Subject: IRAQI CW Not Finally Evaluated Intelligence TO FACILITATE ELECTRONIC ACCESS, THIS DOCUMENT HAS BEEN REFORMATTED TO ELIMINATE INFORMATION THAT DOES NOT PERTAIN TO GULF WAR ILLNESS ISSUES OR THAT IS CLASSIFIED. A COPY OF THIS REDACTED DOCUMENT, IN ORIGINAL FORMAT, IS AVAILABLE ON REQUEST. CENTRAL INTELLIGENCE AGENCY WARNING: INFORMATION REPORT, NOT FINALLY EVALUATED INTELLIGENCE DIST: JANUARY 1991 COUNTRY: IRAQ/KUWAIT SUBJ: 1. IRAQ'S ASMIDA FERTILIZER PLANT NEAR KHOR-AL-ZUBAIR 2. RAILROAD-CAR TANKS OF POISON GAS AT ASMIDA DOI: 1990 SUMMARY: AT IRAQ'S ASMIDA FERTILIZER PLANT NEAR ZUBAIR OBSERVED SEVERAL UNUSUAL OCCURRENCES DURING - 1990 E.G. SHIPMENTS OF CYLINDRICAL PLASTIC CAPS (POSSIBILY FOR STORAGE OF ARTILLERY SHELLS): ARTILLERY TEST FIRING IN THE VICINITY OF THE PLANT; AND THE PRESENCE OF AT LEAST SIX RAILROAD TANKERS MARKED "POISON GAS" ON THE COMPOUND. GUARDS AT THE COMPOUND DID NOT UNDERGO CHEMICAL WARFARE DRILLS AND DID NOT CARRY PROTECTIVE CLOTHING OR EQUIPMENT WITH THEM. OBSERVED A LARGE NUMBER OF GOODS WHICH HAD BEEN LOOTED FROM-KUWAIT, INCLUDING CARS, CRANES, OFFICE FURNITURE, AND COMMERCIAL KITCHEN EQUIPMENT. NEW CONSTRUCTION AT THE SITE WAS LIMITED, AND APPEARED TO BE USING MOSTLY SCAVENGED MATERIALS. THERE WAS NO PERCEPTIBLE CHANGE IN THE PLANT'S 24-HOUR PRODUCTION OPERATION A DESCRIPTION OF THE ASMIDA COMPOUND IS PROVIDED. TEXT: 1 THE ASMIDA FERTILIZER FACTORY IN IRAQ. THE FACTORY IS LOCATED ON THE ROAD LEADING FROM THE VILLAGE OF KHOR-AL-ZUBAI (ABOUT 24 KILOMETERS (KM) SOUTH OF BASRAH) TO THE PORT OF UMM QASR ON THE ARABIAN GULF. THE ASMIDA FACILITY PRODUCES UREA FERTILIZER. 2. GENERAL DESCRIPTION: THE ASMIDA COMPOUND SEEMED TO BE ROUGHLY SQUARE IN SHAPE, MEASURING AN ESTIMATED TWO KILOMETERS ON EACH SIDE. IN ADDITION TO NUMEROUS ADMINISTRATIVE AND MAINTENANCE BUILDINGS, THE FACILITY HAD TWO REVERSE OSMOSIS WATER PURIFICATION BUILDINGS PLUS TANKS; A LARGE WHITE BUILDING, WITH ANTENNAS ON TOP AND NO WINDOWS; AT LEAST SIX RAILROAD TANKER CARS MARKED "POISON GAS"; A LARGE (BUNKERED) AMMONIA STORAGE TANK; TWO LARGE CONCRETE SILOS; TWO BAGGING AND ASSEMBLY BUILDINGS; AND THE PRODUCTION LINES -- OR "TRAINS" -- WITH FOUR CRACKING TOWERS. ASMIDA RECEIVED ITS MAIN POWER SUPPLY FROM THE ELECTRIC POWER PLANT AT KARABAH. 3. OBSERVATION OF UNUSUAL ACTIVITY: THREE ITEMS/OCCURRENCES AT THE ASMIDA FACILITY A. A NUMBER OF "UNUSUAL" OBJECTS ON THE RAILROAD TRANSPORT CARS OUTSIDE THE COMPOUND'S EASTERN FENCE. THE OBJECTS APPEARED TO BE CYLINDRICAL PLASTIC "CAPS" ABOUT SIX INCHES IN DIAMETER, WITH ROUNDED HANDLES ON TOP. IDENTIFIED THE ITEMS AS HOLDERS (OR RESTS) FOR ARTILLERY SHELLS. B. THE PRESENCE OF AT LEAST SIX, LARGE METAL RAILROAD- CAR TANKS MARKED "POISON GAS". THE TANKS WERE LOCATED IN THE SOUTHEAST CORNER OF THE FACILITY, NEXT TO THE AMMONIA STORAGE TANK, AND WERE SURROUNDED BY A FENCE. THE SIX TANKS WERE PAINTED WHILTE WITH RED LETTERS, AND DISPLAYED THE INTERNATIONAL SYMBOL FOR "POISON". THE NEWNESS OF THE TANKS CONTRASTED MARKEDLY WITH THE REST OF THE ASMIDA FACILITY, AND THE TANKS SEEMED TO HAVE ARRIVED FAIRLY RECENTLY (NFI). IT WAS NOT KNOWN IF THE TANKS CONTAINED SOME FEEDSTOCK FOR THE FERTILIZER PRODUCTION PROCESS.) C. SOUNDS OF LOUD FIRING AND EXPLOSIVES WERE FREQUENTLY HEARD TO THE SOUTH OF THE FACILITY. 4. ABSENCE OF CHEMICAL PROTECTIVE GEAR: THE ASMIDA GUARDS WERE NOT OBSERVED RECEIVING CHEMICAL WEAPONS (CW) PREPARATIVE TRAINING, AND THEY DID NOT CARRY ANY SPECIAL PROTECTIVE CLOTHING OR EQUIPMENT WITH THEM. THERE WERE NO DECONTAMINIATION FACILITIES OBSERVED AT THE SITE. WESTERN HOSTAGES AT THE SITE WERE GIVEN SPECIAL PROTECTIVE GAS MASKS, AND TOLD TO USE THEM IN THE EVENT OF A CHEMICAL ATTACK. 5. NEW CONSTRUCTION: THERE WAS SOME LIMITED NEW CONSTRUCTION UNDERWAY AT ASMIDA THE IRAQI'S APPEARED TO BE MAKING STRUCTURES TO HOUSE LARGE EQUIPMENT, SUCH AS CRANES. THEY WERE USING SCAVENGED MATERIALS TO BUILD THE UNITS, APPARENTLY OBTAINED FROM THE EXTENSIVE SCRAP METAL AND JUNK HEAPS WHICH SURROUND THE ASMIDA FACILITY. NEW CONSTRUCTION WAS UNDERWAY NEAR THE MAIN GATE AND MOTOR POOL. 6. PRESENCE OF LOOTED KUWAITI GOODS: ON VARIOUS OCCASIONS OF A WIDE VARIETY OF VEHICLES AND PROPERTY HAD BEEN LOOTED FROM KUWAIT. MANY OF THE VEHICLES HAD KUWAITI MARKINGS AND WIRTING ON THEM. THE ITEMS OBSERVED INCLUDED KUWAITI CARS, GARBAGE TRUCKS, CRANES, FACTORY EQUIPMENT, OFFICE FURNITURE, AND COMMERCIAL KITCHEN EQUIPMENT. THE EQUIPMENT AND VEHICLES WERE PARKED ALONG THE MAIN ROAD INTO THE ASMIDA COMPOUND, IN PLAIN VIEW. 7. COMPOUND LAYOUT, DESCRIPTION: A. THE MOST PROMINENT BUILDINGS ON THE COMPOUND WERE TWO ENORMOUS SILOS, EACH ABOUT 250 FEET HIGH AND 75 FEET IN DIAMETER, LOCATED AT THE CENTER OF THE COMPOUND. THE SILOS WERE MADE OF UNPAINTED CONCRETE AND LOOKED LIKE FARM STORAGE SILOS. THE SILOS WERE PART OF THE FERTILIZER PRODUCTION PROCESS: AFTER FORMULATING A TYPE OF POWDER FROM NATURAL GAS, THE POWDER WOULD BE DROPPED INTO THE SILO. AS THE POWDER FELL. IT GREW IN SIZE. LIKE A HAILSTONE. B. IN THE SOUTHERN CORNER OF THE COMPOUND WAS A LARGE WHITE BUILDING WITH NO WINDOWS, MEASURING ABOUT 200 FEET ON EACH SIDE, AND TWO TO THREE FLOORS HIGH. THERE WERE DEVICES ON TOP OF THE BUILDING WHICH APPEARED TO BE EITHER ANTENNAS OR POSSIBLY LIGHTNING RODS. NO DOORS WERE EVER OPEN IN THIS BUILDING. THE WHITE BUILDING CONTAINED A GENERATOR. C. BESIDE THE WHITE BUILDING, TOWARD THE MAIN GATE, WERE TWO LARGE REVERSE OSMOSIS WATER PURIFICATION CENTERS. THERE WERE AT LEAST SIX LARGE WATER STORAGE TANKS ACROSS THE ROAD FROM THE WHITE BUILDING. THE WATER PURIFICATION BUILDINGS SOMETIMES EMITTED A MIST OVER THE COMPOUND. D. AT THE EASTERN CORNER OF THE COMPOUND, NEAR THE REAR ENTRANCE, WAS THE AMONIA STORAGE TANK. IT MEASURED ABOUT 30-40 FEET HIGH, AND ABOUT 100 FEET DIAMETER. THE TANK WAS BUNKERED BY A WALL OF REINFORCED CONCRETE. SPECULATED THAT A LARGE CRATER BEHIND THE EXISTING AMMONIA TANK HAD CONTAINED ANOTHER AMMONIA TANK WHICH WAS DESTROYED, POSSIBLY DURING THE IRAN-IRAQ WAR. E. NEXT TO THE AMMONIA TANK WERE SIX POISON GAS STORAGE TANKS, IN METAL RAILROAD-CAR SIZE TANKS. THE TANKS WERE FENCED IN. F. NORTH OF THE STORAGE TANKS ALONG THE COMPOUND PERIMETER WERE TWO LARGE BUILDINGS WHERE BAGGING AND ASSEMBLY APPARENTLY TOOK PLACE. THE BUILDINGS MEASURED 300 C FEET BY 700-800 FEET, AND WERE BETWEEN TWO AND FOUR FLOORS HIGH. WHEN THE DOORS WERE OPEN, MASSIVE PILES OF UNBAGGED FERTILIZER COULD BE SEEN ON THE FLOOR. THERE WERE CONVEYOR BELTS LEADING INTO AND OUT OF THE BUILDINGS. THE BUILDING CLOSEST TO THE FENCE ALSO HAD A COVERED CONVEYOR BELT WHICH EXTENDED OVER THE FENCE TO THE RAILROAD LOADING PLATFORM, FOR LOADING BAGGED FERTILIZER ONTO THE TRAINS. I. THE TWO PRIMARY ASSEMBLY LINES AND FERTILIZER FABRICATION AREA WERE IN THE COUMPOUND INTERIOR. THE TWO ASSEMBLY LINES, OR "TRAINS," WERE IDENTICAL. EACH TRAIN HAD TWO CRACKING TOWERS AND ITS OWN TWO-FLOOR CONTROL BUILDING. A SERIES OF DUCTS AND PIPES LED FROM THE CRACKING TOWERS TO THE CENTRAL SILOS. J. THERE WAS A LABORATORY BUILDING NEAR THE MAIN GATE. DEVOTED TO QUALITY CONTROL TESTING, END OF MESSAGE 1.5 (c) 63940-63940First Page |Prev Page |Next Page |Src Image
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|