Appendix C
The Civil-Engineering Support Plan
Figure C-1 and Figure C-2 contain the information that is required for planning and executing a program to provide the facilities which are necessary for implementing individual OPLANs. This format is consistent with the references from CJCSM 3122.03.
The CESP identifies minimum-essential requirements in terms of HN provided, leased, and US provided (both contract and troops). After considering war-damage repair to facilities, then construction, material, and engineer-unit requirements are determined. Also, construction-support requirements such as beach preparation for LOTS operations, to include OPDS and IPDS operations, are considered.
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-1. Sample of an appendix to an annex of a USCINC****OPLAN (continued)
Figure C-2. Sample of a tab to an appendix of a USCINC****OPLAN
Table C-1. Construction standards
Construction Type | Initial | Temporary |
---|---|---|
Site preparation | Clearing and grading for facilities sites that include drainage, revetments for POL, ammo storage, aircraft parking, aggregate for heavily used hardstands, and soil stabilization | Preparing the engineering site (to include the pavement for vehicle traffic areas and aircraft parking) and building foundations and concrete floor slabs |
Troop housing | Erecting tents (may be wood frame and flooring) | Constructing wood-frame structures, relocatable structures, and mobile structures |
Electricity | Installing tactical generators with high- and low-voltage distribution systems | Installing nontactical generators with high- or low-voltage distribution systems |
Water | Locating water points, drilling wells, supporting other portable water-production operations, and installing pressurized water-distribution systems | Installing limited distribution systems to hospitals, dining halls, and other large users |
Cold storage | Installing portable refrigeration with freezer units for medical, food, and maintenance storage | Installing refrigeration in structures |
Sanitation | Constructing evaporative ponds, pits or burnout latrines, lagoons for hospitals, and sewage lift stations | Constructing austere waterborne waste-treatment facilities for high-priority structures (hospitals, dining halls, bath houses, and decontamination sites) |
Airfield pavement | Emplacing/constructing tactical surfaces, to include matting, aggregate, soil stabilization, and concrete pads | Emplacing/constructing conventional pavements1 |
Fuel storage | Emplacing fuel bladders | Emplacing fuel bladders and steel tanks and a limited distribution system |
1The type of airfield surfacing to be used will be based on the expected number, types, and weight of aircraft involved in the operations. |