Weapons of Mass Destruction (WMD)
PHASE 3 12-HOUR ASSESSMENT NO. 13
Filename:72927757
PATHFINDER RECORD NUMBER: 27757
GENDATE: 950605
NNNN
TEXT:
ENVELOPE CDSN = LGX991 MCN = 91024/18004 TOR = 910241058
OTTSZYUW RUEKJCS0677 0241056- --RUEALGX.
ZNY
HEADER O 241056Z JAN 91
FM JOINT STAFF WASHINGTON DC
INFO RUEALGX/SAFE
O 230800Z JAN 91
FM DIA WASHINGTON DC//OICC//
TO RHIPAAA/USCINCCENT//CCJ2/CCJ2-PT/CCJ2-CAC/CCJ3/DIA REP//
AIG 7827
INFO RHIPAAA/NAVCENT
RHIHDAA/COMSOCCENT//SOJ2//
RUEHAK/USDAO ANKARA TU//NMIST/ITF//
RHJDABA/CDR VII CORPS MAIN
RUEAHQA/AFIA WASHINGTON DC//INT//
RUEAHQA/CSAF WASHINGTON DC//XOXFWD//
RUCJACC/USCENTCOM REAR MACDILL AFB FL//CCJ2/CCJ3//
RUHQHQA/USCINCPAC HONOLULU HI//J2/J22/DIA REP//
RHHMBRA/COMUSNAVCENT PEARL HARBOR HI//N2//
RUCJAAA/USCINCSOC MACDILL AFB FL//CC//
RUCBSAA/AIC NORFOLK VA//OO//
RUSNTCC/USEUCOM VAIHINGEN GE//ECJ2-ISC/JICEUR//
RUCUAAA/HQ SAC OFFUTT AFB NE//IN/INA/DIA REP/INO//
RHDIAAA/HQ TAC LANGLEY AFB VA//BS/INP/IN//
RUCBSAA/USCINCLANT NORFOLK VA//J2/J22/J2L/J3/JOC//
RUCBSAA/FICEURLANT NORFOLK VA//OO/20/40/ISAFF//
RHFQAAA/HQ USAFE RAMSTEIN AB GE//INO/COIC/495RTS//
RUEADWD/HQ DA WASHINGTON DC//DCS-1/DAMI-POI//
RUEAHQA/HQ USAF WASHINGTON DC//IN/INX/INXY//
RUENAAA/CNO WASHINGTON DC//DNI/OP-092/OP-921//
RUEACMC/CMC WASHINGTON DC//INT/C412//
RUCBSAA/CINCLANTFLT NORFOLK VA//N2//
RHHMBRA/CINCPACFLT PEARL HARBOR HI//N2//
RUHVPAC/HQ PACAF HICKAM AFB HI//IN/INP//
RHEPAAB/TAC IDHS LANGLEY AFB VA//INPO//
RUHGBAA/COMIDEASTFOR
RUSNNOT/COMSOCEUR VAIHINGEN GE//J2//
RHIPAAA/COMUSMARCENT REAR
RUHGOAA/COMSEVENTHFLT
RHIDFRA/4300PBW//CC/IN//
RUFLEPA/20TFW DEPLOYED //IN//
RUCQCAT/CATIS MACDILL AFB FL
RULSPEA/PEOCMPANDUAV WASHINGTON DC//PMA 281-3I//
RUQVKEW/HQ AFEWC KELLY AFB TX//INC//
RUCEAAM/USSPACECOM INTEL CEN CHEYENNE MTN AFB CO//J20/J20W//
RUSNNOT/COMSOCEUR VAIHINGEN GE//J2//
RHCUAAA/USCINCTRANS SCOTT AFB IL//TCJ2/TCJ2-0/JITC/DIA REP//
RUCIBBA/HQ 9AF SHAW AFB SC//IN//
RHFIAAA/15 AF MARCH AFB CA//IN//
RUCVNAF/8 AF BARKSDALE AFB LA//IN
[ (b)(1) sec 1.3(a)(4) ]
BT
[ (b)(2) ]
SECTION 01 OF 04
COMUSARCENT PASS TO [ (b)(2) ]
/*********** THIS IS A COMBINED MESSAGE ************/
BODY SUBJ: PHASE 3 12-HOUR ASSESSMENT NO. 13
1. [ (b)(2) ] THIS MESSAGE INCLUDES DATA RECEIVED BY
222400Z JAN 91. [ (b)(1) sec 1.3(a)(4) ]
2. [ (b)(1) sec 1.3(a)(4) ]
3. [ (b)(1) sec 1.3(a)(4) ]
4. [ (b)(1) sec 1.3(a)(4) ]
5. [ (b)(1) sec 1.3(a)(4) ]
6. [ (b)(1) sec 1.3(a)(4) ]
7. [ (b)(1) sec 1.3(a)(4) ]
8. [ (b)(2) ] NAME: ABU GHURAYB INFANT FORMULA PLANT; [
(b)(1) sec 1.3(a)(4) ]
PHYSICAL DAMAGE: BUILDING SEVERELY DAMAGED.
FUNCTIONAL DAMAGE ON INSTALLATION (INFERRED): ONE OF TWO
PROCESSING
BUILDINGS DESTROYED, THEREFORE PRODUCTION OF BW AGENT NOT POSSIBLE
AT THIS BUILDING. FACILITY IS CAPABLE OF PRODUCING APPROXIMATELY
50
PERCENT OF PREVIOUS UNDAMAGED PRODUCTION.
[ (b)(1) sec 1.3(a)(4) ]
[ (b)(2) ]
9. [ (b)(1) sec 1.3(a)(4) ]
10. [ (b)(2) ] NAME: SAMARRA CHEM WARFARE PROD/STOR; REFERENCE
[ (b)(1) sec 1.3(a)(4) ]
POSSIBLE INTERNAL CW CONTAMINATION.
UPDATE: PROD BLDG APPEARS TO HAVE BEEN HIT ON W. CENT SIDE.
FUNCTIONAL DAMAGE ON INSTALLATION (INFERRED): AT LEAST 40 TO 50
PERCENT OF IRAQI CW AGENT PRODUCTION AND TWO-THIRDS OF MUNITION
FILLING CAPABILITY HAS BEEN DESTROYED. LOSS OF AMMO FILLER IS A
MAJOR BLOW AND WILL LIMIT REPLENISHMENT OF ARTILLERY AND MRL
MUNITIONS. EVEN IF MORE AGENTS COULD BE MADE, LOSS OF FILLING AND
PROBABLE ADJACENT PARTS WAREHOUSES WILL MAKE CONTINUED PRODUCTION
MUCH MORE DIFFICULT.
[ (b)(1) sec 1.3(a)(4) ]
[ (b)(2) ]
11. [ (b)(1) sec 1.3(a)(4) ]
12. [ (b)(1) sec 1.3(a)(4) ]
13. [ (b)(2) ] NAME: SALMAN PAK CW RSCH PROD A STOR FAC; [
(b)(1) sec 1.3(a)(4) ]
PHYSICAL DAMAGE: BUNKER [ (b)(1) sec 1.3(a)(4) ]
COMPLETELY DESTROYED, BUNKER [ (b)(1) sec 1.3(a)(4) ]
DESTROYED, WITH ROOF PARTIALLY COLLAPSED. STORAGE BUNKER
DESTROYED AT S.E. AREA PIII. SECURITY FENCE/ADDITIONAL BUNKER
DESTROYED' VEHICULAR ACTIVITY IN RESEARCH/ENGINEERING AREA AND
STORAGE/SUPPORT BUILDING. NO ACTIVITY IN BW LAB (P4) AREA.
FUNCTIONAL DAMAGE ON INSTALLATION (INFERRED): BUNKERS WOULD HAVE
TO
BE REPLACED TO REGAIN FULL STORAGE CAPACITY' NEED FULL ACCESS TO
ASSESS SECOND BUNKER, WHICH SHOWS ONLY SOME SCORCHING ON ROOF.
[ (b)(1) sec 1.3(a)(4) ]
14. [ (b)(1) sec 1.3(a)(4) ]
15. [ (b)(6) ]
BT
#0680
INFODATE: 0
NEWSLETTER
|
Join the GlobalSecurity.org mailing list
|
|