Qom (Ghom)
Digital Globe Imagery January 2009
A preliminary examination of the spoils piles and the excavations suggests that this is a cut and fill site, rather than a series of entrances to deeply buried tunnels. A cut is a man-made feature resulting from cutting through raised ground, usually to form a level bed for a road, railroad track, or other construction. A fill is a man-made feature resulting from filling a low area, such as to form a level bed for a road or railroad track, or to fill in the excavation cut to emplace a hardened underground facility. |
|
|
![]() |
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|