Appendix C
Sample Reconnaissance OPORD
A sample reconnaissance OPORD is shown in Figure C-1.
Figure C-1. Sample reconnaissance OPORD
______________________
OPERATION ORDER 97-11
Time Zone Used Throughout The Order: Local Task Organization:
1. SITUATION. ______________________ |
Figure C-1. Sample reconnaissance OPORD (continued)
______________________
(b) The only cover from both direct and indirect fires is provided by the undulating terrain previously mentioned. Concealment during movement can be enhanced by traveling parallel to the intervisibility lines when available. The dusty and windy conditions may make mounted movement less detectable by the enemy. (c) The pipeline running parallel to the LD along the 30 easting is the only existing obstacle in the AO. Crossing points for this pipeline have been identified at NK 302215 and NK 295090. (d) The terrain in the vicinity of the templated obstacle system is believed to be unsuitable for minefield reduction by MCBs because of the undulating terrain and the soil composition.______________________ |
Figure C-1. Sample reconnaissance OPORD (continued)
______________________
The enemy is not nuclear capable. Expect the enemy to use dismounted strong points to tie its obstacles into the restricted terrain at vicinities NK 450210 and NK 440100. These dismounted forces will be supplied with AT-5s to assist in their mission of preventing the obstacle system from being reduced along the walls of the valley. Additionally, the enemy will use dismounted patrols to protect all minefields. (c) The templated obstacle system is included on the SITEMP. No confirmed obstacle locations have been obtained as of 080100 JAN. We expect the enemy to continue to lay its minefields similar to the method used throughout the campaign. We expect the enemy to mechanically lay its minefields and expect each minefield to be comprised of SB-MV mines and be 200 to 300 meters long and 60 to 120 meters deep. The mine spacing has consistently been 4.5 meters and the depth of the mines have been up to 9 inches. NOTE: The SB-MV is magnetic-influence initiated and must be detected by probing. Operating hand-held mine detectors may detonate the mine. If mines are surface laid, it is probably due to the soil conditions and indicates the probable success of using MCBs. The enemy has routinely used a single-strand of concertina fence on the enemy side of the minefield as a frat fence. The enemy is expected to emplace a total of 15 minefields in its defense.b. Friendly Forces. (1) Higher. (a) 1st Brigade plans to conduct a brigade breaching operation and penetrate the northern MRP of the northern MRC as shown on the SITEMP. Other brigade recon assets include two COLTs and one chemical recon vehicle. The planned locations for each of these assets are shown on the maneuver graphics. (b) Engineer recon team 1 is attempting to answer the brigade commander's PIR for location, composition, and orientation of the enemy's obstacles. (c) If bypasses of the enemy obstacles can be located, the brigade commander would prefer to bypass the obstacles as close to the north wall as possible. (2) Lower. Do not expect TF recon assets to cross the LD before EENT on 9 JAN 97. 2. MISSION. The 99th Engineer Battalion conducts an area recon of NAI 301 NLT 082000 JAN 97 to facilitate the brigade's attack at 110500 JAN 97. 3. EXECUTION. Intent. The purpose of this mission is to identify enemy obstacles within NAI 301 to confirm or deny the enemy's COA and facilitate breaching operations. The end state is the identification of enemy obstacles in NAI 301 NLT 100500 JAN 97 and recon team 1 in position at checkpoint (CP) 15 ready to link up and guide the breach force to the obstacle location NLT 110001 JAN 97. ______________________ |
Figure C-1. Sample reconnaissance OPORD (continued)
______________________
a. Concept of Operation. The battalion conducts an obstacle-oriented area recon. Recon team 1 will cross the LD NLT 082000 JAN. The brigade will have at least two batteries ready to provide indirect fires out to PL Celtics throughout the recon effort, and the attack helicopter battalion (AHB) will support casualty evacuation. Team 1 will cross the LD about 24 hours before the TF scouts in an attempt to observe the enemy emplacing obstacles while the TF is still planning its R & S effort. The recon team will link up with TF 1-23 scouts (who will provide security) before conducting obstacle recon. Recon team 1 will complete its area recon of NAI 301 NLT 100500 JAN to facilitate mounted rehearsals by the brigade during daylight hours on 11 JAN 97. Recon team 1 will continue to observe NAI 301 until 101700 JAN and report any further engineer activity. At 101800 JAN 97, recon team 1 will move to CP 15 and be in position NLT 110001 JAN 97, prepared to link up and guide the breach force to the obstacle location. b. Tasks to Subordinate Units. (1) Battalion's TOC. The battalion's TOC will-- (a) Provide liaison personnel to colocate with the recon team until they cross the LD and ensure that liaison personnel obtain a copy of the recon team's maneuver graphics. (b) Coordinate the recon team's indirect fire plan with the FSO and confirm targets with the team leader once they are coordinated. (2) Battalion S4. The battalion S4 will obtain the current logistical status of recon team 1. He will ensure that unit basic load (UBL) levels are reestablished NLT 081200 JAN 97 and report to the TOC upon completion. (3) A/99 En Bn. A/99 En Bn will conduct liaison activities between recon team 1 and TF 1-23 according to the battalion's TACSOP. (4) Recon team 1. Recon team 1 will-- (a) Report the current logistical status to the S4 NLT 080800 JAN 97. (b) Backbrief the plan to the battalion commander via FM radio at 081300 JAN 97. (c) Provide TF 1-23 the team's graphics, via the A/99 En Bn's TOC before crossing the LD. (d) Forward requested indirect-fire targets to the battalion's TOC NLT 081600 JAN 97. (e) Coordinate link up with the TF 1-23 scouts for security during obstacle recon. (f) Conduct an area recon of NAI 301 NLT 082000 JAN 97 to verify the composition of obstacles within the NAI. ______________________ |
Figure C-1. Sample reconnaissance OPORD (continued)
______________________
c. Coordinating Instructions. (1) Task organization is effective upon receipt of this order. (2) All units will participate in the intelligence updates to occur at 0800 and 2000 each day. (3) The LOA for recon assets is PL Celtics. 4. SERVICE SUPPORT. a. Support Concept. (1) The recon team will cross the LD fully uploaded according to the battalion's TACSOP. These supplies will come from the engineer battalion. This basic load is expected to sustain the team throughout the mission. (2) Emergency resupply will be coordinated through the engineer battalion's TOC and delivered by aviation assets. Backup resupply will be through TF 1-23. b. Medical Evacuation and Hospitalization. The primary means of MEDEVAC is by air (requested through the battalion's TOC); backup is by ground evacuation (performed by TF 1-23). c. Personnel Support. EPWs will be turned over to TF 1-23 for evacuation to the rear. 5. COMMAND AND SIGNAL. a. Command. The chain of command is the commander, the XO, the S3, and the commander of C Company. b. Signal. (1) All traffic from recon team 1 to the battalion's TOC will be over MSRT (primary) or the battalion's command net (alternate). (2) The recon team's current location will be sent by the battalion's TOC to TF 1-23. (3) OBSTINTEL will be reported according to the TACSOP. ACKNOWLEDGE: PATTON OFFICIAL: (Authentication) ______________________ |
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|