ENGINEER COMBAT BATTALION (CORPS)(MECHANIZED)
DESIGNATION _______ ENGINEER BATTALION (COMBAT)(CORPS)(MECHANIZED)
TOE 05435L200 WHEN ORGANIZED WITH MECHANIZED ENGINEER COMPANIES
TOE 05435L300 WHEN ORGANIZED WITH MECHANIZED ENGINEER COMPANIES WITH GRIZZLY AND AVLB/WOLVERINE
1. MISSION.
A. TO INCREASE THE COMBAT EFFECTIVENESS OF THE CORPS BY
ACCOMPLISHING MOBILITY, COUNTERMOBILITY, LIMITED SURVIVABILITY,
AND GENERAL ENGINEERING TASKS.
B. TO REINFORCE THE HEAVY DIVISION, ENHANCED AND SEPARATE
HEAVY BRIGADES, AND ARMORED CAVALRY REGIMENTS.
C. TO PERFORM COMBAT MISSIONS IN THE ROLE OF INFANTRY,
WHEN REQUIRED.
D. PARTICIPATES IN JOINT MILITARY OPERATIONS.
2. ASSIGNMENT. TO A CORPS NORMALLY ATTACHED TO AN ENGINEER BRIGADE OR
ENGINEER GROUP.
3. CAPABILITIES.
A. AT LEVEL 1, THIS UNIT:
(1) PROVIDES COMMAND AND CONTROL AND STAFF SUPERVISION
FOR ASSIGNED AND ATTACHED UNITS.
(2) PROVIDES ENGINEER SUPPORT IN THE CONSTRUCTION OF
OBSTACLES AND DEFENSIVE POSITIONS.
(3) CONDUCTS LIMITED BREACHING OPERATIONS. THE ABSENCE
OF THE COMBAT ENGINEER VEHICLE (CEV) PRESENTS A SIGNIFICANT
REDUCTION IN THE ENGINEER COMMANDER'S ABILITY TO BREACH OBSTACLES
WHEN SUPPORTING BREACHING OPERATIONS. AT A MINIMUM, A MANEUVER
TASK FORCE WITH ONE ENGINEER COMPANY LOSES THE FULL ABILITY TO
REDUCE TWO LANES MECHANICALLLY, AS OUTLINED IN FM 90-13-1,
COMBINED ARMS BREACHING OPERATIONS. THIS DEFICIENCY WILL BE
CORRECTED ONCE THE GRIZZLY IS FIELDED.
(4) PROVIDES ENGINEER SUPPORT FOR BRIDGE CONSTRUCTION
AND ASSISTS IN THE CONSTRUCTION OF FLOATING BRIDGES.
(5) PERFORMS LIMITED GENERAL ENGINEERING TASKS SUCH AS,
CONSTRUCTION, REPAIR AND MAINTENANCE OR LANDING STRIPS, HELIPORTS,
COMMAND POSTS, COMBAT TRAILS, DRAINAGE STRUCTURES, FORDS AND OTHER
HORIZONTAL CONSTRUCTION TASKS WHEN AUGMENTED WITH A COMBAT SUPPORT
EQUIPMENT COMPANY, TOE 05423L000.
(6) PROVIDES TECHNICAL ADVICE, ASSISTANCE AND TRAINING
IN MINE WARFARE, FIELD FORTIFICATION, CAMOUFLAGE, DEMOLITION AND
ENGINEER RECONNAISSANCE TECHNIQUES.
(7) PROVIDES ENGINEER INFORMATION, RECONNAISSANCE AND
DEVELOPS ENGINEER INTELLIGENCE.
(8) FIGHTS AS INFANTRY IAW CHAPTER 6, FM 5-100,
ENGINEER OPERATIONS, WHEN REQUIRED.
(9) PROVIDES COMBAT ENGINEER SUPPORT FOR AN
INDEPENDENT TASK FORCE OR A JOINT MILITARY OPERATION, WHEN
REQUIRED.
(10) PARTICIPATES IN REAR AREA PROTECTION (RAP)
OPERATIONS WHEN REQUIRED.
(11) PROVIDES UNIT LEVEL MEDICAL SUPPORT BY PROVIDING
MEDICAL AIDMEN TO THE ENGINEER COMBAT PLATOONS.
(12) WHEN ORGANIZED UNDER TOE 05435L300, THIS UNIT CAN
EMPLACE AND MAINTAIN ASSAULT BRIDGES TO SPAN TWELVE 60-FOOT GAPS
SIMULTANEOUSLY.
B. THE COLUMNS UNDER LEVELS 2 AND 3 ADAPT THIS TABLE FOR REDUCED
OPERATIONAL CAPABILITIES IN DECREMENTS OF 10% FROM APPROXIMATELY
90% FOR LEVEL 2 TO APPROXIMATELY 80% FOR LEVEL 3.
C. THIS UNIT IS NOT ADAPTABLE TO TYPE B ORGANIZATION.
D. THE COLUMNS DESIGNED BY LEVEL 1 THROUGH 3 ARE DESIGNED TO
RELATE TO THE CATEGORIES ESTABLISHED BY AR 220-1, UNIT STATION
REPORTING.
E. INDIVIDUALS OF THIS ORGANIZATION, EXCEPT THE CHAPLAIN AND
MEDICAL PERSONAL, CAN ASSIST IN THE COORDINATED DEFENSE OF THE
UNIT'S AREA OR INSTALLATION.
F. UNIT MAINTENANCE: PERFORMS UNIT MAINTENANCE ON ORGANIC
EQUIPMENT.
G. DEPENDENCIES: THIS UNIT IS DEPENDENT UPON:
(1). APPROPRIATE ELEMENTS OF THE CORPS FOR, MAJOR HEALTH
SERVICES, LEGAL, FINANCE, PERSONNEL AND ADMINISTRATIVE SERVICES.
(2). ENGINEER MULTI-ROLE BRIDGE ROLE COMPANY
(TOE 05473L000) FOR TACTICIAL BRIDGING EQUIPMENT.
(3). ENGINEER COMBAT SUPPORT EQUIPMENT COMPANY
(TOE 05423L0) FOR AUGMENTATION WITH CONSTRUCTION EQUIPMENT TO
MOVE EARTH AND OTHER HORIZONTAL PROJECTS, SUCH AS ROADS AND
AIRSTRIPS.
4. BASIS OF ALLOCATION: TWO PER HEAVY DIVISION.
5. CATEGORY: THIS UNIT IS DESIGNATED A CATEGORY 1 UNIT.
(FOR UNIT CATEGORIES, SEE AR 310-25)
6. MOBILITY. FOR MOBILITY OF THE ORGANIZATIONAL COMPONENTS
OF THIS UNIT, SEE SECTION I, GENERAL, OF THE RESPECTIVE
TOE LISTED IN THE SECTION II OF THIS TOE.
7. DOCTRINE, THE FOLLOWING DOCTRINAL PUBLICATIONS ARE
APPLICABLE TO THE OPERATIONS OF THIS UNIT:
FM 5-71-100, DIVISIONS ENGINEERING COMBAT OPERATIONS
FM 5-100, ENGINEER COMBAT OPERATIONS
FM 5-100-15, CORPS ENGINEER OPERATIONS
FM 5-103, SURVIVABILITY
FM 5-104, GENERAL ENGINEERING
FM 5-105, TOPOGRAPHIC OPERATIONS
FM 5-116, ENGINEER OPERATIONS - EAC
FM 7-20, THE INFANTRY BATTALION
FM 71-100, DIVISION OPERATIONS
FM 90-7, COMBINED ARMS OBSTACLES INTEGRATION
FM 90-13, RIVER CROSSING OPERATIONS
FM 90-13-1, COMBINED ARMS BREACHING OPERATIONS
FM 100-5, OPERATIONS
FM 100-7, DECISIVE FORCE: THE ARMY IN THEATRE OPERATIONS
FM 100-15, CORPS OPERATIONS
FM 100-16, ARMY OPERATIONAL SUPPORT
JP 3-34, JOINT DOCTRINE FOR ENGINEER OPERATIONS (DRAFT)
JP 4-04, JOINT DOCTRINE FOR CIVIL ENGINEERING SUPPORT
-------------
\ ENGR CBT \
\ BN (CORPS)\
\ \
-------------
\
\
---------------------------------------------------------------
\ \
\ \
\ \
-------------- --------------
\ HQ & HQ CO \ \ 3 END CO \
\ \ \ \
\01 \ \ 02 \
-------------- --------------
TITLE
05435L300
ENGINEER BATTLION, CORPS (M)
EXECUTIVE SUMMARY
1. PURPOSE. The attached documentation represents the changes that
have occurred as a result of the cyclic review of the L-edition TOE.
As part of the cyclic review process, the TOE has been updated to
reflect current doctrine and operational concepts, to apply current
OPFAC rules, to demodernize the base TOE and to include the latest
BOIP in the objective TOE. This C-edition table was created as an
aid in reviewing all the changes that were made as a result of cyclic
review.
a. NEW TOE: NO PROJECTED E-DATE:
b. CYCLIC REVIEW: YES CURRENT E-DATE: 940405
c. AUTHORITY:
(1) ARSTRUC: No DATE: STR CAP:
(2) CSA FDU: NO DATE: STR CAP:
(3) AR 71-32: YES CTU DATE: 9904
d. This package pertains to:
NEW TOE MULTPR TITLE STR CAP
05436C300 HHC, Engr BN, CORPS (M) 161
05437C300 3 Engr Co, Engr Bn, Corps (M) 105
REPLACED TOE MULTPR TITLE STR CAP
05436L300 HHC, Engr BN, CORPS (M) 163
05437L300 3 Engr Co, Engr Bn, Corps (M) 105
e. Major Changes. As part of the cyclic review process, this
DTOE has been updated to reflect current standards of grade (SG),
manpower requirements criteria (MARC), basis-of-issue plans (BOIP),
and doctrine. No structural changes have been applied.
2. MISSION/CAPABILITIES/SECTION I.
a. Provides command and control, staff planning,
supervision, unit level administration and medical aidmen, and an
engineer special staff section for the maneuver Brigades.
b. See TOE Section 1 for a complete list of capabilities and
limitations of this organization and it subordinate units.
3. ASSIGNMENT. TO A CORPS NORMALLY ATTACHED TO AN ENGINEER
BRIGADE OR ENGINEER GROUP.
4. PERSONNEL.
a. Differences between design and documented OTOE requirements
where the design OTOE equals the unit strength CAP.
TOE DESIGN DOCUMENTED DIFFERENCE
05436L300 163 161 -2
05437L300 105 105
b. MARC Deviations. NONE.
c. Detailed rationale for doctrinal personnel requirements is in
the accompanying TOE Analysis--Narrative Discussion.
d. No net officer and one NCO loss force impact of this TOE.
e. The risk resulting from decrements is negligible.
5. EQUIPMENT.
a. Equipment reflected in this TOE represents the minimal
essential wartime requirements.
b. The following items of modernization equipment were approved
by HQDA for inclusion in the Base TOE and have been applied:
BOIP LIN NOMENCLATURE AUTHORITY
T013AD T61494 HMMWV TWVRMO
c. Major items of equipment in each TOE are:
TOE BTOE OTOE
05436C300 Boat, Recon(B84404) 1 1
M577(D11538/C11158) 2 2
M113(D12087/C18234) 1 1
Steam Cleaner 1 1
M88 3 3
S250 Shelter(T07543) 1 0
Contact Trk(T10138/T07679 3 3
Org Rep Lt Trk 1 1
HMMWV 14 15
POL Tankers(5T/T87243) 7 4(HEMTT)
Common #1 4 4
Trl, 3/4T(W95537) 2
Trl, 1 1/2T(W95811) 26 0
Water Trl 3 3
Trk, 2 1/2T(X40009/X40146) 18 0
Trk, 5T(X40831) 15 0
Forklift(X48194/Z94028) 1 1
Wrecker 5T 3 3(HEMTT)
Welding Shop 1 1
Field Kitchen 0 2
Sanitation Ctr 0 2
Trl, Flt 11T(T45465) 0 3(HEMAT)
Trk, LMTV 0 18
Trk, HEMTT(T59278) 0 7
Trl, LMTV(Z36068) 0 11
Trl, 3/4T (Z36272) 0 3
M1097(Z65205) 0 3
05437C300 Boat Recon 2 2
M113 9 9
Bridge 4 4
Trk, MET 4 0
HMMWV 6 6
Dozers 6 0
Bolster Trl 2 2
Trl, 1 1/2T 9 6
Trk, 2 1/2T 1 0
Trk, 5T Dump 4 0
M578 0 2
Volcano 0 2
SEE 0 2
HEMTT 0 2
LMTV 0 1
ACE 0 6
Trl, LMTV 0 3
MICLIC (L67342) 0 4
MTV, DUMP 0 4
JAVELIN 0 3
6. COST.
a. Cost Analysis Summaries for each Objective TOE are provided
below.
b. Force structure information for each TOE is based on current
M-Force and E-Date 9904.
c. HQDA approved commodity consumption rates were used in the
development of these TOEs and are reflected in the Cost Analysis
Summaries.
d. The difference in cost are primarily due to the increased
requirement for equipment. A review of the MARC application also
reduced the number of personnel.
7. Cost Analysis Summaries.
NEW TOE OLD TOE DELTA
NUMBER 05435C300 05435L300
TITLE ENG BN, CORPS (M) ENG BN, CORPS (M)
PERSONNEL IMPACT BY: OFF/WO/NCO/ENL/AGGR)
OTOE STR 28/01/164/283/476 28/01/165/284/478 00/00/-1/-1/-2
UNIT BY COMPO: (1/2/3/4/AGGR)
2/0/3/0/5 2/0/3/0/5
FORCE IMPACT BY COMPO:
OFF/WO: 58/0/58/00/116 58/0/58/00/116 00/00/00/00/00
NCO: 328/0/492/0/820 330/0/495/0/825 -2/00/-3/00/-5
COSTS:
PERSONNEL: $14,678,293 $14,634,030 $ 44,263
EQUIPMENT: $79,312,080 $79,393,343 $ 81,263-
TOTALS: $94,481,340 $94,426,344 $ 54,996
NEWSLETTER
|
Join the GlobalSecurity.org mailing list
|
|