Inter-Korean panel meeting held
KCNA
Munsan, July 4 (KCNA correspondent) -- The third meeting of the north-south panel for reconnecting railway and road links was held in Munsan of the south side from July 2 to 4.
At the meeting both sides discussed practical issues and adopted the following agreement:
The north and the south fixed items of equipment and materials and their quantity to be provided by the south side for steadily pushing forward the projects for reconnecting the east and west coastal railways and roads in each other's direction.
The north and the south agreed to make a separate field survey for designing railway signal, telecommunications and power system on the east and west coastal railroads at an early date and the south side committed itself to render continued technical service for the normal operation of the provided equipment and vehicles.
They agreed to continue discussing a draft basic agreement on train service and the issues of setting up an office for the operation of trains and vehicles and effectuate it before the start of train and motor services.
It was decided to hold the fifth working contact for reconnecting the inter-Korean railway and road links in Kaesong early in August, Juche 92 (2003).
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|