Project 949 Granit / Oscar I
Project 949A Antey / Oscar II
| Specifications | ||
|---|---|---|
| 949 (Oscar-I) | 949A (Oscar-II) | |
| Displacement (tons): | 12,500 surfaced 15,500 - 22,500 submerged |
13,400 - 14,700 surfaced 16,400 - 24,000 submerged |
| Speed (kts): | 32 knots dived 16 kts surfaced |
32 knots dived 16 kts surfaced |
| Dimensions (m): | 143.0 meters long 18.2 meters beam (20.1 with stabilizers) 9.0 meters draft |
154.0 meters long 18.2 meters beam 9.0 meters draft |
| Propulsion | 2 VM-5 190 MWt pressurized-water nuclear reactors (OK-650b) 2 steam turbines - 90,000 shp |
|
| Propulsion | 2 4-bladed propellers | 2 7-bladed propellers |
| Endurance: | 50 days | |
| Diving depth: | 300-600 meters [by various estimates] | |
| Crew : | 94 total | |
| Armament: |
24 - torpedoes/tube-launched weapons |
|
| Electronics |
Radar
Sonar 2 periscopes |
|
|
NEWSLETTER
|
| Join the GlobalSecurity.org mailing list |
|
|
|

