ORP Zbyszko Salvage and rescue
Salvage and rescue ships of "Zbyszko" class; built in Shipyard in Ustka. They are designed to conduct SAR operations and to assist other units in distress.
Ship |
Commissioned |
Flotilla |
ORP |
30th of September 1991 | 8th Coast Defence Flotilla Swinoujscie |
ORP |
20th of March 1992 | 8th Coast Defence Flotilla Swinoujscie |
Dimensions:
- Length: 35 meters
- Beam: 8 meters
- Draugth: 3,7 meters
Displacement: 380 tons.
Propulsion: 1 engine Cegielski-Sulzer , 1 shaft; Speed: 11 knots.
Equipment:
- SAR equipment;
- Underwater works equipment for divers and scuba divers, compressed air systems, tools for underwater repairs, decompression chambers;
- Firefighting systems and equipment.
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|