Find a Security Clearance Job!

Military


Project 651 / Juliett

Specifications>
Displacement (tons): 3,174 Tons Surfaced
3,636 Tons with additional fuel
4,137 Tons Submerged
Speed (kts): 19 knots Surfaced
14 knots Dived
Operating Depth 775 ft maximum Safe Depth
1,200 ft crush depth
Dimensions (m): 297 ft (90 M) long
32.8 ft (10 M) beam
23 ft (7 M) draft
Propulsion 2 Main Diesel (3500 hp each)
2 Electric Motors (3000 hp each)
300 Tons Silver Zinc Batteries
2 Shafts/Propellers
2 Electric "Silent Run" (150 hp)
1 Diesel Generator (3000 hp)
Endurance: 90 days
9000 miles at 8kn Surfaced
18,000 miles at 7kn max. with additional fuel
810 miles submerged at 2,74 kn.
Crew 12 Officers, 16 NCO, 54 Crew
Armament:
  • 4 P-5 (P-6 or P-500) Guided Cruise Missiles
  • 6 Bow torpedo tubes - 21" (533 MM)
  • 4 Stern torpedo tubes - 16" (400 MM)
  • Electronics Radar

  • Sonar


  • NEWSLETTER
    Join the GlobalSecurity.org mailing list