic compounds (VOCs).  Nearby wells and public supplies are monitored monthly.  Concentrations are
extremely low (Farmer et al., 1991), even less than in surface water.  
Tritium is present in the Miamisburg public supply at a level of 2.3% of the EPA standard and in a privately
owned monitoring well at 21.5% of the EPA standard.  The EPA standard is 20 x 10-6 uCi/ml.
Plutonium-238 concentrations in surface water are at .005% of the DOE DCG or less at all sampling points. 
Ground water concentrations are also very small, reaching a maximum of 16.5% of the EPA standard of 20 x
10-6 uCi/ml.  Public supplies are essentially free from Pu-238 contamination with a maximum value of 3.13 x
10-12 uCi/ml, far below the EPA standard.
Some on-site ground water VOC (trichloroethene, tetrachloroethene, chlorethene) concentrations exceed EPA
Maximum Contaminant Levels (MCLs).  Concentrations off-site are far lower, with none exceeding the MCLs. 
Full information is available in the environmental monitoring report (Farmer et al., 1991).  This contamination
is being handled under the Environmental Restoration (ER) Program at Mound.

4.4.5 Wetlands/Floodplains

A small portion of the south property, falls within the 100 year flood plain of the Great Miami River.  The
south property is outside the scope of this environmental assessment, therefore, the proposed action will not be
impacted.  A wetlands investigation was initiated in response to terms set forth in the Federal Facilities
Agreement (FFA) with DOE, U.S. EPA and Ohio EPA.  The results of the wetlands assessment indicate that
the Mound site does contain small areas onsite that meet the Army Corps of Engineers and EPA definition of
wetlands.  

4.5 BIOLOGICAL RESOURCES

Native flora found in and around the site include small trees and shrubs, scrub growth, and grasses.  Small wild
animals, including groundhogs, rabbits, raccoons, skunks, mice, rats, and squirrels, are occasionally found on
the plant site.  There are some deer on recently acquired portions of the site.   

4.5.1 Threatened and Endangered Species

According to the Fish and Wildlife Service of the U.S. Department of Interior (Letter, Kroonmeyer 1991; see
Appendix B), the Mound Plant lies within the range of the Indiana Bat (Myotis sodalis), a federally listed
endangered species.  The bat has not been seen on-site.  Shagbark hickories (common to southwest Ohio) and
other live or dead trees with exfoliating bark may host the bat from May 1 through August 31.  However,
according to the Dayton Museum of Natural History, a field survey in April 1991 did not locate any shagbark
hickories on-site (Letter, Hissong 1991; see Appendix B).  During the time from May 1 through August 31,
preconstruction site inspections are conducted to assess whether any potential host trees are present.
During ecological assessment activities conducted under the CERCLA program at the Mound Plant, a single
specimen of Inland Rush (Juncas interior weig) was discovered growing on the Mound south property.  The
Inland Rush has been designated a state "endangered species" by the Ohio Division of Natural Areas and
Preserves.  Because a single specimen was found, it is not considered a viable breeding population.
According to existing records, no other rare or endangered species have been found at the proposed site or any
alternative site (Letters, Hillmer 1992 and Kroonmeyer 1992; see Appendix B).

4.6 HISTORICAL AND CULTURAL RESOURCES

No sites of historical or cultural interest were found on the plant grounds during investigations for the sitewide
Environmental Impact Statement (EIS) (DOE, 1979) or during an additional survey in 1987 which included
newly acquired areas (Riordan, 1987).  The State of Ohio Historic Preservation Office has noted that the Mound
Plant does not contain any properties listed or eligible for the National Register of Historic Places (Appendix
B).  

4.7 CURRENT MOUND EMISSIONS

According to the Regional Air Pollution Control Agency (RAPCA), Mound operations are in compliance with
state and federal air pollution regulations.  RAPCA has authority under the Clean Air Act (CAA) and both state
and local regulations.  RAPCA's jurisdiction includes six southwestern Ohio counties:  Montgomery, Clark,
Miamisburg, Darke, Preble, and Greene.  Discussions of Mound's atmospheric nonradioactive and radioactive
emissions are presented in the annual environmental monitoring reports (e.g., Farmer et al., 1991).
Based on Environmental Monitoring at Mound: 1990 Report (Farmer et al., 1991), the concentrations of
radionuclides from Mound were within DOE DCGs for the respective radionuclides (DCG for a radionuclide is
defined as the concentration of that radionuclide that will give a committed EDE of 100 mrem during continuous
exposure for one year).  The conditions of the National Pollution Discharge Elimination System (NPDES)
permit were met with the exception of four exceedances of biochemical oxygen demand (BOD).  
Current emissions into the environment summarized in Table 4.1, would be expected to continue under the
proposed action.  Although the emissions listed in Table 4.1 would not be expected to decrease significantly due
to the proposed action, the threat of an unplanned release of contamination would decrease.

Table 4.1.  Emission figures of certain radioactive and non radioactive materials discharged  in different           
      environmental media
         (Source:  Table E.1, Table 5.1, and Table 5.4 of Environmental Monitoring at Mound:  1990 Report)
                         Total amount               Total amount             
                         released in air            released in water        
 Material released       during the year 1990       during the year 19901   Concentration 
 Plutonium-238           1.8 X 10-5 Ci              6.7 X 10-4Ci            N.A. 
 Plutonium-239           1.5 X 10-7 Ci              3.5 X 10-6Ci            N.A. 
 Tritium                 1823 Ci                    4.9 Ci                  N.A. 
 Uranium-                2.9 X 10-8 Ci              4.5 X 10-4Ci            N.A. 
233,      -234
 Uranium-238             8.6 X 10-8 Ci              Not available           N.A. 
 Sulfur oxides           0.001 lbs/106 BTU input2   N.A.                    N.A. 
 Organics                803 lbs2                   N.A.                    N.A. 
 Particulates            0.005 lbs/106 BTU input2   N.A.                    N.A. 
 Oil and grease          N.A.                       <1.2 kg3                <1 mg/L 
 Ammonia as N            N.A.                       1.3 kg3                 1.14 mg/L 
 Cadmium                 N.A.                       1.28 g3                 11 ug/L 
 Chromium                N.A                        58 g3                   <50 ug/L 
 Copper                  N.A                        109 g3                  94 ug/L 
 Nickel                  N.A                        1.28 g3                 50 ug/L 
 Zinc                    N.A.                       63.83 g3                55 ug/L 
 Lead                    N.A.                       58 g3                   50 ug/L
 Mercury                 N.A.                       2.3 g3                  <2 ug/L
Notes:  
1     Mound discharged approximately 307 million gallons of water in 1990 to the Great Miami River.  (The
      average monthly discharge is approximately 26 million gallons of water to the Great Miami River. Data
      from the U.S. Geological Survey show that flow in the Great Miami River at Miamisburg in 1990
      averaged 65.340 billion gallons per month.    
2     Within standards set by Ohio EPA Air Pollution Regulations 3745-17-10, 3745-18-06, and 3745-21-07.
3     The total amount released is calculated using the concentration of release of material per month and the
      volume of water discharged from Mound in 1990 to the Great Miami River.   

5.0 ENVIRONMENTAL IMPACTS

5.1 IMPACT ASSESSMENT APPROACH

Mound conducts D&D work to minimize emissions, as described in Sections 3.3 and 3.4.  Thus, no exact
amount of expected release can be specified, only that any release would remain within certain upper-bound
concentrations determined by monitoring.  In many cases emissions remain too low to measure.  The low value
of total releases due to D&D activities, reported in Table 3.4, are attributable to these practices.  The
environmental impact discussions below are based upon the upper-bound approach and backed up by the releases
from D&D activities in the past, which remained below 1% of the DOE DCG.  Impacts are summarized in
Section 5.11.

5.2 AIR QUALITY AND NOISE

The only impacts of the proposed action on air quality would be the minor dispersal of radioactive and
nonradioactive particulates, and the emission of hydrocarbons and carbon monoxide from the combustion of
gasoline and diesel fuel.  Emissions are expected to be small based upon past experience (summarized in Table
3.4).  Although the quantities of airborne contamination cannot be estimated, standardized monitoring and
mitigation controls as described in Sections 3.3 and 3.4  would be used to prevent any airborne releases greater
than the allowable limits specified in DOE Order 5400.5.  Radioactivity releases to air would be controlled to
ALARA.

5.2.1 Soil Excavations

During excavation of contaminated soils, all personnel within the work area would be protected from airborne
emissions by use of full-face respirators and other protective clothing or equipment where required by Mound
Health Physics Operations.  Constant air monitoring would provide a warning of release and help ensure that
excavation activities do not cause releases in excess of DOE Order 5400.5 guidelines from the construction site
or the Mound Plant boundary.  
Some exhaust from the burning of vehicle and equipment fuel would be released.  Emissions containing
unburned hydrocarbons and carbon monoxide, both considered pollutants, would be minimized by keeping all
equipment maintained to manufacturer's specifications.  Small numbers of vehicles and equipment would be
used.

5.2.2 Building Decontamination

Releases of airborne contamination to the environment during building D&D would be prevented through the
use of at least two levels of HEPA filtration (see Section 3.4).  Personnel would be protected through use of
appropriate construction techniques, and protective equipment and clothing, as described in Sections 3.3 and 3.4
and as required by Mound Health Physics Operations.

5.2.3 Noise

Noise would be limited to that produced by the routine use of earthmoving or metal-cutting equipment.  EPA
and OSHA limits will be observed.  The loudest D&D operation that would be undertaken for any length of
time is the excavation of contaminated soil with a track hoe.  This operation generates 94.4 dB, 20 feet away
from the track hoe.  The day-long average noise exposure level is approximately 80 dB, meeting OSHA
requirements.
Based upon the maximum sound level during excavation, the loudest noise at the Mound fence line would be
14.3 dB during operations at Building 21.                   

5.3 WATER QUALITY

The overall impact of the proposed action on surface and ground waters would be positive through the removal
of contaminated soil.  Fewer radioactive and nonradioactive suspended particles would be eroded from the
Mound Site.  This would result in less contamination of the BVA from stormwater runoff and incident
precipitation infiltration.
Possible negative impacts from the proposed action are temporary and would occur only during D&D
operations.  Radioactive and nonradioactive suspended solids in stormwater runoff may rise briefly during
excavation. This possibility is mitigated by routine stabilization techniques and sediment-control systems. The
amount of increase, if any, would be minor, and normal plant sediment-control systems are capable of handling
the resulting sediment along with normal sediment load.  Stormwater runoff would comply with the existing
NPDES Permit No. 1IO00005*ED.
If no action is taken, minor emissions of radioactive contaminants to surface and ground waters would continue
and the long-term spread of contamination from contaminated soil areas may occur.

5.4 WORKER AND PUBLIC HEALTH IMPACTS

Based on the procedures described in Sections 3.3 through 3.6, and Mound's experience with similar
decontamination projects, worker and public health exposures would be well within DOE limits and health
effects would be expected to be very small.

5.5 IMPACTS FROM ROUTINE TRANSPORTATION

Because of the nature of the waste being transported, and because of the protection provided by the waste
packaging and truck shielding, external radiation fields would be low, and therefore, exposure of the public and
workers (e.g. drivers) to radiation under incident-free conditions and health impacts from such exposure would
be very small.

5.6 LAND

5.6.1 Topography and Wetlands

The proposed actions involve some land disturbance but the proposed actions are not located in floodplains or
wetlands.  No permanent negative impacts on the topography or physiography of Mound or vicinity are
expected, although temporary disturbances are required by the proposed action.  No part of the proposed action
would impact wetlands or floodplains.  The no-action alternative would have no impact.  

5.6.2 Soils

There are no significant soil or mineral resources at Mound or in the immediate vicinity.  However, the
contaminated soils at Mound generate continuing emissions of radioactive particles from the site, as previously
described.  The proposed action is in part directed at greatly reducing the chance of contamination spreading to
additional soil, a positive impact.  The no-action alternative would result in gradually increasing areas of soil
contamination.  In addition, the proposed action would aid in compliance with environmental regulations on
erosion and sediment control.  Temporary impacts on soils would be controlled by erosion-control and re-
vegetation measures described in Section 3.4. 

5.6.3 Archaeological, Historical, and Cultural Resources

Because no sites of historical or cultural significance exist anywhere on the Mound Plant property, neither the
proposed action nor the alternatives pose a threat to any archaeological, historical, or cultural resources (see
Appendix B). 

5.6.4 Land Use Patterns

The proposed action and alternatives take place entirely on the Mound site and would not change any local land-
use patterns or affect any recreational resources.  Ultimately, land now occupied by Mound must be
decontaminated prior to release.

5.6.5 Waste Disposal

The wastes of concern are low-level radioactive wastes, TRU wastes, and mixed radioactive and hazardous
wastes that may be generated.  It is estimated that 943,000 ft3 of low-level waste would have to be disposed of
in land committed to this general purpose as a result of the proposed action.
Approximately 660 ft3 of TRU waste would be packaged and held at the site.  Also held at the plant would be 2
liters of liquid mixed waste (tritiated mercury).  Uncontaminated solid and asbestos waste, after proper
monitoring, would be disposed of according to Mound Plant guidelines.  This presents no more hazard than
routine disposal of municipal waste and construction debris.  Further details are provided in Sections 3.7 and
3.8.  The amounts of waste generated are summarized in Table 3.3.
If no action is taken, contaminants would continue to slowly spread, steadily increasing the amount of
contaminated material eventually requiring disposal.  Contaminated soil is expensive to remediate and remaining
contaminated soil limits the use of the land, a potentially significant impact in a growing urban area.

5.7 ECOLOGY

5.7.1 Wildlife and Threatened and Endangered Species

The proposed action would disturb only non-unique and largely disturbed habitats.  The Proposed Action and
Alternatives would not be expected to have any affect on threatened or endangered species in the area of the
Mound Plant.  Such species, other than the single specimen of Inland Rush, (Juncas interior weig) are not
observed on the plant site, nor are they likely to be be dependent on the site for food and habitat due to the
commercial and residential development surrounding the plant.  A foreseeable impact to wildlife from the
proposed action would be positive, in that radioactive emissions would be reduced.  The no-action or deferred-
action alternatives would not disturb any habitat, but would allow current emissions to continue.

5.7.2 Vegetation

The proposed actions would not disturb any unique areas of natural vegetation or impact any field crops. 
Pesticides and herbicides would be used as required to control weeds and insects during decontamination
activities.  None of the pesticides and herbicides to be used are regulated under the Federal Insecticide,
Fungicide, and Rodenticide Act (FIFRA).  None are expected to have any significant impact upon the
environment, the public, or D&D workers. 

5.7.3 Aquatic Resources

The potential short-term impacts of the proposed action would be mitigated through the use of contamination-
control techniques within buildings (Section 3.3) and through particulate and sediment control techniques during
building demolition and soil excavation (Section 3.4).  The conditions of the current NPDES permit would be
met.  The long-term impact would be to reduce the amount of radioactive sediment released into the aquatic
environment.  Fish, shellfish, waterfowl, and aquatic plants would be protected by the proposed actions through
source reduction, a positive impact.  

5.8 HUMAN AND ECONOMIC ASPECTS

The Mound Plant is one of the main employers in Miamisburg.  The proposed action will provide employment
for those workers engaged in the D&D activities.  
There would be a small temporary increase in truck traffic from Mound to the major highways serving
Miamisburg.  Only a few additional trucks would leave the site each day.  The plant site is bound by Mound
Road on the east and Benner Road on the south.  The Mound Road traffic flow totals approximately 4,000
vehicles per day and the Benner Road traffic flow totals approximately 3,000 vehicles per day. The total number
of shipments anticipated is extremely low compared to this traffic volume.  

5.9 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES

The proposed projects would require the use of natural resources such as vehicle fuel and electric power, but
the quantities involved are small.  The land involved in the action is already in use by Mound.  Radioactive
waste that may be generated during excavation would be disposed of in land dedicated to that general purpose at
the NTS.  Nonradioactive waste would be disposed of in local municipal landfills dedicated to waste disposal. 
No other irreversible or irretrievable commitments exist as a result of the proposed actions.

5.10 ACCIDENT RISKS

5.10.1 Impacts from Potential Accidents

The impacts of potential accidents during D&D projects are limited to standard industrial hazards and the
possibility of the release of and exposure to radioactive materials.  The radiological hazards associated with
these projects are bounded by the accidental releases and subsequent exposures analyzed in existing documents,
including the EIS (DOE, 1979) and a variety of safety analysis reports and safety assessment documents [e.g.,
for the SW Building (Mound, 1992) and WD Building (Mound, 1978)].  These documents describe "maximum
credible" (i.e. reasonably foreseeable) accident scenarios that could involve far greater operational amounts of
radioactive materials than are expected to be present during the proposed D&D activities, providing a
conservative bounding case.  For example, the EIS postulated a fire in a plutonium facility, which released 16
Ci of Pu-238, giving a 15-rem total lifetime lung commitment, and a tritium release giving a dose of less than
0.1 rem to the maximally exposed individual.   Based on the risk conversion factor of 4x10-4 latent cancer
fatalities per rem of effective dose equivalent (Nuclear Regulatory Commission, Preamble to Standards for
Protection Against Radiation, 56 FR 23363, May 21, 1991) which presents an overly cautious view of the risk
from an exposure to only the lung, these exposures would be highly unlikely to result in any adverse health
effects.
The maximum release of tritium and Pu-238 during an accident related to the D&D Project is expected to be
substantially less than the quantities released during the above postulated accidents, as discussed below:
               A. Soil D&D:
                The greatest reasonably foreseeable accident that could occur in a D&D Soils project is the falling of
            an unsealed waste container from a forklift.  This accident would result in the release of radioactive
            contaminants to the environment and is described below: 
                After a waste container has been filled with contaminated soil, the lid is placed on the container
            without the sealing (locking) mechanisms in place.  The container is picked up by forklift and moved
            to an area, still within the Radiation Control Zone, for weighing and sampling.  During the move, it
            is postulated that a set of conditions could exist that would cause the waste container to fall from the
            grasp of the forklift to the ground, with most of (if not all) its contents leaving the confines of the
            container.  The accident would generate an airborne release of radioactively contaminated soil
            particulates.
                Before mitigating measures (see Section 3.4.1) are applied by the workforce, it is assumed that
            approximately 1 part in 1,000,000 parts (1 ppm) (Draft Safety Evaluation, Decontamination, and
            Decommissioning Activities, Special Metallurgical Building and Soils, April 23, 1992) of the
            container's contents becomes airborne and is available for inhalation uptake by workers and
            members of the public.  Since the accident would occur in the Radiation Control Zone, the
            workforce would be appropriately protected (see Section 3.5) and therefore would not be exposed. 
            It is assumed for this exercise that the off-site receptor is 200 m downwind from the accident and
            that it will take 4 hours before emissions are brought under control.
                Table 3.2 indicates that the Building 21 Project is made up of soil uniformly contaminated with up to
            296 Ci Pu-238.  Since the project involves 267,800 ft3 of waste (Table 3.3) approximately 2,678
            waste containers will be required, with each containing soil with up to 0.111 Ci Pu-238.  Therefore,
            from wind resuspension (Draft Safety Evaluation D&D Activities, Special Metallurgical Building and
            Soils, April 23, 1992), a dose of 0.03 mrem would be received by an off-site maximally exposed
            member of the public.
                DOE Order 5400.5, Radiation Protection to the Public and the Environment, limits public exposure
            to 100 mrem/year and 40 CFR 61, Subpart H (EPA 1991) limits public exposure to 10 mrem/year.
                A Mound project that was started in 1982 and completed in 1991, the Waste Transfer System (WTS)
            D&D Project, was very similar to the proposed Building 21 project.  During the 10 years of the
            WTS activities, over 5,000 waste containers were involved.  No incident occurred that involved an
            unsealed, filled waste container falling from the grasp of a forklift with the contents leaving the
            waste container.
               B. Building D&D
                Tritium
                There are many reasonably foreseeable accidents that potentially could occur during the D&D of the
            tritium areas of the SW Building.  The results of these incidents are described below for both a
            release to the atmosphere that would result in an off-site dose and release within a laboratory
            occupied by a D&D worker.  The frequency of such a release has been determined to be 1 x 10-5
            (Mound Facility Risk Review October 1991, JBF Associates, Inc.).
                Because of the SW Building exhaust system design, some amount of gaseous tritium or tritium oxide
            release to a room would be exhausted to the atmosphere.  Since tritium is lighter than air, the
            buoyant plume would not intersect the ground and would rapidly disperse in the atmosphere.  The
            buoyancy of the plume could be increased further if its temperature were greater than the outside air
            temperature.  Conversion of tritium to tritium oxide after release from a stack could result in some
            fallout of tritium oxide.  However, at a conversion rate of 20% per day, the release of tritium would
            be well dispersed before significant quantities of tritium oxide could be formed.  Extreme
            meteorological conditions, such as a low inversion layer, calm winds, and rain, might increase the
            conversion of tritium to tritium oxide and increase local fallout of tritium oxide.
                From an accident release scenario described in the Final Safety Analysis Report (FSAR) for the SW/R
            tritium Complex (February 4, 1992), the 30 Ci estimated to be in the SW D&D Project (Table 3.2)
            would result in a maximum  airborne radionuclide concentration of tritium oxide approximately 0.3
            KM (a 0.3KM radius from the stack includes areas both on-site and off-site) from the stack. An
            individual inhaling this airborne contamination for 2 hours would receive a dose of 0.03 mrem.  This
            exposure is below both DOE Order 5400.5 limit of 0.1 rem/year and 40 CFR 61 limit of
            0.01 rem/year for airborne releases.  The dose to an individual at any other distance from the stack
            would be less than 0.03 mrem.
                It can also be seen from the FSAR for the SW/R Complex that if the estimated 30 Ci in the SW
            Building D&D Project were accidentally released into the typical building laboratory, and both the
            room exhaust system and tritium detection system failed, the dose would be 0.02 mrem for an
            individual working in the room for 8 hours.
                Plutonium
                The most severe reasonably foreseeable accident is assumed to occur in the R-140 project, which
            contains the greatest quantity of Pu-238, due to a breach of a temporary enclosure's containment and
            area filtration.  The building's HEPA filtration system is assumed to continue to function.
                The R-140 project contains an inventory of approximately 0.9 Ci Pu-238 (Table 3.2).  From the
            Safety Assessment Document, WD (Waste Disposal) Building, October 31, 1978, Monsanto Research
            Corporation, Mound Facility, it can be shown that the accident scenario described above would
            result in a dose of less than 0.003 rem to an off-site maximally exposed member of the public.  
                The scenario for the exposed D&D worker to Pu-238 is that one of the gloveboxes experiences a
            breach of containment and releases 10% of its activity to the R-140 laboratory.  It is assumed that
            the worker is wearing a supplied air respirator and exits the laboratory in one minute.  The worker
            would receive a 50-year dose commitment to the bone of 6.1 rem.  This dose is below the DOE
            Order 5480.11 limits of 50 rem for occupational workers.
                As described in Section 3.3 and 3.6, the D&D work would be performed in rooms, enclosures, etc.,
            that are protected by High Efficiency Particulate Air (HEPA) filtered ventilation systems, maintained
            under negative pressure.  The rooms and enclosures are also maintained under negative pressure
            precluding the escape of particulates.  These protective measures for the D&D workers will be
            augmented by the use of respirators and other personnel protection equipment.
                Failure of a HEPA filter would result in minimal release of contaminants, since the area would still
            be maintained under negative atmospheric pressure and redundant HEPA filters are arranged in
            series, providing back-up in the event of filter failure.
                Should there be a general power failure the, primary building HEPA filtration systems are connected
            to an emergency back-up power system.

5.10.2 Transportation of Radioactive Materials

There is a potential for non-radiological injury or death as a result of a truck accident.  Possible truck accident
scenarios might involve personal injury and property damage from the transport vehicle collision, fire or
explosion.
The proposed D&D activities would result in an estimated 2,141 shipments to the NTS, a total of 6,926,135
kilometers of travel during a four year period.  To assess accident potential, the most likely transport route was
divided into segments which were then assigned one of three population densities; rural, suburban, and urban. 
The percent of travel, accident rate, and potential accidents for each segment are shown below:
Population                                                  Percent1                   Accident2               Potential3 
Zone                                                        of Travel                  Rate/km                 Accidents 
 Rural                                                      77.7%                      1.37 x 10-7             .73 
 Suburban                                                   20.9%                      3.00 x 10-6             4.34 
 Urban                                                      1.4%                       1.60 x 10-5             1.55
1.    INTERSTAT Analysis, TRANSNET System, Sandia National Laboratories, September 22, 1992.
2.    "The Impacts of Transportation Within the United States of Spent Reactor Fuel from Domestic and
      Foreign Research Reactors", SAND88, TTC-0794, UC-603, J. W. Cashwell, R.E. Luna, K.S.
      Neuhauser, January, 1990.  NOTE:  THIS REFERENCE WAS USED ONLY FOR ESTABLISHING
      ACCIDENT RATES.
3.    Based on number of kilometers traveled in each zone.
The accident rates shown above only reflect probability; considering Mound's shipping history it is likely there
would be no accidents.  Mound has previously transported waste over 4,581,547 kilometers (2,847,450 miles)
with only two minor incidents.  In addition, these potential accidents rates do not consider accident severity. 
Minor incidents such as tire failure or incidents resulting in no property damage could be considered as
accidents.
The greatest credible accident considered with radiological impacts was a semi-trailer truck carrying five boxes
of Pu-238 contaminated soil overturning and dumping the contents of the boxes onto the roadway.  A fraction of
the soil becomes airborne and is inhaled by the driver for two hours before he is removed from the scene.  The
driver wears no protective equipment and all the suspended dust is inhaled. The maximum committed dose
equivalent was determined to be a reasonable estimate for this scenario (Refer to Appendix A) is 9 mrem.  This
estimate is based on conservative estimates of the soil resuspension factor and the expected levels of soil
contamination presented in Table 3.2.
Based on a risk conversion factor of 4x10-4 latent cancer fatalities per rem of effective dose equivalent (Nuclear
Regulatory Commission, Preamble to Standards for Protection Against Radiation, 56 FR 23363, May 21, 1991)
which presents an overly cautious view of the risk from an exposure to only the lung, these exposures would be
highly unlikely to result in any adverse health effects.
In the event the accident described above occurs, the general public would receive a committed effective dose
equivalent considerably less than the driver due to dispersion by wind, dilution by rain as well as distance from
the accident.  The health risks would also decrease due to the above factors.

5.10.3 Potential Impacts from Natural Hazards

The potential impacts from natural hazards during D&D projects are limited to the possibility of the release of
and exposure to radioactive materials.  The radiological hazards associated with these projects are bounded by
the accidental releases and subsequent exposures analyzed in the EIS and safety documents cited previously. 
The EIS analysis addresses both tornado and earthquake impacts.  For a moderate tornado and a design basis
earthquake, the EIS estimated 0.1 to 10.0 g of plutonium would be released off-site.  The analyses of the SW/R
complex concluded that no scenario involving natural phenomena was found to result in a hazardous material
release.  D&D would act to reduce the risks of the public receiving exposure.  The above analyses indicate that
a release due to natural events would have only minor effects.  The maximum amount of radiological materials
available for release through natural hazards in this proposed action is expected to be less than the quantities
addressed in the above analyses (because the EIS analysis considered the entire Mound plant); therefore, the
impacts would be less.  The potential impacts would be the same under all alternatives.

5.10.4 Risk Comparison

The maximum total amount of radioactive and hazardous material that could be released into the environment
during D&D operations is identical to the amounts currently in the buildings and soil areas.  D&D operations
would temporarily make contaminants more available for dispersion by excavation, opening up contaminated
equipment, and disaggregation of the surfaces of the floors and walls.  During the time that debris and rubble
from D&D activities are present before packaging, accidents or natural calamities could disperse these
materials.  Because D&D would proceed through each project over several years, only a small portion of the
total radioactive material would be available for mobilization at any one time.  The potential risk from an
accident that disperses all radioactive material present is identical for all alternatives, including the no-action
alternative.  The risk following the proposed action would be reduced proportionally to the amount of
radioactive material removed.  

5.11 LONG-TERM IMPACTS

The cumulative and long-term impacts of the proposed action include positive effects brought about by the
removal, consolidation, and appropriate disposal of radioactively contaminated materials.  The primary
beneficial impact of the proposed action is the reduction in the amount of radioactively contaminated sediment
released off-site through stormwater runoff.  While the current releases from the site are within regulatory
guidelines, removal of the source of contamination would further reduce both emissions and the chance of an
exceptional rainfall event eroding large quantities of contaminated soil.
In the short term, D&D operations could possibly increase the potential release of contaminants to the
environment.  Specifically, soil removal activities could result in release of contaminants to the air and
stormwater runoff.  Monitoring and mitigation controls described in Section 3.4 would be in effect throughout
the D&D operations to ensure that the short term potential increases in released contaminants would be
minimized and kept in compliance with regulatory guidelines.
The no-action and deferred-action alternatives would allow continued low-level releases of contaminated
sediment and present the possibility of larger releases through exceptional rainfall events, although such releases
would be expected to remain within regulatory and permit guidelines.

6.0 REFERENCES CITED

Mound Technical Manuals:
MD-10019, Nuclear Radiation Safety, 1991.
MD-10203, Mound WIPP Certification, Program for Newly Generated Contact Handled (CH) Transuranic
Waste, 1991.
MD-10246, Issue 2, On-site Transportation of Hazardous Materials, 1988.
MD-10286, Issue 9, Mound Safety and Hygiene Manual, 1992.
MD-70180, Mound Radioactive Liquid Waste Disposal, 1988.
MD-70204, Issue 5, Low-Level Radioactive Waste Management, 1989.
MD-70205, TRU Waste Management System, 1988.
MD-70523, Nonradioactive Hazardous, Radioactive Mixed, Toxic, and Solid Waste Management, 1991.
DOE Orders:
DOE Order 5400.5, Radiation Protection of the Public and the Environment, 1990.
DOE Order 5480.11, Radiation Protection for Occupational Workers, 1988.
DOE Order 5820.2A, Radioactive Waste Management, 1988.
Other References:
Farmer, B. M., et al., Environmental Monitoring at Mound:  1990 Report, MLM-3703, 1991.
Kennedy, D. P. et al., UCRL-15910, Design and Evaluation Guidelines for Department of Energy Facilities
Subjected to Natural Phenomena Hazards, 1990.
Mound, 1978.  Safety Assessment Document of the Waste Disposal (WD) Building.  Monsanto Research
Corporation.
Mound, 1992.  Final Safety Analysis Report for the SW/R Tritium Complex.  
Riordan, R. V., An Archaeological Survey of Portions of the Mound Facility, Montgomery County, Ohio, Public
Archaeology Report No. 18, Laboratory of Anthropology, Wright State University, Dayton, Ohio, 1987.
Stought, R. L.; Edling, D. A.; and Draper, D. G.; The Mound Site Survey Project for the Characterization of
Radioactive Materials in Site Soils, MLM-3517, UC-702, Mound, 1988. 
J.B.F. Associates, Inc., Mound Facility Risk Review, October 1991.
U.S. Department of Agriculture, Soil Survey of Montgomery County, Ohio, June 1976, 1976.
U.S. Department of Energy, Albuquerque Operations Office, Comprehensive Environmental Assessment and
Response Program, Phase I:  Installation Assessment, Mound (Draft), 1986.
U.S. Department of Energy, Coordinated ANSPD(NE), and OMA Decontamination and Decommissioning
Program Plan, 1978, Revised December 23, 1986.
U.S. Department of Energy, Final Environmental Impact Statement for Mound Facility, DOE/EIS-0014, UC-2
11, 1979.
U.S. Department of Energy, Memorandum of Understanding between the Office of Military Applications (OMA)
and the Office of Terminal Waste Disposal and Remedial Action (NE-20) for the Coordinated Decommissioning
of Inactive Advanced Nuclear Systems and Products Division (ANSPD) and OMA Areas at the Mound Facility,
1982.
U.S. Department of Energy, Waste Acceptance Criteria for the Waste Isolation Pilot Plant, DOE/WIPP-069,
Revision 4-UC70, 1991.
U.S. Department of Energy, Nevada Operations Office and Reynolds Electrical and Engineering Co., Inc.,
Nevada Test Site Defense Waste Acceptance Criteria, Certification, and Transfer Requirement, NVO-325, 1988.
U.S. Nuclear Regulatory Commission, Preamble to Standards for Protection Against Radiation, 56 Federal
Register 23363, May 21, 1991.
Operable Unit 9, Hydrogeologic Investigation:  Wetlands Determination Report, Mound Plant, U.S. Department
of Energy, Albuquerque Operations Office, 1/94.
Operable Unit 9, Ecological Characterization Report, U.S. Department of Energy, Albuquerque Operations
Office, 3/94.

7.0 LIST OF AGENCIES CONSULTED

DAYTON MUSEUM OF NATURAL HISTORY (endangered species)
Mr. Thomas R. Hissong, Curator of Education
April, 1991
UNITED STATES DEPARTMENT OF THE INTERIOR, FISH & WILDLIFE (endangered species)
Mr. Kent E. Kroonemeyer, Supervisor
April, 1991 and June, 1992
OHIO HISTORIC PRESERVATION OFFICE (historic properties)
Ms. Martha J. Raymond, Department Head
April, 1992
OHIO HISTORIC PRESERVATION OFFICE (archaeological)
Ms. Judith Kitchen, Department Head
March, 1991
OHIO DEPARTMENT OF NATURAL RESOURCES (state scenic rivers)
Mr. Stuart Lewis, Administrator, Ohio Scenic Rivers Program
OHIO DEPARTMENT OF NATURAL RESOURCES
Ms. Jennifer Hillmer, Ecological Analyst
Division of Natural Areas and Preserves
NOTE:  See Appendix B for copies of correspondence from the above agencies.

APPENDIX A
RADIOLOGICAL IMPACT OF TRANSPORTATION ACCIDENT INVOLVING SPILL OF PU-238 CONTAMINATED SOIL ONTO THE ROAD

EVALUATION

Four parameters were used to compute a 50 year committed effective dose equivalent as a result of inhalation by
the driver.  A reasonable range of values was determined for each of the parameters and input into a Latin
hypercube program.  The output is in the form of a percentile versus the inhalation dose for that percentile.

COMPUTATION

Resuspension Factor (g/m3):  Triangular Distribution with ranges:
            Minimum           1.00E-4
            Likeliest         2.50E-4                                                              
            Maximum           1.00E-3
Selected range is from 1.00E-4 to 1.00E-3 with mean value in simulation of 4.50E-4.  (A Manual for
Implementing Residual Radioactivity Material Guidelines, A supplement to U.S. Department of Energy
Guidelines for Residual Radioactive Material at Formerly Utilized Sites Remedial Action Program and Surplus
Facilities Management Program Sites), June 1989.
Soil Concentration, pCi/g:  Triangular Distribution with ranges:
            Minimum           1.00E+3
            Likeliest         1.00E+4
            Maximum           4.00E+4
Selected range is from 1.00E+3 to 4.00E+4 with a mean value of 1.7E+4.  (Table 3.2)
Dose Conversion Factor, mrem/pCi:  Normal Distribution with ranges:
            Mean              3.00E-1
            Stand. Dev.       3.00E-5
Reference:  United States Department of Energy, (Internal Dose Conversion Factors for Calculation of Dose to
the Public), 7/88.
The formula used in the calculation was:
(Resuspension Factor) X (Soil Concentration) X (Breathing Rate) X (Dose Conversion Factor) = Committed
Effective Dose Equivalent
Where:  Breathing rate = 0.025 m3/min.

RESULTS

The entire range of doses calculated was from 0 to 18 mrem.  After 1000 trials, the standard error of the mean
is 0.08.
Note:  Calculated using Crystal Ball SoftwareR.
Percentiles for entire range (mrem)
PERCENTILE(%)           INHALATION DOSE
0                             0
5                             1
10                            1
15                            1
20                            2
25                            2
30                            2
35                            2
40                            3
45                            3
50                            3
55                            3
60                            4
65                            4
70                            5
75                            5
80                            6
85                            6
90                            7
95                            9
100                           18
To obtain the maximum committed effective dose equivalent the 95% percentile was chosen as a reasonable
estimate for this scenario as there is only a small probability of the dose being in 95% to 100% percentile. 
Therefore, the maximum committed effective dose equivalent due to 2 hours of breathing Pu-238 contaminated
dust is 9 mrem.

APPENDIX B
LETTERS OF CORRESPONDENCE WITH FEDERAL, STATE AND LOCAL AGENCIES


        Ohio Historic Preservation Office
        Ohio Historical Center
        1982 Velma Avenue
        Columbus, Ohio 43211-2497
        (614) 297-2470
                                                                OHIO
                                                                HISTORICAL
                                                                SOCIETY
                                                                SINCE 1885
                                                        March 15, 1991
            Mark D. Gilliat
            EG&G Mound Applied Technologies
            P.O. Box 3000
            Miamisburg, Ohio 45343-0987
            Dear Mr. Gilliat:
            Re: Mound Facility, Miamisburg, Ohio
            This is in response to your letter dated February 21, 1991 concerning the
            Miamisburg facility.  Based on the field survey and examination of the Mound
            Facility undertaken by Dr. Robert Riordan, Wright State University, in 1987
            it appears that there are no significant archaeological remains on the Mound
            Facility due to previous disturbance.  No archaeological sites eligible for
            the National Register will be affected.  Please note that the buildings
            comprising the facility have not been evaluated in regard to National Register
            criteria.  In order to do this we must have photographs of the buildings,
            their ages, and a brief history of the facility.
            Any questions concerning this matter should be addressed to Julie Quinlan at
            (614) 297-2470.  Her hours are from 5-11 a.m.  Thank you for your cooperation.
                                                         Sincerely,
                                                         Judith Kitchen, Department Head
                                                         Technical and Review Services

                            United States Department of the Interior
                                    FISH AND WILDLIFE SERVICE
                                   Reynoldsburg Field Office
                                   6950-H Americana Parkway
                                   Reynoldsburg, Ohio 43068-4115
                                        (614) 469-6923
        Mr. Mark D. Gilliat
        EG&G Mound Applied Technologies
        P. O. Box 3000
        Miamisburg, OH  45343-0987
       Dear Mr. Gilliat:
       This responds to your April 4, 1991 telephone conversation with Ken Multerer of
       my staff regarding the construction of roadways at your facility.  As you
       stated, roadways are being constructed in some new growth wooded areas on your
       property.  This wooded area may contain some trees which may provide potential
       habitat for the Indiana bat.
       These comments are provided under the authority of the Endangered Species Act
       of 1973, as amended.
       ENDANGERED SPECIES COMMENTS:  The proposed project lies within the range of the
       Indiana bat, a Federally listed endangered species.  Summer habitat
       requirements for the species are not well defined but the following are thought
       to be of importance:
       1.  Dead trees and snags along riparian corridors especially those with
           exfoliating bark which may be used as maternity roost areas.
       2.  Live trees (such as shagbark hickory) which have exfoliating bark.
       3.  Stream corridors, riparian areas, and nearby woodlots which provide forage
           sites.
       Considering the above items, we recommend that if trees with exfoliating bark
       (which could be potential roost trees) are encountered along the proposed
       right-of-way, they not be cut between May 1 and August 31.
       If  the above recommendations are incorporated into the project, this precludes
       the need for further action on this project as required by the 1973 Endangered
       Species Act, as amended.  Should the project be modified or new information
       become available that indicates listed or proposed species may be affected,
       consultation/conferring, as appropriate, should be initiated.
       If the above described time restriction is unacceptable, mist netting will need
       to be done to determine whether Indiana bats are actually present.  If they are
       found to be present, specific recommendations will need to be made at that
       time.
                                                          Sincerely,
                                                          Kent E. Kroonemeyer
                                                          Supervisor
       cc:  Chief, Ohio Division of Wildlife, Columbus, OH
       ODNR, Outdoor Recreation Service, Attn: N. Colvin, Columbus, OH
       Ohio EPA, Water Quality Monitoring, (L. Nerchant), Columbus, OH
       U.S. EPA, Office of Environmental Review, Chicago, IL

                                              Dayton Museum of Natural History
                                              2629 Ridge Avenue
                                              Dayton, Ohio 45414
                                              Phone (513)275-7431
                                                          April 25, 1991
         Mr. Mark Gilliat
         EG&G Mound Applied Technologies
         P.O. Box 3000 - Mound Road  Bldg. 69
         Miamisburg, Ohio  45343 - 3000
         Mr. Mark Gilliat:
         I hope that my visit to the EG&G Mound Applied Technologies facil-
         ity on Friday - April 12, 1991 was beneficial to your efforts in
         identifying and protecting any Shagbark Hickory (Carya ovata)
         trees on your site that might provide protective cover for the
         endangered indiana Myotis (Myotis sodalis) bat.  I commend your
         company for their concerns in the protection of our endangered
         wildlife.
         After walking the EG&G Mound site to examine several woodlots, we
         found that the vast majority of trees on location are second
         growth hardwoods including: Eastern Cottonwood - Populus del-
         toides, Box Elder - Acer negundo, Wild Black Cherry - Prunus
         serotina, Ash sps., Elm sps. and others.  Also various honeysuckle
         species were found throughout the understory.  Shagbark Hickory
         (Carya ovata) was not found to be present in any of the wooded
         areas examined on the EG&G Mound site.
         I found the morning to be very productive in providing you with an
         opportunity to better understand the vegetational cover at the
         EG&G Mound site.  It was my pleasure to show you a Shagbark Hick-
         ory (Carya ovata) tree growing in a local park so that you could
         become familiar with the identification of this species.  I am
         sure that you will now be able to identify any Shagbark Hickory
         (Carya ovata) that you migbt encounter in the future at the EG&G
         Mound site.
         If I can ever be of further help to you please contact me any
         time.
         Sincerely yours,
         Thomas R. Hissong
         Curator of Education

                              United States Department of the Interior
                                  Fish and Wildlife Service
                                  Reynoldsburg Field Office
                                  6950-H Americana Parkway
                                Reynoldsburg Ohio 43068-4115
             In Reply Refer to:   (614) 469-6923/FAX (614) 469-6919
                                       June 16, 1992
               Mr. Mark Gilliat
               EG&G
               Mound Applied Technologies
               P.O. Box 3000
               Miamisburg, Ohio  45343-3000
               Dear Mr. Gilliat:
               Per our telephone conversation on June 15, 1992, regarding
               endangered and threatened species, I wish to inform you that the
               only Federally listed species in Montgomery county is the Indiana
               bat.
               These comments are provided under the authority of the Endangered
               Species Act of 1973, as amended.
                                                         Sincerely,
                                                         Kent Kroonemeyer
                                                         Supervisor

 Ohio Historic Preservation Office
 Ohio Historical Center
 l982 Velma Avenue
 Columbus, Ohio 43211-2497
 614/297-2470
 Fax:  614/297-2411
                                                          OHIO
                                                          HISTORICAL
                                                          SOCIETY
                                                          SINCE 1885
                                     April 10, 1992
      Mark D. Gilliat
      EG&G Mound Applied Technologies
      P.O. Box 3000
      Miamisburg, Ohio  45343-3000
      Dear Mr. Gilliat:
            Re: Decontamination/Demolition. Miamisburg, Ohio
            Neutron Radiography Facility, Building 21, SD Building
      This is in response to your letter dated March 19, 1992 concerning the
      proposed work.  These comments are submitted in accordance to the provisions
      of the Section 106 of the National Historic Preservation Act of 1966, as
      amended (36 CFR 800).  Based on the information you provided it is my opinion
      that the project will have no effect upon any properties listed or eligible
      for the National Register of Historic Places.  No further coordination is
      required unless the scope of the undertaking changes.  if historic properties
      are accidentally discovered this office should be notified.
      Please contact Julie Quinlan at the above number if you have any questions.
      Her hours are tram 5-11 a.m.  Thank you tor your cooperation.
                                     Sincerely,
                                     Martha J. Raymond, Department Head
                                     Technical and Review Services
      MJR/JAQ:jq

                                                                   George V. Voinovich * Governor
                                                                   Frances B. Buchholzer * Director
         Ohio Department of Natural Resources
                                       July 14, 1992
         Mr. Mark Gilliat
         EG&G M.A.T.
         P.O. Box 3000
         Miamisburg, OH  45343-3000
         Dear Mr. Gilliat:
                In response to our recent phone conversation and your follow
         up letter requesting a statement that the Mound Facility has no
         impact on a State or National Wild and Scenic River, I can verify
         that the Great Miami River is not a component of the State or
         National Wild and Scenic Rivers System.
                The Mound Facility is not located near a designated State or
         National Scenic River.  The Stillwater State Scenic River is a
         tributary to the Great Miami and enters the river, at Dayton.
         Since the Stillwater is upstream of the Mound Facility, no impact
         would be anticipated.
                Thank you for providing me the opportunity to comment.
                                        Sincerely,
                                       Stuart Lewis, Administrator
                                       Ohio Scenic Rivers Program
                                       Division of Natural Areas & Preserves
          SL/slc

                                                  George V. Voinovich * Governor
                                                  Frances S. Buchholzer *  Director
                                       August 4, 1992
          Mark Gilliat, Engineer
          EG&G Mound Applied Technologies
          P.O. Box 3000
          Miamisburg, OH  45343-3000
          Dear Mr. Gilliat:
                After reviewing our maps and files, I find the Division of
          Natural Areas and Preserves has no records of rare and endangered
          species in the Department of Energy Mound Facilities project
          area.
                There are no existing or proposed nature preserves or scenic
         rivers in the project area, and we are unaware of any other
         unique ecological sites in the vicinity of the Miamisburg,
         Montgomery County site.
                Because our inventory program relies on information supplied
          by a number of individuals and organizations, a lack of records
          for any particular area is not a statement that special plant or
          animal species are absent from a site.  Please note that we
          inventory only high-quality plant communities and do not maintain
          an inventory of all Ohio wetlands.
                I have included a copy of our plant and animal lists for
          your information.  The invoice for this search has been sent
          separately to Beverly Peters in the EG&G Mound Applied
          Technologies Library.  Please contact me if I can be of further
          assistance.
                                         Sincerely,
                                         Jennifer Hillmer, Ecological Analyst
                                         Division of Natural Areas & Preserves
          JH/slc

                FINDING OF NO SIGNIFICANT IMPACT
             DECONTAMINATION AND DECOMMISSIONING PROJECTS
                                 MOUND PLANT
                              MIAMISBURG, OHIO
AGENCY:     U. S. Department of Energy, Ohio Field Office
ACTION:     Finding of No Significant Impact for Mound Plant
            Decontamination and Decommissioning Projects
SUMMARY:
The U.S. Department of Energy (DOE) has prepared an Environmental
Assessment (EA) for seven decontamination and decommissioning
(D&D) projects at the Mound Plant in Miamisburg, Ohio, that have
not been previously addressed in the Final Environmental Impact
Statement for the Mound Facility (June 1979).  Based on the
information presented in the EA, the DOE has determined that the
proposed action is not a major Federal action significantly
affecting the quality of the  human environment within the
meaning of the National Environmental Policy Act (NEPA) of 1969. 
Therefore, the preparation of an Environmental Impact Statement
(EIS) is not required and the Department is issuing this Finding
of No Significant Impact (FONSI).
BACKGROUND:
The Mound Plant is a federal facility operated by EG&G Mound
Applied Technologies, Inc., located in Miamisburg, Ohio, which is
approximately 16 km (10 miles) southwest of Dayton, Ohio.  The
305 acre Mound Plant is comprised of approximately 100 buildings
whose previous and current missions include:  research,
development, engineering, production and surveillance of
components for DOE weapons programs; separation, purification and
sale of stable isotopes; and conduct of DOE programs in nuclear
safeguards and waste management, heat source testing and fusion
fuel systems.
                                                                              Page 1 of 5
The location of the projects in the EA include rooms in three
buildings and several soil locations.  They are described as
follows:  Research (R) Building - R-140 Laboratory; Semi-Works
(SW) Building - five surplus rooms and support areas; Waste
Disposal Annex (WDA) Building - seven surplus rooms; Sanitary
Disposal (SD) Plant - entire 500 square foot plant; Building 21 -
entire 5,000 square foot building; Underground Liquid Waste
Transfer Lines to the Waste Disposal Building - approximately
4,000 linear feet of piping and soil; and former Office of
Military Applications Contaminated Soils area located throughout
the site.
PROPOSED ACTION:
The proposed decontamination and decommissioning actions at these
locations within the Mound Plant involve remediation of
contaminated buildings or specific rooms within buildings and
excavation and disposal of contaminated soil and other materials. 
Specifically, the remediation involves demolition of reinforced
concrete structures, cleaning and removal of equipment and
piping, structural decontamination, soil excavation, waste
packaging, and disposal of wastes.  A sampling program will be
used to verify the success of the remediation activities.  The
contamination present at most D&D projects is thought to be
entirely radioactive, with one exception, because no traceable
paths for nonradioactive hazardous materials are known, except
for asbestos which will be removed.  Approximately two liters of
tritiated mercury, a radioactive mixed waste, is present in the
SW building.
The major radioisotopes included in this action are plutonium-
238, thorium-232 and tritium.  Minimal trace amounts of
protactinium-231, thorium-230, thorium-229, uranium-233,
americium, cobalt-60, radium, cesium, polonium-210 daughter
products, and isotopes of bismuth may also be encountered. 
Existing monitoring data and historical information indicate an
estimated 316 Curies (Ci) of plutonium-238 contamination, 31 Ci
of tritium contamination, and 6 Ci of thorium contamination
present in the projects.
                                                                              Page 2 of 5
ENVIRONMENTAL IMPACTS:
The potential environmental consequences of the proposed action
were analyzed for two categories of activities:  (1)
decontamination and decommissioning and (2) transportation
impacts.  No significant impacts were determined in any category
under routine or accident conditions.  The results are summarized
below.
Decontamination and Decommissioning
Personnel dose equivalent expected to result from the proposed
projects will remain well below the limits established by DOE
Order 5480.11.  Neither internal dose equivalent (primarily from
alpha/beta contamination) nor external dose equivalent (primarily
from gamma radiation) for the maximally exposed worker is
expected to exceed 0.5 rem/year.
The D&D activities will be conducted in such manner as to
minimize emissions.  Examples of minimization include:  dust
control through the use of water mist, utilization of paint to
temporarily trap contamination during size reduction, utilization
of High Efficiency Particulate Air (HEPA) filtered vacuum
cleaners, and use of retention ponds, settling basins, and silt
fences for water runoff.  Based on these practices and past D&D
activities, any releases resulting from the proposed action are
expected to remain below 1% of the DOE Derived Concentration
Guide (DCG).
No Species on Federal or State of Ohio lists of endangered and
threatened species have been found on the Mound Plantsite.  The
habitats present are not generally supportive of the species on
these lists with the exception of the shagbark hickory which may
host the Indiana bat.  No shagbark hickories were found at any
locations relative to this action.  There are no hydric soils
within the site boundaries or off-site down gradient, thus no
wetlands are anticipated to be involved in this action.
Transportation
Potential exposure to transportation personnel as a result of
transporting waste will remain well within the limits established
by DOE Order 5480.11.  There is a certain potential for non-
radiological injury or death as a result of a truck accident
during the transportation of wastes.  It is estimated that waste
shipments may lead to .73 accidents in rural areas, 4.34
accidents in suburban, and 1.55 accidents in urban areas during a
four year period.  An estimated total of 2,141 shipments will be
made from Mound Facility.
                                                                              Page 3 of 5
ALTERNATIVES CONSIDERED:
In the EA, the Department considered three alternatives to this
action: (1) No Action, (2) Deferred Action, (3) Complete
Demolition.  If no action is taken, the radioactively
contaminated soil, equipment, and structures will remain in place
leading to radiological risks to personnel at the Mound Plant. 
In addition, contaminates will continue to disperse into soil and
groundwater, and emissions due to an accidental release are
possible.  This action was not selected in compliance with DOE
initiatives for radiation protection of the public and the
environment and also to meet the requirements within the Federal
Facilities Agreement (FFA) among the U. S. Environmental
Protection Agency (EPA), Ohio Environmental Protection Agency,
and DOE signed in 1993.  Deferred action has the same effects as
no action until D&D is undertaken and was not selected for the
reasons stated above.  Complete demolition of SW Building, WD
Building, and R Building would require temporary but extended
shutdown of all Mound operations based in those buildings.  The
existing operations could be relocated to new or possibly
existing facilities.  Complete demolition would remove the
existing functional facilities before their useful life.  As the
operations to be maintained would cause the new facilities to
become radioactively contaminated, this would generate new
contaminated facilities for future D&D.  Thus the complete
demolition alternative was not selected.
FOR FURTHER INFORMATION, CONTACT:
For further information on the proposed action (including a copy
of the Environmental Assessment), please contact:
      Sue Smiley, NEPA Compliance Officer
      DOE Ohio Field Office
      P.O. Box 3020
      Miamisburg, OH  45343-3020
      (513) 865-3987
For general information on the DOE's National Environmental
Policy Act process, please contact:
      Carol Borgstrom, Director
      DOE Office of NEPA Policy and Assistance 
      1000 Independence Avenue, SW
      Washington, DC  20585
      (202) 586-4600  or  (800) 472-2756
                                                                              Page 4 of 5
FINDING:
The D&D actions described in the EA will take place over the next
sixteen years and will result in minimal radiological exposure to
D&D workers as well as the general public.  Any exposure will be
well within DOE established limits.  All wastes generated will be
shipped for burial (LLW) or stored (Mixed and TRU) until it can
be disposed.
A long term beneficial environmental effect from this action is
the elimination of some sources of radioactive emissions and
reductions in the cost of continuing environmental surveillance
in some areas at the Mound Plant.
Declaration of Finding
The DOE has determined that the proposed action is not a major
Federal action significantly affecting the quality of the human
environment, within the meaning of the NEPA of 1969.  Therefore,
the preparation of an Environmental Impact Statement (EIS) is not
required and the Department is issuing a Finding of No
Significant Impact (FONSI).
Signed in Miamisburg, Ohio, on May 16, 1995.
                                                J. Phil Hamric
                                                Manager
                                                                              Page 5 of 5 