Find a Security Clearance Job!

Military


KAPAL PATROLI CEPAT 57 METER (KPC Fast Patrol Boat)

Some hull sections and equipment were built in Germany and assembled in Indonesia. Used mainly for SAR; 814 also serves as presidential yacht. The Andau (PB 57 Mk II) class ASW patrol boats are an upgraded version of the previous class. Some hull sections and equipment were built in Germany and assembled in Indonesia. The Todak (PB 57 Mk V) class large patrol boats are a development of the previous classes. There is some confusion among sources as to how the individual units of this class are distributed among the five variants, as in, Hazegray ignores the existence of the Nav III variant. The present breakdown reflects the information on the builder's website. But the images from PAL, the builder, may not be entirely reliable, as the aviation outfit reported by Hazegray is missing in the Nav I picture, but present in the Nav IV picture.

KAPAL PATROLI CEPAT 57 METER - NAV I
Owner TNI AL
Total Production 2 Unit
Delivery 1988
Specifications
Length Overall 58,10 m
Length Waterline 54.20 m
Breadth 7.62 m
Depth 4.75 m
Speed Max 30 knots
Displacement 454 Ton
Complement 42 persons
Main Engine 2 X 4130 HP
Armament1 40 mm, 2 7.62 mm MG
Aviation aft helicopter platform for 1 NBO-105 helicopter

KAPAL PATROLI CEPAT 57 METER - NAV II
Owner TNI AL
Total Production 2 Units
Delivery 1988 & 1989
Specifications
Length Overall 58,10 m
Length Waterline 54.20 m
Breadth 7.62 m
Depth 4.75 m
Speed Max 30 knots
Displacement 454 Ton
Complement 42 persons
Main Engine 2 X 4130 HP
Armament 1 57mm/70cal DP, 1 40 mm, 2 20 mm, 2 21 inch torpedo tubes

KAPAL PATROLI CEPAT 57 METER - NAV III
Owner TNI AL
Total Production 3 Units
Delivery 1989, 1992 & 1995
Specifications
Length Overall 58,10 m
Length Waterline 54.20 m
Breadth 7.62 m
Depth 4.75 m
Speed Max 30 knots
Displacement 454 Ton
Complement 42 persons
Main Engine 2 X 4130 HP
Armament

KAPAL PATROLI CEPAT 57 METER - NAV IV
Owner TNI AL
Total Production 1 Unit
Delivery 1992
Specifications
Length Overall 58,10 m
Length Waterline 54.20 m
Breadth 7.62 m
Depth 4.75 m
Speed Max 30 knots
Displacement 454 Ton
Complement 42 persons
Main Engine 2 X 4130 HP
Armament1 57mm/70cal DP, 1 40 mm, 2 20 mm

KAPAL PATROLI CEPAT 57 METER - NAV V
Owner TNI AL
Total Production 4 Unit
Delivery 2000, 2002 & 2003
Specifications
Length Overall 58,10 m
Length Waterline 54.20 m
Breadth 7.62 m
Depth 4.75 m
Speed Max 30 knots
Displacement 454 Ton
Complement 42 persons
Main Engine 2 X 4130 HP
Armament 1 57mm/70cal DP, 1 40 mm, 2 20 mm

Kapal Patroli Cepat 57 Meter / Fast Patrol Boat - Nav I Kapal Patroli Cepat 57 Meter / Fast Patrol Boat - Nav II Kapal Patroli Cepat 57 Meter / Fast Patrol Boat - Nav III Kapal Patroli Cepat 57 Meter / Fast Patrol Boat - Nav IV Kapal Patroli Cepat 57 Meter / Fast Patrol Boat - Nav V




NEWSLETTER
Join the GlobalSecurity.org mailing list