The Largest Security-Cleared Career Network for Defense and Intelligence Jobs - JOIN NOW

Military


Project 670 Skat / Charlie I
Project 670M Chayka / Charlie II

Specifications
Project 670 / Charlie I Project 670M / Charlie II
Displacement (tons): 4,000 surfaced
5,000 submerged
4,500 surfaced
5,400 submerged
Speed (kts): 23 knots dived
16 kts surfaced
Dimensions (m): 94.0 meters long
10.0 meters beam
8.0 meters draft
102.0 meters long
10.0 meters beam
8.0 meters draft
Propulsion 1 VM-5 pressurized-water nuclear reactor
1 steam turbine 20,000 shp
1 5-bladed propeller
Endurance:
Crew about 100
Armament:
  • 8 SS-N-7 Starbright
  • 6 21-in (533-mm) torpedo tubes (fwd)
  • 12 torpedoes or
  • 12 SS-N-15 Starfish
  • 8 SS-N-9 Siren
  • 6 21-in (533-mm) torpedo tubes (fwd)
  • 12 torpedoes or
  • 12 SS-N-15 Starfish
  • Electronics Radar
  • Snoop Tray Surface Search
    Sonar
  • Shark Teeth bow-mounted
    periscopes


  • NEWSLETTER
    Join the GlobalSecurity.org mailing list


    One Billion Americans: The Case for Thinking Bigger - by Matthew Yglesias


     
    Page last modified: 11-07-2011 15:46:26 ZULU