/AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec 1.3(a)(4) ]
Filename:3912872
GENDATE: 950718
NNNN
TEXT:
ENVELOPE OAAMCIAA YHLADN 4216 0470702-MXOL--YEKDQX.
ZNY MMXOL
ZKZK OO AAZ DE
HEADER O 160654Z FEB 91
[ (b)(1) sec 1.3(a)(4) ]
Subject: /AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec
1.3(a)(4) ]
/CTY:IZ//
LOC/
[ (b)(1) sec 1.3(a)(4) ]
RMK/
/[ (b)(1) sec 1.3(a)(4) ]
/OBJECTIVE: UNK
/WEAPONS PLANNED: UNK WITH: TOT:
/AIMPOINT 1: CURING-STOR BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)CURING-STOR AREA
/(C)MOD-SEV(C)CONF
/(E)BLDG SUSTAINED MOD-SEVERE DAMAGE FROM 2 NEW HITS AT [ (b)(1)
sec 1.3(a)(4) ]. ONE CRATER NEXT TO 10-T.3. ROOFING HAS BEEN
BLOWN OFF
/ON ABOUT 2-3 OF ALL 4 BLDGS. POSS BLAST DAMAGE FROM UNKNOWN
ORIGIN /TO BLDGS IN FRONT OF THE 4 CURING BLDGS AT [ (b)(1) sec
1.3(a)(4) ].
/OPTIMAL REPAIR-REPLACE: 030-180 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: 50% OF CURING BLDG HAS
/RECEIVED LIGHT DAMAGE TO EXTERNAL SURFACES.
/AIMPOINT 2: UI BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)UI BLDG
/(C)MOD (D)CONF
/(E)UI BLDG AT [ (b)(1) sec 1.3(a)(4) ] SUSTAINED MODERATE
DAMAGE. 90% OF ROOF IS
/BLOWN OFF. STOR TANK AT [ (b)(1) sec 1.3(a)(4) ] SUSTAINED
SEVERE DAMAGE. PROB
/BLAST DAMAGE TO PIPING IN THIS AREA.
/OPTIMAL REPAIR-REPLACE:
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: [ (b)(1) sec 1.3(a)(4)
]
/IS UNKNOWN. BLDG, PIPES AND AT LEAST 1 STORAGE TANK RECEIVED MOD
/TO SEVERE DAMAGE. ESTIMATE 30-60 DAY REPAIR TIME FOR PIPES AND
/STOR TANK. ESTIMATE 60-180 DAYS FOR REPAIR OF BLDG.
/AIMPOINT 3: POSSIBLE STOR BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)STOR BLDG
/(C)MOD (D)CONF
/(E)STOR BLDG SUSTAINED POSSIBLE MOD DAMAGE ON EAST SIDE OF BLDG.
/WALLS [ (b)(1) sec 1.3(a)(4) ] TO HAVE BEEN BLOWN-OUT ON THAT
SIDE. ROOF IS LIGHTLY
/DAMAGED.
/OPTIMAL REPAIR-REPLACE: 060-090 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: BLDG SUFFERED MOD DAMAGE.
/AIMPOINT 4: UI BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)UI BLDG
/(C)LT (D)CONF
/(E)LIGHT DAMAGE TO A SMALL BLDG NEXT TO THE UREA STOR BLDG. POSS
/DAMAGE TO CONVEYOR SYSTEM FROM IMPACT CRATER AT [ (b)(1) sec
1.3(a)(4) ]
/OPTIMAL REPAIR-REPLACE: 014-030 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: LIGHT DAMAGE SHOULD BE
/EASILY REPAIRED. POSS LIGHT OR SUPERFICIAL DAMAGE TO CONVEYOR.
/AIMPOINT 5: SMALL SHED COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)SMALL SHED
/(C)DES (D)CONF
/(E)SHED WAS DESTROYED CAUSING POSSIBLE MOD FIRE DAMAGE TO THE
/ADJACENT LARGER BLDG. ADDITIONAL DAMAGE TO THE BLDG TO THE WEST
/FROM DEBRIS WAS [ (b)(1) sec 1.3(a)(4) ].
/OPTIMAL REPAIR-REPLACE:
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: SMALL STOR SHED WAS
/DESTROYED. LARGER BLDG SUFFERED BLAST AND FIRE DAMAGE AND IS NOT
/USEABLE IN ITS PRESENT STATE.
/AIMPOINT 6: STORAGE TANK COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)STOR TANK
/(C)DES (D)CONF
/(E)1 STOR TANK DESTROYED FROM IMPACT OF BOMB, CAUSING PIPES THAT
/WERE RUNNING BETWEEN THE ROWS OF TANKS TO DROP.
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: TANK DESTROYED. CONTENTS,
/IF ANY, ARE PROBABLY CONTAMINATED.
/AIMPOINT 7: MANIFOLD CHOKEPOINT COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)MANIFOLD CHOKEPOINT
/(C)SEV (D)CONF
/(E)SEVERE DAMAGE TO MANIFOLD CHOKEPOINT FROM BOMD IMPACT SEVERING
/STOR TANK FROM FACILITY PIPELINE NETWORK.
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: ACCESS TO STOR TANKS BY
/PIPES TEMPORARILY ELIMINATED.
/AIMPOINT 8: UI STOR BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)UI STOR BLDG
/(C)LT (D)CONF
/(E)BLDG RECEIVED LIGHT DAMAGE TO THE END OF THE BLDG.
/OPTIMAL REPAIR-REPLACE: 014-030 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: MOST OF BLDG INTACT. BLDG
/FUNCTION UNK.
/AIMPOINT 9: 2 STOR BLDGS COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 2 (B)STOR BLDGS
/(C)DES (D)CONF
/(E)BOTH BLDGS 85% DESTROYED. POSS DAMAGE TO CONVEYOR SYSTEM THAT
/LEADS TO YELLOW CAKE EXSTRACTION AREA.
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDGS ARE
/HEAVILY DAMAGED. BLDGS ARE NOT USEABLE. PIPELINE-CONVEYOR SYSTEM
/DISRUPTED.
/AIMPOINT 10: STOR BLDG COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)STOR BLDG
/(C)MOD (D)CONF
/(E)BLDG MODERATELY DAMAGED FROM BOMB BLAST TO ABOUT 20% OF BLDG.
/OPTIMAL REPAIR-REPLACE:
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDG
/RECEIVED MODERATE DAMAGE TO ABOUT 20% OF STRUCTURE.
/AIMPOINT 11: PROB STEAM PLANT COORDINATES:
/GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)STEAM PLANT
/(C)MOD (D)CONF
/(E)MODERATE BLAST DAMAGE TO ROOF OF STEAM PLANT. APPROX 50% OF
/ROOF BLOWN AWAY WITH DEBRIS BLOWN ON LOWER PORTION OF BLDG. POSS
/DAMAGE TO STEAM PIPES AT THE REAR OF BLDG.
/OPTIMAL REPAIR-REPLACE: 060-090 DAYS
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: PROBABLE INTERNAL DAMAGE
/TO BOILERS. COMPLETE DISRUPTION OF PROCESSING COULD OCCUR AT
LEAST /TEMPORARILY.
/FUNCTIONAL DAMAGE ON THE INSTALLATION (INFERRED): OPERATIONS AT
/FACILITY ARE UNLIKELY UNTIL STEAM CAN BE RESTORED AND DAMAGE TO
/OTHER PIPELINES IS REPAIRED. THERE IS SUFFICIENT DAMAGE TO
/FACILITY TO KEEP IT OUT OF ACTION FOR AT LEAST 30 DAYS.
/MISSION ASSESSMENT: [ (b)(1) sec 1.3(a)(4) ]
/SOURCES: [ (b)(1) sec 1.3(a)(4) ]
/ANALYST REFERENCE
[ (b)(1) sec 1.3(a)(4) ], [ (b)(2) ][ (b)(6) ]
INFODATE: 0
NEWSLETTER
|
Join the GlobalSecurity.org mailing list
|
|