HMCS Arctic/Offshore Patrol Ship (AOPS)

sourceSTX Europe
date23/06/2009
LOA 109.6 m
LWL 101.1 m
LBP 98.6 m
BOA 18.2 m
BWL 17.6 m
T 7.0 m
Displacement 6940 ton
Volume 6771 m3
Wetted Surface 2323 m2
Midship area 113.9 m2
Waterplane area 1529 m2
LCB (aft of FP) 49.7 m
PropulstionDiesel electric Azipod propulsion system provides the best ice capability and operational flexibility
  • 2 x 7500 kW pods
  • 4 x 4500 kW diesel gensets
  • Full propulsion system redundancy
  • Armament Primary gun weapons (20-40 mm).
  • 40 mm gun selected for
    Definition Design

    Small calibre gun(s) for self protection.
  • 12.7 mm guns selected for
    Definition Design.
  • Schedule
    Treasury Board
    Preliminary Project Approval (PPA):
    31 May 2007
    Release of Definition, Engineering, Logistics and Management Support Request for Proposals (DELMS RFP): 13 December 2007
    DELMS RFP Closes: 19 February 2008
    DELMS Contract Awarded: 7 May 2008
    Effective Project Approval: 2012
    Award of Implementation Contract: 2012
    Delivery of First Ship: 2015
    Initial Operating Capability of First Ship: 2016
    Delivery of Last Ship: 2021