/AL QAIM SUPERPHOSPHATE FTLZR PLNT/[   (b)(1) sec 1.3(a)(4)   ]
Filename:3912872
GENDATE:         950718
NNNN
TEXT:            
ENVELOPE OAAMCIAA YHLADN 4216 0470702-MXOL--YEKDQX.
ZNY MMXOL
ZKZK OO AAZ DE
HEADER O 160654Z FEB 91
[   (b)(1) sec 1.3(a)(4)   ]
Subject: /AL QAIM SUPERPHOSPHATE FTLZR PLNT/[   (b)(1) sec 
1.3(a)(4)   ]
/CTY:IZ//
LOC/
[   (b)(1) sec 1.3(a)(4)   ]
RMK/ 
/[   (b)(1) sec 1.3(a)(4)   ]
/OBJECTIVE: UNK 
/WEAPONS PLANNED: UNK WITH: TOT: 
/AIMPOINT 1: CURING-STOR BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ] 
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)CURING-STOR AREA 
/(C)MOD-SEV(C)CONF 
/(E)BLDG SUSTAINED MOD-SEVERE DAMAGE FROM 2 NEW HITS AT [   (b)(1) 
sec 1.3(a)(4)   ]. ONE CRATER NEXT TO 10-T.3. ROOFING HAS BEEN 
BLOWN OFF 
/ON ABOUT 2-3 OF ALL 4 BLDGS. POSS BLAST DAMAGE FROM UNKNOWN 
ORIGIN /TO BLDGS IN FRONT OF THE 4 CURING BLDGS AT [   (b)(1) sec 
1.3(a)(4)   ].
/OPTIMAL REPAIR-REPLACE: 030-180 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: 50% OF CURING BLDG HAS 
/RECEIVED LIGHT DAMAGE TO EXTERNAL SURFACES. 
/AIMPOINT 2: UI BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)UI BLDG 
/(C)MOD (D)CONF 
/(E)UI BLDG AT [   (b)(1) sec 1.3(a)(4)   ] SUSTAINED MODERATE 
DAMAGE. 90% OF ROOF IS 
/BLOWN OFF. STOR TANK AT [   (b)(1) sec 1.3(a)(4)   ] SUSTAINED 
SEVERE DAMAGE. PROB 
/BLAST DAMAGE TO PIPING IN THIS AREA. 
/OPTIMAL REPAIR-REPLACE:
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: [   (b)(1) sec 1.3(a)(4) 
  ]
/IS UNKNOWN. BLDG, PIPES AND AT LEAST 1 STORAGE TANK RECEIVED MOD 
/TO SEVERE DAMAGE. ESTIMATE 30-60 DAY REPAIR TIME FOR PIPES AND 
/STOR TANK. ESTIMATE 60-180 DAYS FOR REPAIR OF BLDG. 
/AIMPOINT 3: POSSIBLE STOR BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ] 
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)STOR BLDG 
/(C)MOD (D)CONF 
/(E)STOR BLDG SUSTAINED POSSIBLE MOD DAMAGE ON EAST SIDE OF BLDG. 
/WALLS [   (b)(1) sec 1.3(a)(4)   ] TO HAVE BEEN BLOWN-OUT ON THAT 
SIDE. ROOF IS LIGHTLY 
/DAMAGED. 
/OPTIMAL REPAIR-REPLACE: 060-090 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: BLDG SUFFERED MOD DAMAGE. 
/AIMPOINT 4: UI BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)UI BLDG 
/(C)LT (D)CONF 
/(E)LIGHT DAMAGE TO A SMALL BLDG NEXT TO THE UREA STOR BLDG. POSS 
/DAMAGE TO CONVEYOR SYSTEM FROM IMPACT CRATER AT [   (b)(1) sec 
1.3(a)(4)   ]
/OPTIMAL REPAIR-REPLACE: 014-030 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: LIGHT DAMAGE SHOULD BE 
/EASILY REPAIRED. POSS LIGHT OR SUPERFICIAL DAMAGE TO CONVEYOR. 
/AIMPOINT 5: SMALL SHED COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B)SMALL SHED 
/(C)DES (D)CONF 
/(E)SHED WAS DESTROYED CAUSING POSSIBLE MOD FIRE DAMAGE TO THE 
/ADJACENT LARGER BLDG. ADDITIONAL DAMAGE TO THE BLDG TO THE WEST
/FROM DEBRIS WAS [   (b)(1) sec 1.3(a)(4)   ]. 
/OPTIMAL REPAIR-REPLACE: 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: SMALL STOR SHED WAS 
/DESTROYED. LARGER BLDG SUFFERED BLAST AND FIRE DAMAGE AND IS NOT 
/USEABLE IN ITS PRESENT STATE. 
/AIMPOINT 6: STORAGE TANK COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)STOR TANK 
/(C)DES (D)CONF 
/(E)1 STOR TANK DESTROYED FROM IMPACT OF BOMB, CAUSING PIPES THAT 
/WERE RUNNING BETWEEN THE ROWS OF TANKS TO DROP. 
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: TANK DESTROYED. CONTENTS, 
/IF ANY, ARE PROBABLY CONTAMINATED. 
/AIMPOINT 7: MANIFOLD CHOKEPOINT COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)MANIFOLD CHOKEPOINT
/(C)SEV (D)CONF 
/(E)SEVERE DAMAGE TO MANIFOLD CHOKEPOINT FROM BOMD IMPACT SEVERING 
/STOR TANK FROM FACILITY PIPELINE NETWORK. 
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: ACCESS TO STOR TANKS BY 
/PIPES TEMPORARILY ELIMINATED. 
/AIMPOINT 8: UI STOR BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)UI STOR BLDG 
/(C)LT (D)CONF 
/(E)BLDG RECEIVED LIGHT DAMAGE TO THE END OF THE BLDG. 
/OPTIMAL REPAIR-REPLACE: 014-030 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: MOST OF BLDG INTACT. BLDG 
/FUNCTION UNK. 
/AIMPOINT 9: 2 STOR BLDGS COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 2 (B)STOR BLDGS 
/(C)DES (D)CONF 
/(E)BOTH BLDGS 85% DESTROYED. POSS DAMAGE TO CONVEYOR SYSTEM THAT 
/LEADS TO YELLOW CAKE EXSTRACTION AREA. 
/OPTIMAL REPAIR-REPLACE: 030-060 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDGS ARE 
/HEAVILY DAMAGED. BLDGS ARE NOT USEABLE. PIPELINE-CONVEYOR SYSTEM 
/DISRUPTED. 
/AIMPOINT 10: STOR BLDG COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ]
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)STOR BLDG 
/(C)MOD (D)CONF 
/(E)BLDG MODERATELY DAMAGED FROM BOMB BLAST TO ABOUT 20% OF BLDG. 
/OPTIMAL REPAIR-REPLACE: 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDG 
/RECEIVED MODERATE DAMAGE TO ABOUT 20% OF STRUCTURE. 
/AIMPOINT 11: PROB STEAM PLANT COORDINATES: 
/GRID REF: BDA REF BOOK [   (b)(1) sec 1.3(a)(4)   ] 
/PHYSICAL DAMAGE ACHIEVED: 
/(A) 1 (B)STEAM PLANT 
/(C)MOD (D)CONF 
/(E)MODERATE BLAST DAMAGE TO ROOF OF STEAM PLANT. APPROX 50% OF 
/ROOF BLOWN AWAY WITH DEBRIS BLOWN ON LOWER PORTION OF BLDG. POSS
/DAMAGE TO STEAM PIPES AT THE REAR OF BLDG. 
/OPTIMAL REPAIR-REPLACE: 060-090 DAYS 
/BEST ASSESSED REPAIR-REPLACE:
/BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: PROBABLE INTERNAL DAMAGE 
/TO BOILERS. COMPLETE DISRUPTION OF PROCESSING COULD OCCUR AT 
LEAST /TEMPORARILY. 
/FUNCTIONAL DAMAGE ON THE INSTALLATION (INFERRED): OPERATIONS AT 
/FACILITY ARE UNLIKELY UNTIL STEAM CAN BE RESTORED AND DAMAGE TO 
/OTHER PIPELINES IS REPAIRED. THERE IS SUFFICIENT DAMAGE TO 
/FACILITY TO KEEP IT OUT OF ACTION FOR AT LEAST 30 DAYS. 
/MISSION ASSESSMENT: [   (b)(1) sec 1.3(a)(4)   ] 
/SOURCES: [   (b)(1) sec 1.3(a)(4)   ] 
/ANALYST REFERENCE 
[   (b)(1) sec 1.3(a)(4)   ], [   (b)(2)   ][   (b)(6)   ]