PREFACE | ||
PART ONE | TERMINAL ORGANIZATIONS, FACILITIES, AND VESSELS | |
CHAPTER 1 | AN OVERVIEW OF TERMINAL OPERATIONS | |
Section I. Overview | ||
1-1. | INTRODUCTION | |
1-2. | TYPES OF TERMINAL OPERATIONS | |
1-3. | TERMINAL ORGANIZATIONS IN THE CONTINENTAL UNITED STATES | |
1-4. | TERMINAL ORGANIZATIONS IN A THEATER OF OPERATIONS | |
1-5. | RESPONSIBILITIES OF THE MILITARY SEALIFT COMMAND | |
1-6. | RELATIONSHIPS BETWEEN TERMINAL UNITS AND MILITARY SEALIFT COMMAND SHIPS | |
1-7. | RESPONSIBILITY FOR CLEANING CARGO SPACES | |
Section II. Strategic Sealift Ships | ||
1-8. | MISSION OF THE STRATEGIC SEALIFT SHIPS | |
1-9. | ORGANIZATIONAL OVERVIEW | |
1-10. | MILITARY SEALIFT COMMAND | |
1-11. | MILITARY TRAFFIC MANAGEMENT COMMAND | |
1-12. | DEPLOYING UNITS | |
1-13. | SUPERCARGO PERSONNEL | |
1-14. | CARGO MAINTENANCE CREW | |
CHAPTER 2 | HARBOR FACILITIES AND VESSELS | |
Section I. Overview | ||
2-1. | INTRODUCTION | |
2-2. | SHIPBOARD DIRECTIONS | |
2-3. | CARGO COMPARTMENTS | |
2-4. | US MARITIME ADMINISTRATION CLASSIFICIATION SYSTEMS | |
2-5. | SHIPPING CATEGORIES | |
2-6. | SEALIFT ENHANCEMENT FEATURES PROGRAM | |
2-7. | READY RESERVE FORCE | |
Section II. T-AKR 295 and 296 Class Ship Configurations | ||
2-8. | GENERAL SHIP CHARACTERISTICS | |
PART TWO | GEAR AND EQUIPMENT | |
CHAPTER 3 | SHIP'S GEAR AND RIGGING PROCEDURES | |
Section I. Ship's Gear | ||
3-1. | INTRODUCTION | |
3-2. | CHAINS, HOOKS, AND SHACKLES | |
3-3. | RIGGINGS AND DECK FITTINGS | |
3-4. | TYPES OF WINCHES | |
3-5. | WINCH OPERATION | |
3-6. | SIGNALS USED IN WINCH OPERATIONS | |
Section II. Rigging Procedures | ||
3-7. | RIGGING STANDARD CARGO BOOMS | |
3-8. | TOPPING BOOMS | |
3-9. | LOWERING BOOMS | |
3-10. | RIGGING SYSTEMS | |
3-11. | RIGGING HATCH TENTS | |
3-12. | RIGGING SAVE-ALLS | |
3-13. | RIGGING STANDARD BOOMS FOR HEAVY LIFTS | |
3-14. | HEAVY-LIFT BOOMS | |
3-15. | MODERN JUMBO BOOMS | |
3-16. | SINGLE SWINGING BOOM | |
3-17. | YARD-AND-STAY RIG WITH DOUBLE PURCHASE | |
3-18. | BLOCK-IN-BIGHT RIGGING ON DOUBLE-RIGGED HATCH | |
3-19. | FOUR BOOMS DOUBLED UP ON DOUBLE-RIGGED HATCH | |
3-20. | HAGGLUNDS CRANE | |
3-21. | HAND SIGNALS FOR HAGGLUNDS CRANE OPERATION | |
CHAPTER 4 | CARGO-HANDLING GEAR | |
4-1. | INTRODUCTION | |
4-2. | GENERAL-PURPOSE GEAR | |
4-3. | SPECIAL-PURPOSE GEAR | |
4-4. | CARGO-HANDLING AIDS | |
4-5. | CARE OF CARGO-HANDLING GEAR | |
CHAPTER 5 | MATERIALS-HANDLING EQUIPMENT | |
5-1. | INTRODUCTION | |
5-2. | FORKLIFT TRUCKS | |
5-3. | TRACTORS, TRAILERS, AND HAND TRUCKS | |
5-4. | PALLET JACKS | |
5-5. | CRANES | |
5-6. | HELICOPTER POSITIONING DOLLY | |
5-7. | CONTAINER HANDLERS | |
CHAPTER 6 | BLOCK AND TACKLE, WIRE ROPE, AND MARLINESPIKE SEAMANSHIP | |
Section I. Blocks and Tackles | ||
6-1. | INTRODUCTION | |
6-2. | COMPONENTS OF WOODEN BLOCKS | |
6-3. | COMPONENTS OF METAL BLOCKS | |
6-4. | TYPES OF BLOCKS | |
6-5. | SIZES OF BLOCKS | |
6-6. | MAINTENANCE OF METAL BLOCKS | |
6-7. | TACKLE USES AND TYPES | |
6-8. | REEVING TACKLES | |
6-9. | MECHANICAL ADVANTAGE | |
6-10. | FRICTION | |
6-11. | BREAKING STRESS AND SAFE WORKING LOAD | |
Section II. Wire Rope | ||
6-12. | CARE AND USE OF WIRE ROPE | |
6-13. | MAKEUP OF WIRE ROPE | |
6-14. | CLASSIFICATION | |
6-15. | MEASUREMENT | |
6-16. | SAFE WORKING LOAD AND BREAKING STRENTH | |
6-17. | INSPECTION OF WIRE ROPES | |
6-18. | HANDLING | |
Section III. Marlinespike Seamanship | ||
6-19. | CHARACTERISTICS AND FIBER LINE | |
6-20. | CORDAGE | |
6-21. | INSPECTION OF LINES | |
6-22. | UNCOILING NEW LINE | |
6-23. | WHIPPING LINE | |
6-24. | KNOTS, BENDS, AND HITCHES | |
6-25. | SPLICING THREE-STRAND FIBER LINE | |
6-26. | PUTTING AN EYE IN WIRE ROPE | |
PART THREE | OCEAN TERMINAL OPERATIONS | |
CHAPTER 7 | PRESTOWAGE PLANNING | |
Section I. Terms and Factors | ||
7-1. | INTRODUCTION | |
7-2. | VESSEL TONNAGE TERMS | |
7-3. | STOWAGE PLANNING FACTORS | |
7-4. | STABILITY | |
7-5. | STOWAGE AND CAPACITY BOOKLET | |
7-6. | VESSEL DEAD WEIGHT SCALE | |
7-7. | WEIGHT DISTRIBUTION | |
7-8. | TRIM TABLE | |
Section II. Steps in Prestow Planning | ||
7-9. | OVERALL CARGO LOAD PLANNING | |
7-10. | DELIVERING CARGO TO SHIPSIDE | |
7-11. | FACILITY REQUIREMENTS (T-AKR 295/296 CLASS SHIPS | |
7-12. | LOADING TIME | |
7-13. | CARGO LOADING ORDER (T-AKR 295/296 CLASS SHIPS | |
7-14. | FINAL STOWAGE PLAN | |
Section III. Cargo Stowage Plan | ||
7-15. | ONVENTIONAL CARGO VESSELS | |
7-16. | BREAK-BULK VESSEL STOWAGE PLANS | |
7-17. | CONTAINER VESSEL STOWAGE PLAN | |
7-18. | DISCHARGE PLANNING | |
7-19. | DISCHARGE OVER WHARVES | |
7-20. | BERTH ASSIGNMENT | |
7-21. | EQUIPMENT REQUIREMENTS | |
7-22. | CARGO CLEARANCE TRANSPORTATION REQUIRMENTS | |
CHAPTER 8 | LOADING AND DISCHARGING CARGO VESSELS | |
Section I. Loading General Cargo | ||
8-1. | INTRODUCTION | |
8-2. | ADMINISTRATIVE LOADING | |
8-3. | CARGO-HANDLING OPERATIONS | |
8-4. | STOWAGE OF DIFFERENT TYPES OF CARGO | |
8-5. | GENERAL RULES FOR STOWING CARGO | |
8-6. | SECURING OF CARGO | |
8-7. | LASHING AS A MEANS OF SECURING | |
8-8. | SECURING DECK CARGO | |
8-9. | DUNNAGE | |
8-10. | OTHER MEANS OF SECURING CARGO | |
Section II. Discharging Break-Bulk Cargo | ||
8-11. | DECK CARGO | |
8-12. | CARGO IN HOLDS | |
8-13. | TERMINAL CLEARANCE | |
8-14. | CARGO TALLYING METHODS | |
8-15. | TALLYING BREAK-BULK CARGO | |
8-16. | TEMPORARY HOLDING AREAS | |
8-17. | CARGO DAMAGE AND LOSS | |
8-18. | CARGO SECURITY | |
8-19. | SAFETY | |
Section III. Loading Phase of RO/RO Operations | ||
8-20. | RO/RO SYSTEM | |
8-21. | RO/RO VEHICLE OPERATIONS PROCEDURES | |
8-22. | LIFT-ON OPERATIONS | |
8-23. | AFT SECTION LIFT-ON OPERATIONS | |
8-24. | MIDSECTION LIFT-ON OPERATIONS | |
8-25. | FORWARD SECTION LIFT-ON OPERATIONS | |
8-26. | ROLL-ON OPERATIONS | |
8-27. | ROLL-ON LOADING SEQUENCE | |
8-28. | TRAFFIC CONTROL | |
8-29. | STOWAGE OF VEHICLES WITHIN FIRE LANES | |
8-30. | RAMP PROBLEMS DUE TO TIDES | |
Section IV. Discharge Phase of RO/RO Operations | ||
8-31. | ROLL-OFF OPERATIONS | |
8-32. | LIFT-OFF OPERATIONS | |
Section V. Cargo Operations for T-AKR 295 and 296 Class Ships | ||
8-33. | CARGO OPERATIONS (T-AKR 295 AND 296 CLASS SHIPS) | |
8-34. | RO/RO OPERATIONS (T-AKR 295 CLASS) | |
8-35. | DUAL RAMP OPERATIONS (T-AKR 295 CLASS) | |
8-36. | SINGLE RAMP OPERATIONS (T-AKR 295 CLASS) | |
8-37. | SINGLE RAMP OPERATIONS FROM THE STERN RAMP | |
8-38. | SINGLE RAMP OPERATIONS FROM THE SIDE PORT RAMP | |
8-39. | LO/LO OPERATIONS (T-AKR 295 CLASS) | |
8-40. | RO/RO OPERATIONS (T-AKR 296 CLASS) | |
8-41. | DUAL RAMP OPERATIONS FROM STERN RAMP | |
8-42. | DUAL RAMP OPERATIONS FROM THE SIDE PORT RAMP | |
8-43. | SINGLE RAMP OPERATIONS (T-AKR 296 CLASS) | |
8-44. | LO/LO OPERATIONS (T-AKR 296 CLASS) | |
CHAPTER 9 | SECURING, LOADING, AND STOWING HAZARDOUS CARGO | |
9-1. | FUNDAMENTAL SECURING PROCEDURES | |
9-2. | PRELOAD SECURING | |
9-3. | LOADING PROCEDURES | |
9-4. | TYPES OF STOWAGE | |
9-5. | STOWAGE GROUPS | |
9-6. | BOMB AND MISSILE STOWAGE PROCEDURES | |
9-7. | SECURING STRUCTURES | |
CHAPTER 10 | SPECIAL CARGO-HANDLING OPERATIONS | |
10-1. | INTRODUCTION | |
10-2. | LOGISTICS OVER-THE-SHORE OPERATIONS | |
10-3. | LASH AND SEABEE OPERATIONS | |
10-4. | BLOCKING AND BRACING ABOARD LIGHTERS | |
CHAPTER 11 | SAFETY IN TERMINAL OPERATIONS | |
11-1. | INTRODUCTION | |
11-2. | VESSEL ACCESS | |
11-3. | OPENING AND CLOSING HATCHES | |
11-4. | VESSEL WORKING SURFACE | |
11-5. | SHIP'S GEAR | |
11-6. | OTHER GEAR AND EQUIPMENT | |
11-7. | HANDLING CARGO | |
11-8. | GENERAL WORKING CONDITIONS | |
CHAPTER 12 | STUFFING THE CONTAINER | |
12-1. | INTRODUCTION | |
12-2. | GENERAL PLANNING CONSIDERATIONS | |
12-3. | CARDBOARD CARTONS | |
12-4. | PALLETIZED CARGO | |
12-5. | BAGGED, SACKED, AND BALED CARGO | |
12-6. | DRUMS | |
12-7. | WOODEN BOXES AND CRATES | |
12-8. | MACHINERY AND HEAVY-END ITEMS | |
12-9. | VEHICLES | |
12-10. | MIXED COMMODITIES | |
12-11. | PERISHABLES | |
CHAPTER 13 | CONTAINER HANDLING AND LABELING | |
13-1. | INTRODUCTION | |
13-2. | STRADDLE CRANES | |
13-3. | STRADDLE TRUCKS | |
13-4. | DOCKSIDE CONTAINER CRANES | |
13-4. | DOCKSIDE CONTAINER CRANES | |
13-4. | DOCKSIDE CONTAINER CRANES | |
13-6. | LABELING AND HANDLING OF CONTAINERS | |
13-7. | SPECIAL MARKINGS | |
13-8. | SECURING OF CONTAINERS | |
13-9. | LIFTING OF CONTAINERS | |
CHAPTER 14 | CONTAINER DOCUMENTATION | |
14-1. | INTRODUCTION | |
14-2. | SHIPMENT CLEARANCE | |
14-3. | BASIC DOCUMENTATION | |
14-4. | TALLYING CONTAINERS | |
CHAPTER 15 | CONTAINER CONSTRUCTION AND INSPECTION | |
15-1. | INTRODUCTION | |
15-2. | COMMERCIAL CONTAINER CONSTRUCTION | |
15-3. | CONDUCTING A CONTAINER ACCEPTANCE INSPECTION | |
PART FIVE | AIR TERMINAL OPERATIONS | |
CHAPTER 16 | AIR MOVEMENTS | |
16-1. | INTRODUCTION | |
16-2. | AIR MOBILITY COMMAND | |
16-3. | AIRCRAFT LOADING DATA | |
16-4. | DEPLOYING UNIT'S RESPONSIBILITIES | |
16-5. | LOADING UNIT'S RESPONSIBILITIES | |
16-6. | HAZARDOUS CARGO | |
16-7. | TROOP COMMANDER'S RESPONSIBILITIES | |
16-8. | SAFETY | |
CHAPTER 17 | DETERMINATION OF CENTER OF BALANCE AND CENTER OF GRAVITY | |
Section I.Center of Balance (Vehicles and General Cargo) | ||
17-1. | INTRODUCTION | |
17-2. | VEHICLE MEASUREMENTS | |
17-3. | WEIGHT AND CENTER OF BALANCE | |
Section II.Aircraft Center of Gravity (Weight and Balance) | ||
17-4. | CENTER OF GRAVITY | |
17-5. | WEIGHT AND BALANCE | |
CHAPTER 18 | 463L PALLETS AND SHORING | |
18-1. | INTRODUCTION | |
18-2. | CONSTRUCTION OF 463L PALLETS | |
18-3. | LOADING CARGO ON A 463L PALLET | |
18-4. | SECURING CARGO TO THE PALLET | |
18-5. | MULTI-PALLETIZATION | |
18-6. | STORAGE OF 463L PALLETS AND NETS | |
18-7. | CH-47 HICHS | |
18-8. | SHORING | |
PART SIX | RAIL AND INLAND WATER TERMINAL OPERATIONS | |
CHAPTER 19 | MOTOR TRANSPORT | |
19-1. | INTRODUCTION | |
19-2. | WEIGHT AND LOAD DISTRIBUTION | |
19-3. | RULES FOR LOADING | |
19-4. | UNITIZED LOADS | |
19-5. | EXPLOSIVES AND FLAMMABLE LIQUIDS | |
CHAPTER 20 | RAIL TRANSPORT | |
20-1. | INTRODUCTION | |
20-2. | PREPLANNING STAGE | |
20-3. | DETAILED PLANNING | |
20-4. | LOADING VEHICLES IN RAIL CARS | |
20-5. | LOADING UNITIZED CARGO IN RAIL CARS | |
20-6. | HAZARDOUS CARGO | |
20-7. | GENERAL RULES FOR LOADING | |
20-8. | IDLER CARS | |
20-9. | VEHICLE SECUREMENT | |
20-10. | MULTILEVEL FLATCARS | |
20-11. | CHAIN SECUREMENT | |
20-12. | CHAIN SECUREMENT OF A 2 1/2-TON TRUCK | |
APPENDIX A | CONVERSION FACTORS | |
APPENDIX B | WARNING LABELS | |
GLOSSARY | ||
REFERENCES | ||
AUTHORIZATION |
*This publication supersedes FM 55-17, 9 September 1990.
PREFACE
This manual provides guidance and technical information relevant to personnel who move supplies and materiel through water, motor, rail, and air terminals. The specific intent of this manual is to provide instructions in all phases of cargo handling with the emphasis on securing, loading, and unloading all types and configurations of cargo. Descriptions of cargo-handling gear are also provided in some detail.
The US Army's environmental strategy into the 21st century defines the Army's leadership commitment and philosophy for meeting present and future environmental challenges. It provides a framework to ensure that environmental stewardship ethic governs all Army activities. The Army's environmental vision is to be a national leader in environmental and natural resource stewardship for present and future generations, as an integral part of all Army missions. The Army's environmental vision statement communicates the Army's commitment to the environment.
The proponent of this publication is HQ TRADOC. Submit changes for improving this publication on DA Form 2028 (Recommended Changes to Publications and Blank Forms) and forward it to Commander, USACASCOM, Training Directorate, ATTN: ATCL-AT, 401 1st Street Suite 227, Fort Lee, VA 23801-1511.
Unless this publication states otherwise, masculine nouns and pronouns do not refer exclusively to men.
NEWSLETTER
|
Join the GlobalSecurity.org mailing list |
|
|