RDL Homepage |
Table of Contents |
Document Information |
Download Instructions |
3. Execution
a. Concept of Operation:
1st Plt and 3d Plt abreast to seize the Bldgs 8 and 9, respectively; Tank plt will support by fire vic 789759.
(2) Fires. Priority of fires to 1st Plt initially; HE with fuze VT and smoke will be fired on a line from CP1 to CP10049755 to 040800. Dual purpose ICM rds will be fired on the center of OCKSTADT commencing 040800. Bn Hv Mort Plt will continue firing smoke screen between CP1 and CP10 until lifted by FIST Chief.
(2) Be prepared to assist 3d Plt in seizure of Bldgs 7, 9, 29 to 31, 36, and 37.
(3) On order seize Bldg 32, then 33 to 35.
(4) Assist in passage of Tm's TANK and A.
(2) Support 1st Plt's seizure of buildings south of road from Bldgs 30 and 31.
(3) Be prepared to assist in passage of Tm's A and TANK thru CP1.
(2) On order move fwd vic Bldg 9 to support clearance of Bldgs 29 to 37.
(2) Mort Sec: GS; OCC init vic 783761; displace fwd on order.
g. Coordinating Instructions:
(2) Use traveling technique to RP.
(3) At RP we will meet guides from TF 2-79 who will guide us to attack position vic 785761.
(4) Signal for cleared Bldgs is Red X.
(5) Consolidation and Reorganization.
(b) Tank Plt occupy hide positions on west side of Bldgs 29 to 31 and move forward to support on order.
(c) AT Sec occupy firing positions gic Bldg 8 on order.
(d) Cmd Gp will occupy Bldg 31.
(7) Dismouunted in wooded areas south of Bldg 9.
(8) Be prepared to leave a minimum of one man to secure each Bldg cleared in zone.
(9) Bldg 29 is contact point for coordination with Tm A; Bldg 34 for Tm TANK.