Background

The ANSF is currently not large enough to cope with the demands of fighting the resilient insurgency in Afghanistan. Accelerating the growth and development of both the Afghan National Army (ANA) and Afghan National Police (ANP) is a vital part of the strategy to create the conditions for sustainable security and stability in Afghanistan. Demonstrable progress by the Afghan government and its security forces in countering the insurgency over the next 12 to 18 months is critical in order to preserve the sustained commitment and support of the international community. A key component of success will be the ability of the ANSF to assume progressively greater responsibility for security operations from the deployed international forces. The requirement to expand the ANSF (both ANA and ANP) rapidly to address the challenges of the insurgency will require ISAF to provide enhanced partnering, mentoring, and enabling capabilities until parallel capabilities are developed within the ANSF.

Key Findings

ANA

The ANA has a force structure of nearly 92k and, while still nascent and dependent on enablers provided by international forces, is increasingly capable of leading or conducting independent operations; however, more COIN capable Afghan Army forces are required in order to conduct sustained COIN operations in key areas of the country.

Over the past several years, the ANA has grown in capacity and capability. Late last year a decision to increase the size of the ANA to 134k was followed by a plan from the Afghan Ministry of Defense (supported by CSTC-A) to accelerate the training of 8 Kandaks in order to enhance security in key areas, mainly in Southern Afghanistan. That acceleration is currently ongoing.

The growth of the ANA to 134k needs to be brought forward from December 2011 to October 2010 in order to create sufficient ANA capacity to create conditions for rapid and sustainable progress in the current campaign; however, there is a requirement for further substantial growth (to an estimated endstrength of 240k) of COIN capable ANA troops in order to increase pressure on the insurgency in all threatened areas in the country. Current plans provide for a start date of Oct 2009 to commence an acceleration in growth through a combination of over manning and rapid force generation of ANA infantry and combat service support units. In order to generate the required numbers of "boots on the ground,' the emphasis will be on the development of maneuver units rather than enabler capabilities. The generation of previously planned and programmed enablers such as corps engineers, artillery, motorized quick reaction forces, and large support battalions will be deferred to enable a more rapid generation of maneuver forces that provide the operational capabilities required now. The forces generated during this phase will have sufficient training, capability and equipment to conduct effective COIN operations and to generate momentum. Tighter, restructured training programs will deliver an infantry-based, COIN capable, force in a shorter period of time with the capability of conducting "hold" operations with some "clear" capability while closely partnered with coalition forces. These forces will be equipped at a "minimally combat essential" level as determined by the Ministry of Defense, ISAF's operational requirements, and CSTC-A's ability to generate forces. Initially, facilities will be austere and temporary (including tented camps at the outset) in order to reduce construction timelines and cost.

Risks inherent in this approach such as inadequate training and a lack of organic enablers will be mitigated through close partnering and mentoring by Regional Commanders delivered through the ISAF Joint Command. More inexperienced leaders will be accepted into the junior officer and NCO ranks and the risk will be balanced by close partneringANSF with coalition forces. In time, a "rebalancing" and generation of enabling capabilities must occur as part of subsequent ANA growth to ensure that the ANA can achieve a degree of self-sufficiency, sustainable capability, and capacity. The growth of the ANA beyond 134k will be tailored to meet operational conditions on the ground and to create the required effects desired in the regions.

Finally, the Afghan National Army Air Corps will continue to grow and develop at a measured pace, given the long lead times required for the acquisition of aircraft and development of technical skills to operate and maintain the aircraft in the inventory. In the short term, the accelerated acquisition of additional Mi-17 airframes will enable greater lift capacity for the ANSF. In parallel, dedicated training of Mi-35 aircrews will add a rotary wing attack capability in the fall of 2009. Deliveries of the first C-27 aircraft in November 2009 will dramatically increase operational capability as the first crews are trained in March 2010.

ANP

The Afghan National Police has grown to a current force structure of approximately 84k and is several years behind the ANA in its development. Due to a lack of overall strategic coherence and insufficient resources, the ANP has not been organized, trained, and equipped to operate effectively as a counter-insurgency force. Promising programs to reform and train police have proceeded too slowly due to a lack of training teams. To enhance the AN P's capacity and capabilities, the Focused District Development (FDD) program must be accelerated to organize, train, equip, and reform police that have not yet completed a formal program of instruction, and new police forces such as the elite Afghan National Civil Order Police (ANCOP) must be generated to prepare the ANP properly to operate in this challenging COIN environment.

The ANP must increase in size in order to provide sufficient police needed to hold areas that have been cleared of insurgents, and to increase the capacity to secure the population. This assessment recommends further growth of the ANP to a total of 160k as soon as practicable with the right mix of capabilities that better satisfies the requirements of a counter-insurgency effort. This larger number of policemen also needs to be trained more quickly in order to "thicken" security forces in the districts, provinces, and regions. The numbers of Afghan Border Police (ABP) and Afghan National Civil Order Police (ANCOP) should also be considerably increased, and consideration should be given to expanding the Afghan Public Protection Force or other similar initiatives where appropriate.

In April 2009, a decision was made to grow the ANP by 4.8K to provide security for Kabul in advance of the Afghan National elections. This action was followed by second decision to further grow the police by 10K in order to enhance security in 14 key provinces for the upcoming elections. This 14.8K police growth is proceeding and will increase the ANP authorized strength to 96.8K while improving accountability of "non and above tashkiel" police.

Subsequent ANP growth to 160k will include doubling ANP strength at the District and Provincial levels, significantly increasing the police-to- population ratio. The growth of ANCOP will be accelerated by generating 5 national battalions in FY'10 followed by the generation of 34 new provincial battalions and 6 new regional battalions. While the number of ABP companies will remain the same, each ABP company will increase in strength by 65% to 150 men per company. Finally, the Afghan Public Protection Force (APPF) personnel will be absorbed into the ANP as it expands.

Over the 4 year program, special police growth will provide important niche capabilities. The national Crisis Response Unit (CRU) will provide Assault, Surveillance, and Support squadrons. Counter-Narcotics Aviation is projected to grow by over 100%. Afghan Special Narcotics forces grow by 25%. Security forces will also be provided to ensure international and non-governmental organizations' freedom of movement.

NATO Training Mission - Afghanistan (NTM-A)

On 12 June, 2009 the North Atlantic Council endorsed the creation of NATO Training Mission - Afghanistan (NTM-A) to oversee higher level training for the ANA and for development of the ANP. CSTC-A and NTM-A will co-exist as a single HQ with fully integrated staff sections under a dual-hatted commander. As approved by the North Atlantic Council, the NTM-A will stand up in mid-September to generate forces and provide institutional training for the ANA and ANP. Once the IJC is operational, the three NATO tasks assigned to NTM-A associated directly with providing NATO OMLTs and POMLTs to the ANA and ANP will migrate to the IJC. At that time, NATO/ISAF will redirect responsibilities for developing fielded ANSF to the IJC. NTM-A will retain responsibility for ANSF institutional training, education, and professional development activities. CJTF Phoenix and its two subordinate Brigades will be transferred to the IJC when it establishes Initial Operating Capability.

Key Stakeholder Engagement

This assessment recommends that the United States Government develop an engagement strategy to garner the international support and the multi-lateral approval required for the continued growth of the ANSF to the 400k target (240K ANA, 160K ANP). This includes the actions necessary to secure greater international funding to pay a fair share of the growth and sustainment costs of the ANSF, as well as generating the training teams required to support ANSF development. As a point of reference, the international community contributed $25M (-7%) of the cost of the expansion of the ANP by 14.8k earlier this summer. Furthermore, the European Commission requested a parallel study to recommend the character and end strength of ANP. When the EC study is completed, the findings will be reconciled to gain consensus in the international community about the way ahead.

A more cost effective way to procure capabilities for the ANSF

This initial assessment recommends that the OSD Comptroller fund CSTC-A directly, and allow CSTC-A to work directly with the appropriate contracting agency to procure required capabilities for the ANSF. The current system of executing Afghan Security Forces Funding (ASFF) must become more agile in the face of the requirement to adapt this program quickly. All procurement actions for the ANSF are handled as "pseudo" Foreign Military Sales Cases by the Defense Security Cooperation Agency (DSCA) and the United States Army Security Assistance Command (USASAC), each of which charge considerable fees for an "Above Standard Level of Service." These fees and the direct involvement of the DSCA apply to the procurement of most capabilities, including those that are executed by local contracting authorities as well as other actions not directly related to Foreign Military Sales such as construction. Direct authority to obligate ASFF without passing actions through the DSCA or USASAC will shorten timelines and preserve more money for the specific purpose of supporting the growth and sustainment of the ANSF.

Strengthen ANSF development through realigned C2

CSTC-A is responsible for three lines of operation: ministerial and institutional development; generation of the force; and develop the fielded force. This assessment concludes that the IJC should assume responsibility for developing the fielded force. The transfer of this mission will require the reassignment of CJTF Phoenix and its subordinate elements to the IJC. CSTC-A will retain the responsibility to train, advise, and educate personnel in the Afghan Ministries of Defense and interior, as well as those in the institutional elements of the Army and Police (national logistics, medical, facilities management, detainee operations, etc.). CSTC-A will also retain responsibility to resource the fielded ANSF.

Unity of effort and coherence in police development

In an effort to streamline police development efforts and to create greater unity of effort in the development of COIN capable police, the responsibility and authority for all police training should be placed under the commander CSTC-A/NTM-A. The Department of State's Bureau of International Narcotics and Law Enforcement (INL) should transfer responsibility for police training to CSTC-A. Since 2005, OSD has transferred funding to INL for developmental efforts of the ANP. CSTC-A will execute this mission and contract as appropriate for trainers with law enforcement experience to augment efforts by the IJC to develop fielded police, and to assist CSTC-A's actions for ministerial and institutional training.

Build and leverage Afghan ministerial capacity

CSTC-A should take every opportunity to build and leverage ministerial capacity to shift the responsibility for the long term sustainability of a larger ANSF to the Afghan Government. One opportunity is to find an appropriate legal and accountable way to allow the Afghan Ministries of Defense and Interior to contract for the construction of their own facilities. Today, more than 70% of all major construction projects in support of the ANA are at least 10% behind schedule. In response to this situation, CSTC-A and the Army Corps of Engineers have already standardized and reduced the scope of future projects to mitigate costs and delays. Additionally, CSTC-A will investigate the feasibility and practicality of providing discreet funding for Afghan Ministries to contract for the construction of their own facilities to drive lower costs and improve project timeliness. This process will also provide an opportunity to develop Afghan ministerial capacity. There are inherent risks in this approach but CSTC-A will develop a construct for this proposal with CENTCOM and OSD to ensure proper program management and the required oversight of funding provided to the Afghan ministries.

Recommendations

1. Grow the ANA to a target authorization of 240k. Accelerate the growth of the currently approved COIN focused infantry force of 134K by late 2010 and generate more counter-insurgency forces consistent with operational requirements.

2. Grow and develop the ANP to a total of 160k as soon as practicable to "thicken and harden" security in the districts, provinces, regions. This total will also more than double the size of Afghan Border Police, considerably grow ANCOP and allow for expansion of the Afghan Public Protection Force where appropriate.

3. Realign and streamline the responsibilities for ANSF generation and development:

    a. CSTC-A/NATO Training Mission-Afghanistan (NTM-A) focuses on ANSF force generation consistent with operational requirements, develops Afghan ministerial and institutional capabilities, and resources the fielded forces.
    b. Shift responsibility for development of fielded ANSF to the IJC.
    c. Employ enhanced partnering and mentoring to more rapidly develop Afghan forces.

4. Provide CSTC-A direct authority to obligate Afghan Security Forces Funding (ASFF) without passing actions through the Defense Security Cooperation Agency to shorten capabilities procurement timelines and avoid unnecessary fees.

5. Shift the responsibility and authority for execution of all police training from the Department of State's Bureau of International Narcotics and Law Enforcement (INL) to CSTC-A to enhance unity of effort in police development. CSTC-A will assume operational control of INL contracted trainers as soon as possible until January 2010 when a new contract managed by CSTC-A can begin.