RDL Homepage |
Table of Contents |
Document Information |
Download Instructions |
Systematic Clearance
3. Execution
a. Concept of Operation:
(2) Fires. 155m prep on Bldgs SS2, UU1, T3, R1, and S1 to be fired on order; smoke and WP planned on Bldg SS2. Priority of fires to Tm A initially.
(2) Spt T C mvmnt into Block KK by fire from Bldg II12.
(3) Clear Bldg SS2 with minimal damage.
(4) Be prep to spt continuation of atk of Co B from vic Bldg SS2.
(5) On order secure west wide of bridges.
(2) Be prep to spt seizure of west side of bridges by fire from Block T.
(3) Assist engineers in checking railroad bridge for explosives.
(2) Inspect entrances/exits of manholes to underground sewer system in our zone.
(3) Be prep to screen TF right flank from rear of Tm A to LD.
f. Hv Mort Plt: GS; init vic Marshall Junior High School; displaces fwd on order
g. Redeye Sec: GS, priority to CP, Cbt Tns, Tm A, and Tm C.
h. Reserves:
(b) Be prep to pass thru Tm A vic Broadway and seize Bldgs R1 and S1.
(c) Cont atk to secure west and of bridges on order.
(d) Be prep to assist in seizure and clearance of Bldg SS2.
(b) On order assist Sct Plt in clearing underground psg in zone.
(c) Maintain contact with Tm C and occupy most recently cleared blocks.
(2) Tm A has control of 9th Street.
(3) Report crossing all streets and/or phaselines.
(4) MOPP Status is I.
(5) Wpns Tight.