UNITED24 - Make a charitable donation in support of Ukraine!

Intelligence


Tactical Flag Command Center (TFCC)/Joint Operations Center

 (JOC)/Flagplot

Primary Purpose Support OTC/CWC planning and resource management.

Also supports battle management in the

execution phase.

Sub-Functions Officer in Tactical Command (OTC)/ Composite

Warfare Commander (CWC) battle action. One of

nearly 10 C2I components/configurations to

operate under GCCS-M.

Equipment Requirements CV's and CVN's (TFCC) and LHD's (Flagplot): five

Tactical Advanced Computer (TAC) III's or IV's

used with two projection screens or 37"-42"

monitors. The video configuration is being

updated on the carriers. Recent installations

have replaced the projection screens/monitors

with 2 X 8 color large screen display video

walls. LCC's (JOC): seven each 37" monitors,

Dimension 2000 briefing system, 10 NT clients.

Connectivity Requirements Operates within GCCS-M Ethernet/ATM LAN.

Crypto Requirements Employs variety of crypto devices (KG-84A/C,

KGR-96, KG-81, and KG-194) prior to multiplex

transmission.

Normal Locations All major fleet command ships (CV's, CVN's, LHD's

and LCC's).

Information Managed Ship movements/positions. SIGINT Displays, OTH

radar displays tracked via the GCCS-M, weather,

etc.

Products Created No unique products created. Acts as the work

center registering information for the OTC/CWC

through TBMCS, JOTS, GCCS-M and GCCS-M NT PC

network.

Lead Service/Contractor Lead Service/Contractor: The principle contractor

VARIES according to platform. Lead

Service/Contractor: SPAWAR Systems Center

Charleston, SC (Detachment, Norfolk, VA). DSN

961-6781; FAX DSN 396-0603.

Current Fielding Status TFCC/JOC/Flagplot components virtually unlinked

to other C4I systems prior to 1993. TFCC began

operation in the LAN environment Naval Tactical

Control Systems-Afloat (NTCS-A) in 1993 and

evolved to current GCCS-M UNIX and NT Networks.

Known Problems Unaware of any significant problems with TFCC

technical operations.

DIICOE Compliance Rating Not rated as a separate system (Tied to GCCS-M,

which is level 5 compliant).

Point of Contact Point of Contact: Mr. Steven F. Kelly, SPAWAR

Systems Center. Comm. (757) 559-6781; fax (757)

396-0603. DSN 961-6781; fax 396-0603.

Updated by Captain Howard F. Hall, USMC, CCSC-01

BACK



NEWSLETTER
Join the GlobalSecurity.org mailing list