UNITED24 - Make a charitable donation in support of Ukraine!

Weapons of Mass Destruction (WMD)

    SAMARRA REPORT Filename:73559775 SUBJECT: SAMARRA REPORT PATHFINDER RECORD NUMBER: 59775 GENDATE: 950605 NNNN TEXT: ENVELOPE RATMCIAB YEKDQA 4321 2641741-MIDO--YEKDQX. ZNY MMIDO ZNZ1 ZKZK RR AAZ DE HEADER R 211741Z SEP 90 ZYS FM SSO DIA/AIRES TO CINCUSNAVEUR SSO USEUCOM SSO CINCCENT FIC CATIS SSO CINCSOC//J2-OI// USAINTCTREUR SSO IRC CATIS BRFINK MHE SSO USAFE SSO SAC SAC PACER ETUTUSAREUR FOSIF WPAC SSO ITIC-PAC PACAF IDHS SSO IPAC CSG PACAF SSO FTD FICPAC CATIS AFIS//INOAD// SAFE ETUT FWD NAVSTKWARCEN CMO 513 MI BDE ESC IDHS ESC CATIS MACDILL ZEM [ (b)(2) ] [ (b)(2) ] SUBJECT: CRATES AND POSSIBLE DECONTAMINATION TRUCK AT STORAGE AREA SECTION 01 OF 01 SECTIONS BODY MSGID/IIR/[ (b)(2) ] RPTID/SUPIR/[ (b)(2) ] ITEMTYP/SIGNIFICANT ACTIVITY OR OB ITEMS// ITEM/003/SAMARRA CW RSCH PROD A STOR FAC/[ (b)(2) ] /CTY:IZ/Y// LOC/GEO:334956N0434813E/UTM:38SLC39283744// [ (b)(2) ] [ b.2. ] / /ON 14 SEPTEMBER, PROBABLE CHEMICAL WARFARE (CW) RELATED CRATES /WERE LOADED ON A STAKE BED TRUCK AT THE PROBABLE TEFLON-LINED /CONTAINER BUILDING IN THE SAMARRA MATERIAL-CHEMICAL STORAGE AREA /(AREA H). THIS IS THE FIRST TIME SUCH CRATES HAVE BEEN SEEN IN /THIS AREA SINCE JUNE 1988. THIS SUGGESTS A CHANGE IN THE /MUNITIONS FILLING ROUTINE OBSERVED FROM 15 JULY TO 14 AUGUST, WHEN /STAKE BED TRUCKS LOADED WITH PROBABLE CW RELATED CRATES MOVED /BETWEEN THE CRUCIFORM BUNKER AREA (AREA D) AND THE PROBABLE /FILLING COMPOUND (AREA A). THE NUMBER OF VEHICLES OBSERVED ON THE /ROADS BETWEEN AREAS A AND D HAS DECREASED SINCE 14 AUGUST. / / /TWO PROBABLE TEFLON-LINED CONTAINER BUILDINGS ARE AT SAMARRA -- /ONE IN AREA A AND ONE IN AREA H. THE BUILDING IN AREA H WAS /IDENTIFIED [ (b)(1) sec 1.3(a)(4) ] AS A "TEFLON HALL", WHICH /PRODUCES PLASTIC BOTTLES THAT ARE PROBABLY USED TO HOLD CW AGENTS. /TEFLON PROTECTS CONTAINERS FROM THE CORROSIVE EFFECTS OF CW /AGENTS. / /THE TWO PROBABLE TEFLON-LINED CONTAINER BUILDINGS EACH HAVE 12 /VENTS ON THE ROOF AND AIR HANDLING EQUIPMENT ON THE SIDES. /CONSTRUCTION STARTED ON THESE BUILDINGS BETWEEN 17 OCTOBER, 1984 /AND 22 JANUARY, 1985; THEY WERE COMPLETED BY 7 JUNE 1986. / / /ALSO ON 14 SEPTEMBER, A BUS AND A PROBABLE DECONTAMINATION TRUCK /WERE PARKED IN AREA A AND A STAKE BED TRUCK WITH A LOAD OF /PROBABLE CRATES WAS AT THE ENTRANCE OF THE CRUCIFORM BUNKERED /STORAGE AREA, AREA D. / / [ (b)(6) ] / /[ (b)(6) ] / /[ (b)(2) ] / // [ (b)(2) ]




NEWSLETTER
Join the GlobalSecurity.org mailing list